MOE-SR 536-08.50
MOE County · est $0.4M
Bid dateThursday, June 7—
MOE County · est $0.4M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 28 more items below.
| Item | Quantity | R1Alan Stone CO INC | R2Shelly & Sands INC | R3Great Lakes Construction CO | R4R C Construction Company And Son INC | R5Ohio-west Virginia Excavating CO | R6Suburban Maintenance & Construction | % of bid |
|---|---|---|---|---|---|---|---|---|
| 524E94703 DRILLED SHAFTS, 36" DIAMETER, ABOVE BEDROCK, AS PE | 854 FT | $83.00 | $99.00 | $125 | $110 | $78.00 | $70.00 | 20% |
| 524E94705 DRILLED SHAFTS, 36" DIAMETER, INTO BEDROCK, AS PER | 360 FT | $115 | $120 | $145 | $195 | $158 | $185 | 12% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $34,000 | $20,000 |
| Item | Quantity | R1Alan Stone CO INC | R2Shelly & Sands INC | R3Great Lakes Construction CO | R4R C Construction Company And Son INC | R5Ohio-west Virginia Excavating CO | R6Suburban Maintenance & Construction |
|---|---|---|---|---|---|---|---|
| 202E23000 PAVEMENT REMOVED | 172 SY | $12.00 | $20.00 | $30.00 | $10.00 | $42.00 | $5.00 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 47 FT | $27.00 | $8.50 | $12.00 | $20.00 | $46.00 | $25.00 |
| 203E10000 EXCAVATION | 28 CY | $30.00 | $30.00 | $30.00 | $20.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $50,000 |
| $25,000 |
| $34,000 |
| $30,000 |
| 10% |
| 624E10000 MOBILIZATION | 1 LS | $33,000 | $10,000 | $45,000 | $10,000 | $29,325 | $40,000 | 9% |
| 507E00400 STEEL PILES, MISC.: SOLDIER PILES HP12X53 | 1,033 FT | $31.00 | $33.00 | $35.00 | $35.00 | $50.00 | $40.00 | 9% |
| 530E00400 SPECIAL - STRUCTURES PRECAST CONCRETE LAGGING NO. | 102 EACH | $215 | $240 | $215 | $200 | $320 | $250 | 6% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 72 CY | $237 | $297 | $225 | $325 | $292 | $310 | 5% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $15,000 | $2,500 | $5,000 | $5,500 | $5,000 | $20,000 | 4% |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 67 CY | $170 | $220 | $120 | $60.00 | $124 | $75.00 | 3% |
| 622E41000 PORTABLE BARRIER, 32" | 1,100 FT | $10.00 | $16.00 | $10.00 | $25.00 | $23.00 | $22.00 | 3% |
| 614E12338 WORK ZONE IMPACT ATTENUATOR (BIDIRECTIONAL) | 4 EACH | $2,400 | $2,500 | $1,850 | $2,500 | $3,400 | $3,000 | 3% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $8,000 | $7,500 | $5,000 | $5,500 | $6,250 | $7,500 | 2% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 36 CY | $200 | $326 | $190 | $300 | $375 | $290 | 2% |
| 611E07201 18" CONDUIT, TYPE A, AS PER PLAN, 706.02 | 41 FT | $172 | $160 | $90.00 | $125 | $100 | $145 | 2% |
| 614E12740 WORK ZONE LIGHTING SYSTEM | 1 EACH | $7,000 | $19,000 | $3,000 | $9,500 | $950 | $25,000 | 2% |
| 511E46511 CLASS QC1 CONCRETE, FOOTING, AS PER PLAN | 13 CY | $500 | $520 | $700 | $350 | $525 | $300 | 2% |
| 606E15050 GUARDRAIL, TYPE MGS | 225 FT | $26.00 | $24.50 | $24.20 | $35.00 | $38.00 | $22.20 | 2% |
| 304E20000 AGGREGATE BASE | 62 CY | $87.00 | $100 | $100 | $75.00 | $148 | $65.00 | 2% |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 48 FT | $105 | $19.00 | $10.00 | $10.00 | $15.00 | $5.00 | 1% |
| 606E26100 ANCHOR ASSEMBLY, TYPE E | 2 EACH | $2,378 | $2,300 | $2,265 | $2,700 | $1,900 | $5,000 | 1% |
