MED-SR 303-13.90/14.96
MED County · est $1.4M
Bid dateThursday, February 27—
MED County · est $1.4M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 10.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 91 more items below.
| Item | Quantity | R1Black Horse Bridge Construction INC | R2Stanley Miller Construction Company | R3J D Williamson Construction CO INC | R4Perk Company INC | R5Shelly & Sands INC | R6Lockhart Concrete CO | R7Independence Excavating INC | R8Mosser Construction INC | R9Great Lakes Construction CO | R10Ruhlin Company | % of bid |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 513E10260 STRUCTURAL STEEL MEMBERS, LEVEL 3 | 81,251 LB | $1.70 | $1.78 | $1.69 | $2.40 | $1.75 | $1.00 | $1.95 | $2.15 | $1.73 | $1.68 | 13% |
| Item | Quantity | R1Black Horse Bridge Construction INC | R2Stanley Miller Construction Company | R3J D Williamson Construction CO INC | R4Perk Company INC | R5Shelly & Sands INC | R6Lockhart Concrete CO | R7Independence Excavating INC | R8Mosser Construction INC | R9Great Lakes Construction CO | R10Ruhlin Company |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $9,000 | $8,167 | $15,000 | $7,500 | $9,000 | $49,000 | $15,000 | $15,000 | $10,000 | $53,000 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 524E94801 DRILLED SHAFTS, 42" DIAMETER, AS PER LAN | 552 FT | $225 | $270 | $270 | $245 | $170 | $149 | $250 | $300 | $210 | $175 | 12% |
| 511E34446 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK | 134 CY | $800 | $741 | $600 | $805 | $1,100 | $600 | $885 | $1,100 | $1,000 | $880 | 10% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 386 CY | $142 | $158 | $145 | $142 | $169 | $142 | $150 | $142 | $142 | $160 | 5% |
| 511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 47 CY | $1,150 | $603 | $825 | $1,515 | $2,000 | $1,000 | $750 | $1,200 | $2,275 | $1,555 | 5% |
| 503E21301 UNCLASSIFIED EXCAVATION, AS PER PLAN | 1 LS | $50,500 | $36,556 | $65,000 | $57,300 | $80,000 | $1,000 | $180,000 | $110,000 | $50,000 | $132,000 | 5% |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 4,539 SF | $9.80 | $20.28 | $9.90 | $8.00 | $7.00 | $11.00 | $10.00 | $9.80 | $9.80 | $9.80 | 4% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 44,105 LB | $1.00 | $1.04 | $1.00 | $1.35 | $1.00 | $0.88 | $0.91 | $1.20 | $1.10 | $1.11 | 4% |
| 526E25010 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1 | 200 SY | $218 | $229 | $245 | $269 | $270 | $300 | $250 | $220 | $300 | $285 | 4% |
| 507E00400 STEEL PILES, MISC.: SOLDIER PILES | 744 FT | $58.00 | $59.00 | $62.00 | $74.75 | $55.00 | $69.00 | $70.00 | $80.00 | $56.00 | $160 | 4% |
| 203E10000 EXCAVATION | 1,361 CY | $30.00 | $20.62 | $12.00 | $17.80 | $24.00 | $15.00 | $24.00 | $20.00 | $35.00 | $35.00 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $60,717 | $40,000 | $35,000 | $40,000 | $49,000 | $40,000 | $40,000 | $40,000 | $100,000 | 4% |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 4,539 SF | $8.80 | $2.73 | $8.90 | $10.00 | $7.00 | $11.00 | $10.00 | $8.80 | $8.80 | $9.80 | 4% |
