HAM-Winton Woods Resurfacing
HAM County · est $0.4M
Bid dateThursday, February 15—
HAM County · est $0.4M
Published by ODOTon this contract’s Proposal PDF · EDGE Goal: 5%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount.
| Item | Quantity | R1Brown Construction & Paving CORP | R2Roberts Paving INC | R3John R Jurgensen Company | R4Rack & Ballauer Excavating CO INC | R5Barrett Paving Materials INC | % of bid |
|---|---|---|---|---|---|---|---|
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 1,227 CY | $152 | $156 | $159 | $185 | $155 | 69% |
| 690E50500 SPECIAL - CONCRETE PARKING BLOCK | 280 EACH | $72.00 | $137 | $95.00 | $80.00 | $65.00 | 7% |
| 407E20000 NON-TRACKING TACK COAT | 2,109 GAL | $6.40 | $9.00 | $3.00 | $4.00 | $2.50 | 5% |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 390 CY |
| $25.00 |
| $198 |
| $230 |
| $203 |
| $290 |
| 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $7,500 | $7,200 | $9,000 | $9,000 | $7,650 | 3% |
| 653E10000 TOPSOIL FURNISHED AND PLACED | 65 CY | $110 | $66.00 | $225 | $98.00 | $205 | 3% |
| 659E00511 SEEDING AND MULCHING, CLASS 2, AS PER PLAN | 3,030 SY | $1.90 | $2.10 | $1.70 | $1.35 | $2.41 | 2% |
| 202E52990 SPECIAL - PARKING BLOCK REMOVED | 278 EACH | $20.00 | $22.00 | $13.00 | $20.00 | $20.00 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $3,400 | $3,000 | $2,500 | $3,800 | $1,250 | 1% |
| 624E10000 MOBILIZATION | 1 LS | $2,500 | $4,000 | $4,000 | $3,000 | $7,000 | 1% |
| 642E00701 TRANSVERSE/DIAGONAL LINE, TYPE 1, AS PER PLAN | 400 FT | $5.00 | $0.95 | $2.00 | $1.83 | $1.83 | 1% |
| 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P | 1 LS | $1,500 | $2,900 | $3,000 | $4,000 | $3,500 | 1% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1 1/2" | 67 SY | $20.00 | $8.00 | $100 | $50.00 | $20.00 | 0% |
| 609E98000 CURB, MISC.: CURB REPAIR | 75 FT | $15.00 | $52.00 | $65.00 | $40.00 | $100 | 0% |
| 642E01702 HANDICAP SYMBOL MARKING, TYPE 1 | 11 EACH | $80.00 | $36.00 | $80.00 | $55.00 | $55.00 | 0% |
| 642E00500 STOP LINE, TYPE 1 | 56 FT | $14.00 | $5.55 | $12.00 | $6.00 | $6.00 | 0% |
| 642E01200 PARKING LOT STALL MARKING, TYPE 1 | 2,016 FT | $0.35 | $0.95 | $2.00 | $1.83 | $1.83 | 0% |
| 642E00300 CENTER LINE, TYPE 1 | 0.1 MILE | $5,000 | $4,799 | $12,000 | $10,640 | $10,640 | 0% |
| 642E01300 LANE ARROW, TYPE 1 | 4 EACH | $110 | $36.00 | $100 | $74.00 | $74.00 | 0% |
| 642E00400 CHANNELIZING LINE, 8", TYPE 1 | 75 FT | $4.00 | $1.85 | $9.00 | $4.00 | $4.00 | 0% |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 1,227 CY | $152 | $187k | 69% |
| 690E50500 SPECIAL - CONCRETE PARKING BLOCK | 280 EACH | $72 | $20k | 7% |
| 407E20000 NON-TRACKING TACK COAT | 2,109 GAL | $6.4 | $13k | 5% |
| 253E02001 PAVEMENT REPAIR, AS PER PLAN | 390 CY | $25 | $10k | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $7,500 | $8k | 3% |
| 653E10000 TOPSOIL FURNISHED AND PLACED | 65 CY | $110 | $7k | 3% |
| 659E00511 SEEDING AND MULCHING, CLASS 2, AS PER PLAN | 3,030 SY | $1.9 | $6k | 2% |
| 202E52990 SPECIAL - PARKING BLOCK REMOVED | 278 EACH | $20 | $6k | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $3,400 | $3k | 1% |
| 624E10000 MOBILIZATION | 1 LS | $2,500 | $3k | 1% |