| $59.00 |
| $20.00 |
| 203E20000 EMBANKMENT | 90 CY | $12.00 | $21.00 | $26.00 | $20.00 | $19.00 | $20.00 |
| 204E10000 SUBGRADE COMPACTION | 223 SY | $2.50 | $9.00 | $2.00 | $2.00 | $13.00 | $2.50 |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 2 CY | $1,008 | $450 | $210 | $275 | $680 | $500 |
| 659E10000 SEEDING AND MULCHING | 213 SY | $5.50 | $10.00 | $9.50 | $10.00 | $17.00 | $2.50 |
| 659E20000 COMMERCIAL FERTILIZER | 0.03 TON | $2,772 | $750 | $450 | $1,200 | $4,800 | $500 |
| 659E31000 LIME | 0.05 ACRE | $736 | $200 | $140 | $800 | $7,500 | $400 |
| 659E35000 WATER | 1 MGAL | $3.00 | $10.00 | $1.00 | $1.00 | $135 | $1.00 |
| 832E30000 EROSION CONTROL | 3,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $100 | $2,500 | $1,000 | $15,000 | $6,600 | $25,000 |
| 511E52100 CLASS QC FS CONCRETE | 12 CY | $220 | $375 | $200 | $450 | $360 | $200 |
| 602E20000 CONCRETE MASONRY | 0.33 CY | $1,659 | $3,750 | $1,025 | $1,500 | $5,500 | $2,500 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 2 EACH | $314 | $330 | $250 | $175 | $340 | $250 |
| 407E20000 NON-TRACKING TACK COAT | 126 GAL | $5.50 | $3.00 | $5.00 | $10.00 | $6.00 | $4.50 |
| 408E10000 PRIME COAT | 112 GAL | $13.00 | $8.00 | $12.00 | $20.00 | $32.00 | $11.00 |
| 617E10100 COMPACTED AGGREGATE | 14 CY | $143 | $140 | $150 | $75.00 | $340 | $210 |
| 621E00100 RPM | 16 EACH | $242 | $218 | $195 | $300 | $190 | $325 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 16 EACH | $11.00 | $15.00 | $5.00 | $50.00 | $20.00 | $50.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, BIDIRECTIONAL | 5 EACH | $7.50 | $8.00 | $7.00 | $10.00 | $34.00 | $100 |
| 642E00094 EDGE LINE, 6" | 0.24 MILE | $3,300 | $3,200 | $8,650 | $9,500 | $4,000 | $3,200 |
| 642E00290 CENTER LINE | 0.12 MILE | $6,200 | $6,000 | $8,650 | $9,500 | $7,600 | $6,000 |
| 614E13360 OBJECT MARKER, TWO WAY | 5 EACH | $69.00 | $18.25 | $17.00 | $20.00 | $61.00 | $50.00 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 204 FT | $7.50 | $6.25 | $10.00 | $10.00 | $11.00 | $8.00 |
| 518E40012 6" NON-PERFORATED CORRUGATED PLASTIC PIPE | 8 FT | $61.00 | $70.00 | $13.00 | $20.00 | $68.00 | $8.00 |
| 530E00400 SPECIAL - STRUCTURES PRECAST CONCRETE LAGGING NO. | 1 EACH | $1,300 | $550 | $600 | $3,500 | $2,350 | $1,000 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $2,500 | $2,730 | $5,000 | $17,500 | $6,500 | $10,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 524E94703 DRILLED SHAFTS, 36" DIAMETER, ABOVE BEDROCK, AS PE | 854 FT | $83 | $71k | 18% |
| 524E94705 DRILLED SHAFTS, 36" DIAMETER, INTO BEDROCK, AS PER | 360 FT | $115 | $41k | 11% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $34,000 | $34k | 9% |
| 624E10000 MOBILIZATION | 1 LS | $33,000 | $33k | 9% |
| 507E00400 STEEL PILES, MISC.: SOLDIER PILES HP12X53 | 1,033 FT | $31 | $32k | 8% |
| 530E00400 SPECIAL - STRUCTURES PRECAST CONCRETE LAGGING NO. | 102 EACH | $215 | $22k | 6% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 72 CY | $237 | $17k | 4% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $15,000 | $15k | 4% |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 67 CY | $170 | $11k | 3% |
| 622E41000 PORTABLE BARRIER, 32" | 1,100 FT | $10 | $11k | 3% |