| 203E20001 EMBANKMENT, AS PER PLAN | 1,395 CY | $28.00 | $18.25 | $40.00 | $56.40 | $20.00 | $32.50 | $70.00 | $40.00 | $70.00 | $76.05 | 4% |
| 202E11003 STRUCTURE REMOVED, OVER 20 FOOT SPAN, AS PER PLAN | 1 LS | $30,000 | $38,722 | $85,000 | $41,490 | $45,000 | $90,000 | $50,000 | $90,000 | $75,000 | $160,000 | 3% |
| 511E43512 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT INCLUDING | 71 CY | $400 | $584 | $530 | $630 | $1,300 | $550 | $555 | $550 | $850 | $1,225 | 3% |
| 507E00550 12" CAST-IN-PLACE REINFORCED CONCRETE PILES, FURNI | 920 FT | $30.00 | $29.25 | $25.50 | $30.10 | $25.00 | $23.00 | $35.00 | $30.00 | $43.75 | $51.00 | 3% |
| 517E70000 RAILING (TWIN STEEL TUBE) | 170 FT | $160 | $177 | $175 | $159 | $161 | $150 | $175 | $159 | $159 | $159 | 3% |
| 203E35001 GRANULAR EMBANKMENT, AS PER PLAN | 537 CY | $50.00 | $81.00 | $50.00 | $54.50 | $73.00 | $30.00 | $65.00 | $70.00 | $70.00 | $76.05 | 3% |
| 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION | 1 LS | $22,000 | $12,777 | $11,000 | $6,000 | $17,000 | $15,000 | $25,000 | $15,000 | $25,000 | $22,500 | 2% |
| 202E20010 HEADWALL REMOVED | 1 EACH | $500 | $200 | $1,500 | $450 | $500 | $250 | $250 | $300 | $125 | $430 |
| 202E23000 PAVEMENT REMOVED | 171 SY | $30.00 | $28.00 | $14.00 | $23.50 | $30.00 | $12.00 | $18.00 | $13.00 | $15.00 | $32.00 |
| 202E32800 CONCRETE SLOPE PROTECTION REMOVED | 103 SY | $20.00 | $19.00 | $15.00 | $39.50 | $20.00 | $10.00 | $22.00 | $12.00 | $10.00 | $30.00 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 104 FT | $15.00 | $10.00 | $11.00 | $25.85 | $28.00 | $20.00 | $61.00 | $15.00 | $15.00 | $20.00 |
| 202E38000 GUARDRAIL REMOVED | 772 FT | $2.00 | $2.00 | $1.50 | $2.50 | $2.00 | $1.40 | $1.40 | $1.40 | $1.40 | $1.40 |
| 202E53100 MAILBOX REMOVED | 1 EACH | $10.00 | $75.00 | $25.00 | $250 | $350 | $10.00 | $50.00 | $50.00 | $125 | $75.00 |
| 202E70110 SPECIAL - PIPE CLEANOUT, 24" AND UNDER | 40 FT | $25.00 | $28.00 | $11.00 | $64.00 | $55.00 | $50.00 | $8.00 | $75.00 | $40.00 | $69.25 |
| 202E75000 FENCE REMOVED | 88 FT | $2.00 | $2.00 | $2.00 | $3.50 | $8.00 | $5.00 | $1.60 | $1.60 | $10.15 | $1.60 |
| 203E20000 EMBANKMENT | 151 CY | $24.00 | $30.00 | $16.00 | $11.50 | $20.00 | $20.00 | $35.00 | $25.00 | $40.00 | $21.00 |
| 203E20001 EMBANKMENT, AS PER PLAN | 608 CY | $16.00 | $17.25 | $20.00 | $29.65 | $20.00 | $30.00 | $25.00 | $26.00 | $85.00 | $21.00 |
| 204E10000 SUBGRADE COMPACTION | 1,613 SY | $5.00 | $1.00 | $2.80 | $1.35 | $5.00 | $1.00 | $0.90 | $2.00 | $2.00 | $4.00 |
