NOB-SR 313-00.67
NOB County · est $0.2M
Bid dateThursday, October 25—
NOB County · est $0.2M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 17 more items below.
| Item | Quantity | R1Parker Corporation | R2Ohio-west Virginia Excavating CO | R3Shelly & Sands INC | R4Nls Paving, INC | R5Tucson INC | % of bid |
|---|---|---|---|---|---|---|---|
| 203E20000 EMBANKMENT | 1,530 CY | $15.00 | $18.00 | $24.25 | $14.00 | $38.00 | 15% |
| 203E10000 EXCAVATION | 1,399 CY | $15.00 | $13.00 | $15.50 | $10.50 | $21.00 | 14% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 47 CY | $400 | $250 | $600 | $310 | $450 | 12% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 22 CY | $550 | $275 | $500 | $310 | $625 | 8% |
| 203E35001 GRANULAR EMBANKMENT, AS PER PLAN | 117 CY | $90.00 | $160 | $90.00 | $93.00 | $85.00 | 7% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS |
| Item | Quantity | R1Parker Corporation | R2Ohio-west Virginia Excavating CO | R3Shelly & Sands INC | R4Nls Paving, INC | R5Tucson INC |
|---|---|---|---|---|---|---|
| 202E23000 PAVEMENT REMOVED | 103 SY | $5.00 | $30.25 | $13.00 | $33.00 | $35.00 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 42 FT | $10.00 | $30.00 | $8.50 | $65.00 | $35.00 |
| 204E10000 SUBGRADE COMPACTION | 85 SY | $1.00 | $10.00 | $10.00 | $2.50 | $3.00 |
| 204E50100 GEOTEXTILE FABRIC, 712.09, TYPE A | 279 SY | $2.00 | $4.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $10,000 |
| $38,000 |
| $11,000 |
| $15,000 |
| $26,000 |
| 7% |
| 624E10000 MOBILIZATION | 1 LS | $10,000 | $10,000 | $10,000 | $28,500 | $20,000 | 7% |
| 614E12338 WORK ZONE IMPACT ATTENUATOR (BIDIRECTIONAL) | 4 EACH | $1,500 | $2,300 | $2,000 | $2,650 | $2,000 | 4% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $6,000 | $2,000 | $250 | $2,500 | $4,000 | 4% |
| 611E05700 15" CONDUIT, TYPE A | 56 FT | $100 | $115 | $105 | $85.00 | $170 | 4% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $5,000 | $6,500 | $16,750 | $20,000 | $15,000 | 3% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $5,000 | $5,000 | $10,000 | $5,500 | $7,500 | 3% |
| 613E41200 LOW STRENGTH MORTAR BACKFILL | 34 CY | $124 | $200 | $86.00 | $165 | $115 | 3% |
| 832E30000 EROSION CONTROL | 3,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 2% |
| 622E41000 PORTABLE BARRIER, 32" | 300 FT | $10.00 | $18.00 | $30.00 | $40.00 | $33.00 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $2,500 | $3,000 | $1,175 | $1,250 | $5,500 | 2% |
| 408E10000 PRIME COAT | 65 GAL | $33.40 | $10.00 | $20.00 | $3.00 | $40.00 | 1% |
| 611E01400 6" CONDUIT, TYPE E, 707.31 (PERFORATED) | 175 FT | $10.00 | $14.00 | $0.90 | $6.00 | $35.00 | 1% |
| 304E20000 AGGREGATE BASE | 14 CY | $100 | $200 | $105 | $135 | $145 | 1% |
| 617E10100 COMPACTED AGGREGATE | 14 CY | $100 | $175 | $225 | $230 | $150 | 1% |
| $0.75 |
| $163 |
| $2.00 |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 3 CY | $100 | $195 | $200 | $390 | $450 |
| 659E10000 SEEDING AND MULCHING | 743 SY | $1.00 | $5.00 | $3.18 | $2.00 | $3.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.07 TON | $3,600 | $500 | $858 | $850 | $3,000 |
| 659E31000 LIME | 0.16 ACRE | $1,600 | $500 | $148 | $100 | $2,000 |
| 659E35000 WATER | 3 MGAL | $1.00 | $1.00 | $1.00 | $550 | $1.00 |
| 602E20000 CONCRETE MASONRY | 0.54 CY | $1,500 | $1,700 | $3,900 | $1,675 | $4,250 |
| 611E01500 6" CONDUIT, TYPE F, 707.33 | 65 FT | $10.00 | $20.00 | $14.00 | $6.00 | $35.00 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 2 EACH | $200 | $275 | $225 | $550 | $170 |
| 407E20000 NON-TRACKING TACK COAT | 96 GAL | $3.00 | $9.00 | $3.50 | $3.00 | $3.50 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 8 EACH | $20.00 | $15.00 | $14.00 | $78.00 | $65.00 |
| 642E00094 EDGE LINE, 6" | 0.16 MILE | $5,000 | $5,500 | $5,000 | $5,350 | $15,500 |
| 642E00290 CENTER LINE | 0.08 MILE | $10,000 | $12,000 | $10,000 | $10,650 | $16,000 |
| 614E12740 WORK ZONE LIGHTING SYSTEM | 1 EACH | $200 | $3,000 | $6,600 | $10,750 | $23,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 203E20000 EMBANKMENT | 1,530 CY | $15 | $23k | 14% |
| 203E10000 EXCAVATION | 1,399 CY | $15 | $21k | 13% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 47 CY | $400 | $19k | 12% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 22 CY | $550 | $12k | 8% |
| 203E35001 GRANULAR EMBANKMENT, AS PER PLAN | 117 CY | $90 | $11k | 7% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $10,000 | $10k | 6% |
| 624E10000 MOBILIZATION | 1 LS | $10,000 | $10k | 6% |
| 614E12338 WORK ZONE IMPACT ATTENUATOR (BIDIRECTIONAL) | 4 EACH | $1,500 | $6k | 4% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $6,000 | $6k | 4% |
| 611E05700 15" CONDUIT, TYPE A | 56 FT | $100 | $6k | 4% |