| 606E15050 GUARDRAIL, TYPE MGS | 388 FT | $17.00 | $18.90 | $18.00 | $17.00 | $18.00 | $17.00 | $18.00 | $16.98 | $16.98 | $17.50 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, MASH 2016 | 2 EACH | $2,385 | $2,333 | $2,350 | $2,100 | $2,600 | $2,100 | $2,200 | $2,100 | $2,100 | $2,300 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 4 EACH | $970 | $1,056 | $920 | $950 | $1,100 | $950 | $1,000 | $950 | $950 | $900 |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 2 EACH | $2,120 | $2,388 | $1,950 | $2,150 | $2,300 | $2,150 | $2,250 | $2,150 | $2,150 | $1,900 |
| 606E35003 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1, AS PER PLAN | 2 EACH | $2,480 | $2,389 | $2,800 | $2,150 | $2,700 | $2,150 | $2,250 | $2,150 | $2,150 | $2,750 |
| 623E38500 MONUMENT ASSEMBLY | 2 EACH | $1,000 | $1,250 | $600 | $700 | $1,200 | $225 | $225 | $1,000 | $650 | $960 |
| 690E50100 SPECIAL - MAILBOX SUPPORT SYSTEM, SINGLE | 1 EACH | $195 | $200 | $125 | $300 | $800 | $50.00 | $400 | $200 | $165 | $120 |
| 601E21050 TIED CONCRETE BLOCK MAT, TYPE 1 | 13 SY | $150 | $160 | $150 | $80.00 | $120 | $50.00 | $135 | $150 | $165 | $173 |
| 601E26000 DUMPED ROCK FILL, TYPE B | 8 CY | $125 | $167 | $100 | $126 | $200 | $100 | $120 | $120 | $265 | $185 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $100 | $112 | $100 | $250 | $100 | $200 | $100 | $300 | $100 | $88.00 |
| 659E00300 TOPSOIL | 209 CY | $43.00 | $48.00 | $42.00 | $55.00 | $50.00 | $25.00 | $60.00 | $35.00 | $43.00 | $57.00 |
| 659E10000 SEEDING AND MULCHING | 1,883 SY | $1.00 | $0.81 | $0.75 | $2.00 | $2.00 | $1.00 | $2.00 | $2.75 | $0.73 | $1.52 |
| 659E14000 REPAIR SEEDING AND MULCHING | 94 SY | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $2.00 | $2.00 | $1.00 | $1.00 | $0.68 |
| 659E15000 INTER-SEEDING | 94 SY | $1.00 | $1.00 | $2.00 | $1.00 | $1.00 | $2.00 | $2.00 | $1.00 | $1.00 | $0.68 |
| 659E20000 COMMERCIAL FERTILIZER | 0.26 TON | $800 | $889 | $800 | $500 | $800 | $650 | $650 | $500 | $800 | $685 |
| 659E31000 LIME | 0.39 ACRE | $100 | $200 | $70.00 | $500 | $200 | $450 | $75.00 | $200 | $1.00 | $152 |
| 659E35000 WATER | 10 MGAL | $1.00 | $1.00 | $1.00 | $100 | $1.00 | $50.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 832E30000 EROSION CONTROL | 3,400 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 836E10000 SEEDING AND EROSION CONTROL WITH TURF REINFORCING | 105 SY | $9.00 | $10.00 | $9.00 | $10.00 | $6.00 | $4.00 | $10.55 | $10.00 | $9.00 | $4.99 |
| 602E20000 CONCRETE MASONRY | 0.8 CY | $2,000 | $576 | $2,000 | $2,580 | $2,000 | $1,200 | $1,100 | $1,500 | $1,850 | $1,800 |
| 611E06100 15" CONDUIT, TYPE C | 49 FT | $48.00 | $110 | $50.00 | $60.00 | $100 | $75.00 | $120 | $100 | $60.00 | $85.00 |
| 611E10400 24" CONDUIT, TYPE B | 48 FT | $100 | $125 | $125 | $180 | $200 | $150 | $140 | $175 | $140 | $160 |
| 611E10600 24" CONDUIT, TYPE C | 32 FT | $60.00 | $120 | $85.00 | $150 | $200 | $100 | $190 | $130 | $170 | $130 |
| 611E98150 CATCH BASIN, NO. 3 | 1 EACH | $3,600 | $1,250 | $3,500 | $2,490 | $5,300 | $2,000 | $3,300 | $4,000 | $4,235 | $7,000 |
| 611E98510 CATCH BASIN, NO. 2-3 | 1 EACH | $2,750 | $4,528 | $1,300 | $1,980 | $2,800 | $1,400 | $2,200 | $1,500 | $1,830 | $3,500 |
| 611E99574 MANHOLE, NO. 3 | 1 EACH | $3,600 | $4,008 | $3,450 | $3,200 | $5,100 | $2,900 | $5,500 | $5,000 | $5,500 | $3,800 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, (3") | 354 SY | $15.00 | $16.67 | $15.00 | $15.00 | $40.00 | $15.00 | $15.50 | $15.00 | $15.00 | $19.21 |
| 304E20000 AGGREGATE BASE | 323 CY | $65.00 | $110 | $75.00 | $56.00 | $81.00 | $50.00 | $60.00 | $65.00 | $72.00 | $100 |
| 407E10000 TACK COAT | 262 GAL | $3.00 | $3.34 | $3.00 | $3.00 | $2.00 | $3.00 | $3.00 | $3.00 | $3.00 | $2.53 |
| 442E00201 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4 | 58 CY | $240 | $267 | $250 | $240 | $314 | $240 | $250 | $240 | $240 | $351 |
| 442E10501 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4 | 3 CY | $335 | $373 | $345 | $335 | $400 | $335 | $350 | $335 | $335 | $351 |
| 442E20201 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE | 80 CY | $195 | $217 | $200 | $195 | $244 | $195 | $205 | $195 | $195 | $291 |
| 609E26000 CURB, TYPE 6 | 150 FT | $40.00 | $39.00 | $32.00 | $21.60 | $43.00 | $30.00 | $30.00 | $26.50 | $35.00 | $26.00 |
| 621E00100 RPM | 7 EACH | $385 | $261 | $500 | $50.00 | $245 | $560 | $400 | $230 | $230 | $494 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 7 EACH | $25.00 | $25.00 | $20.00 | $50.00 | $70.00 | $65.00 | $101 | $20.00 | $9.00 | $7.60 |
| 626E00112 BARRIER REFLECTOR, TYPE 3, BI-DIRECTIONAL | 11 EACH | $8.00 | $9.45 | $10.00 | $8.50 | $8.00 | $8.50 | $9.00 | $8.50 | $10.00 | $15.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 10 FT | $22.00 | $8.67 | $12.00 | $14.00 | $24.00 | $8.00 | $15.00 | $14.00 | $18.00 | $12.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 1 EACH | $65.00 | $116 | $100 | $65.00 | $70.00 | $105 | $69.00 | $65.00 | $175 | $100 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 1 EACH | $10.00 | $71.00 | $20.00 | $25.00 | $11.00 | $64.00 | $26.00 | $25.00 | $20.00 | $20.00 |
| 642E00094 EDGE LINE, 6" | 0.18 MILE | $8,600 | $8,711 | $8,500 | $5,130 | $8,400 | $5,200 | $8,200 | $7,800 | $7,840 | $5,130 |
| 642E00290 CENTER LINE | 0.09 MILE | $8,600 | $8,705 | $13,250 | $6,840 | $8,300 | $7,000 | $8,200 | $7,900 | $7,835 | $6,840 |
| 646E10010 EDGE LINE, 6" | 0.06 MILE | $84,000 | $52,733 | $50,000 | $50,000 | $51,000 | $31,000 | $49,000 | $74,900 | $47,460 | $50,000 |
| 646E10200 CENTER LINE | 0.03 MILE | $84,000 | $52,889 | $60,000 | $50,000 | $51,000 | $41,000 | $49,000 | $75,000 | $47,600 | $60,000 |
| 614E12420 DETOUR SIGNING | 1 LS | $6,600 | $5,195 | $16,000 | $8,000 | $5,000 | $4,700 | $15,000 | $8,000 | $4,675 | $8,280 |
| 873E25000 WORK ZONE STOP LINE, CLASS I | 24 FT | $40.00 | $44.50 | $25.00 | $10.00 | $43.00 | $40.00 | $80.00 | $20.00 | $4.00 | $40.00 |
| 202E11000 STRUCTURE REMOVED | 1 LS | $10,000 | $4,333 | $15,000 | $10,000 | $7,000 | $49,000 | $5,000 | $6,000 | $2,000 | $7,000 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $3,000 | $12,889 | $20,000 | $5,000 | $12,000 | $20,000 | $1.00 | $1,000 | $10,000 | $12,500 |
| 509E10000 EPOXY COATED REINFORCING STEEL | 8,096 LB | $1.25 | $1.04 | $1.00 | $1.60 | $2.00 | $0.88 | $0.91 | $1.20 | $1.10 | $1.25 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 101 SY | $24.00 | $22.30 | $20.00 | $45.00 | $32.00 | $10.00 | $24.00 | $24.00 | $25.00 | $16.00 |
| 512E33001 TYPE 2 WATERPROOFING, AS PER PLAN | 24 SY | $78.00 | $23.00 | $25.00 | $30.00 | $43.00 | $15.00 | $23.00 | $26.00 | $30.00 | $44.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 10 SF | $10.00 | $3.25 | $6.00 | $15.00 | $20.00 | $5.00 | $9.00 | $14.00 | $20.00 | $12.83 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 5 CY | $100 | $437 | $80.00 | $445 | $240 | $59.00 | $80.00 | $200 | $310 | $350 |
| 518E39800 4" PERFORATED CORRUGATED PLASTIC PIPE | 133 FT | $10.00 | $6.42 | $18.00 | $7.50 | $4.00 | $10.00 | $6.00 | $15.00 | $9.50 | $15.00 |
| 518E39900 4" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 7 FT | $50.00 | $9.42 | $16.00 | $7.50 | $50.00 | $10.00 | $9.00 | $15.00 | $70.00 | $34.00 |
| 610E50010 RETAINING WALL, MISC.: GEOCOMPOSITE DRAIN | 723 SF | $5.00 | $2.30 | $7.00 | $15.00 | $5.00 | $5.00 | $3.00 | $6.00 | $6.50 | $6.00 |
| 610E50010 RETAINING WALL, MISC.: TIMBER LAGGING | 1,179 SF | $18.00 | $5.54 | $15.00 | $11.00 | $16.00 | $130 | $15.00 | $40.00 | $17.00 | $13.00 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 1 EACH | $150 | $100 | $285 | $250 | $460 | $450 | $530 | $230 | $330 | $300 |
| 202E22900 APPROACH SLAB REMOVED | 67 SY | $40.00 | $29.50 | $25.00 | $48.00 | $23.00 | $20.00 | $30.00 | $50.00 | $25.00 | $95.00 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $3,000 | $4,444 | $7,500 | $27,450 | $25,000 | $9,000 | $1.00 | $1,000 | $1.00 | $15,000 |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $4,000 | $22,766 | $20,000 | $41,300 | $31,000 | $2,000 | $30,000 | $1,000 | $22,000 | $49,500 |
| 507E00500 12" CAST-IN-PLACE REINFORCED CONCRETE PILES, DRIVE | 840 FT | $3.00 | $37.00 | $25.00 | $38.40 | $30.00 | $69.00 | $12.00 | $25.00 | $17.00 | $14.00 |
| 512E10050 SEALING OF CONCRETE SURFACES (NON-EPOXY) | 167 SY | $14.00 | $9.00 | $8.00 | $16.00 | $22.00 | $10.00 | $5.00 | $10.00 | $15.00 | $10.00 |
| 513E20000 WELDED STUD SHEAR CONNECTORS | 1,320 EACH | $7.30 | $8.11 | $3.50 | $4.00 | $4.00 | $7.30 | $4.21 | $7.30 | $3.50 | $3.45 |
| 514E10000 FINAL INSPECTION REPAIR | 5 EACH | $200 | $267 | $150 | $250 | $2.00 | $240 | $150 | $150 | $150 | $150 |
| 516E13200 1/2" PREFORMED EXPANSION JOINT FILLER | 80 SF | $3.00 | $1.00 | $4.00 | $7.85 | $6.00 | $1.00 | $2.50 | $6.00 | $12.00 | $9.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 112 SF | $5.00 | $1.60 | $6.00 | $9.20 | $9.00 | $2.00 | $3.60 | $7.00 | $15.00 | $8.50 |
| 516E14014 INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 80 FT | $25.00 | $26.00 | $40.00 | $77.00 | $40.00 | $20.00 | $25.00 | $50.00 | $30.00 | $125 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 76 CY | $80.00 | $87.00 | $85.00 | $85.00 | $95.00 | $50.00 | $65.00 | $80.00 | $100 | $90.00 |
| 518E22300 SPECIAL - STEEL DRIP STRIP | 202 FT | $16.00 | $11.30 | $12.00 | $14.50 | $20.00 | $10.00 | $7.00 | $20.00 | $14.35 | $20.00 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 102 FT | $8.00 | $9.00 | $13.00 | $13.25 | $7.00 | $5.00 | $7.50 | $17.00 | $10.00 | $16.00 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 71 FT | $12.00 | $8.00 | $13.00 | $13.25 | $7.00 | $7.00 | $9.50 | $17.00 | $27.00 | $18.00 |
| 523E20000 DYNAMIC LOAD TESTING | 1 EACH | $6,400 | $3,611 | $4,000 | $5,000 | $4,000 | $750 | $5,000 | $5,500 | $4,000 | $6,000 |
| 526E90010 TYPE A INSTALLATION | 74 FT | $124 | $115 | $75.00 | $155 | $150 | $100 | $160 | $170 | $205 | $192 |
| 601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH GEOTEXTILE FA | 133 CY | $80.00 | $91.00 | $85.00 | $97.85 | $63.00 | $120 | $90.00 | $70.00 | $125 | $130 |
| 846E00110 POLYMER MODIFIED ASPHALT EXPANSION JOINT SYSTEM | 31 CF | $360 | $294 | $270 | $70.00 | $300 | $254 | $264 | $265 | $311 | $447 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $17,000 | $16,444 | $15,000 | $18,750 | $10,000 | $59,000 | $25,000 | $12,000 | $9,500 | $13,000 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $10,000 | $3,444 | $5,000 | $19,500 | $3,000 | $90,000 | $14,500 | $5,000 | $15,000 | $10,000 |
| 619E16010 FIELD OFFICE, TYPE B | 5 MNTH | $2,000 | $1,000 | $2,500 | $1,925 | $3,000 | $500 | $1,605 | $2,200 | $3,500 | $1,500 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $5,000 | $32,803 | $15,000 | $14,250 | $28,000 | $47,000 | $15,000 | $13,000 | $15,000 | $60,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 513E10260 STRUCTURAL STEEL MEMBERS, LEVEL 3 | 81,251 LB | $1.7 | $138k | 10% |
| 524E94801 DRILLED SHAFTS, 42" DIAMETER, AS PER LAN | 552 FT | $225 | $124k | 9% |
| 511E34446 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK | 134 CY | $800 | $107k | 8% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 386 CY | $142 | $55k | 4% |
| 511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 47 CY | $1,150 | $54k | 4% |
| 503E21301 UNCLASSIFIED EXCAVATION, AS PER PLAN | 1 LS | $50,500 | $51k | 4% |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 4,539 SF | $9.8 | $44k | 3% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 44,105 LB | $1 | $44k | 3% |
| 526E25010 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1 | 200 SY | $218 | $44k | 3% |
| 507E00400 STEEL PILES, MISC.: SOLDIER PILES | 744 FT | $58 | $43k | 3% |