JEF-/COL-SR 7-31.13/00.00
JEF County · est $7.0M
Bid dateThursday, February 13—
JEF County · est $7.0M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 7.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 79 more items below.
| Item | Quantity | R1Shelly & Sands INC | R2Nls Paving, INC | R3Shelly Company | % of bid |
|---|---|---|---|---|---|
| 442E10351 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE B ( | 14,697 CY | $148 | $165 | $180 | 36% |
| 622E10100 CONCRETE BARRIER, SINGLE SLOPE, TYPE B1 | 13,266 FT | $87.00 | $94.00 | $105 | 19% |
| 622E41000 PORTABLE BARRIER, 32" | 34,740 FT | $12.50 | $8.00 | $9.45 | 7% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (1-1/2") | 336,309 SY | $1.00 | $0.75 | $1.50 | 6% |
| 305E13010 9" CONCRETE BASE, CLASS QC 1P | 6,069 SY | $55.00 | $64.00 | $65.00 | 6% |
| Item | Quantity | R1Shelly & Sands INC | R2Nls Paving, INC | R3Shelly Company |
|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $1,500 | $2,200 | $6,000 |
| 202E23010 PAVEMENT REMOVED, ASPHALT | 810 SY | $6.00 | $12.00 | $22.00 |
| 202E30000 WALK REMOVED | 366 SF | $3.00 | $3.00 | $12.50 |
| 202E32000 CURB REMOVED | 112 FT | $10.00 | $17.00 | $25.00 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 312 FT | $14.00 | $15.00 | $35.00 |
| 202E52990 SPECIAL - PARKING BLOCK REMOVED | 24 EACH |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 622E25007 CONCRETE BARRIER, END ANCHORAGE, REINFORCED, TYPE | 67 EACH | $3,400 | $3,000 | $3,000 | 4% |
| 611E99100 INLET, NO. 3 FOR SINGLE SLOPE BARRIER, TYPE B1 | 23 EACH | $9,250 | $10,000 | $10,000 | 4% |
| 255E10011 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT, | 960 SY | $212 | $224 | $400 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $151,500 | $200,000 | $200,000 | 3% |
| 202E30700 CONCRETE BARRIER REMOVED | 14,551 FT | $7.00 | $6.75 | $23.00 | 2% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $101,500 | $302,000 | $583,500 | 2% |
| 519E11100 PATCHING CONCRETE STRUCTURE | 950 SF | $100 | $90.00 | $95.00 | 2% |
| 646E10010 EDGE LINE, 6" | 32.84 MILE | $2,800 | $2,635 | $2,635 | 2% |
| 407E20000 NON-TRACKING TACK COAT | 30,002 GAL | $2.75 | $2.80 | $2.85 | 1% |
| 304E20000 AGGREGATE BASE | 1,108 CY | $58.00 | $85.00 | $65.00 | 1% |
| 255E20000 FULL DEPTH PAVEMENT SAWING | 34,180 FT | $1.60 | $2.95 | $1.70 | 1% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 225 CY | $229 | $185 | $190 | 1% |
| 808E18700 DIGITAL SPEED LIMIT (DSL) SIGN ASSEMBLY | 54 SNMT | $950 | $900 | $665 | 1% |
| 617E10100 COMPACTED AGGREGATE | 1,015 CY | $50.00 | $53.00 | $62.00 | 1% |
| 846E00111 POLYMER MODIFIED ASPHALT EXPANSION JOINT SYSTEM, A | 116 CF | $400 | $462 | $500 | 1% |
| $85.00 |
| $45.00 |
| $50.00 |
| 202E58200 INLET REMOVED | 24 EACH | $125 | $350 | $2,400 |
| 202E70110 SPECIAL - PIPE CLEANOUT, 24" AND UNDER | 1,550 FT | $10.00 | $12.00 | $20.00 |
| 202E70120 SPECIAL - PIPE CLEANOUT, 27" TO 48" | 210 FT | $13.00 | $16.00 | $30.00 |
| 209E60500 LINEAR GRADING | 15.63 MILE | $1,600 | $850 | $1,000 |
| 606E60012 IMPACT ATTENUATOR, TYPE 1 (BIDIRECTIONAL) | 1 EACH | $6,500 | $6,300 | $5,895 |
| 607E98000 FENCE, MISC.: TEMPORARY ORANGE PLASTIC CONSTRUCTIO | 275 FT | $4.00 | $3.00 | $11.00 |
| 608E52000 CURB RAMP | 405 SF | $30.00 | $25.00 | $20.00 |
| 618E40100 RUMBLE STRIPS, SHOULDER (ASPHALT CONCRETE) | 100,843 FT | $0.20 | $0.20 | $0.18 |
| 622E10200 BARRIER TRANSITION | 8 EACH | $3,000 | $7,000 | $6,000 |
| 622E24850 CONCRETE BARRIER END SECTION, TYPE B1 | 1 EACH | $6,000 | $9,000 | $10,000 |
| 622E25007 CONCRETE BARRIER, END ANCHORAGE, REINFORCED, TYPE | 1 EACH | $4,500 | $3,000 | $3,000 |
| 622E25007 CONCRETE BARRIER, END ANCHORAGE, REINFORCED, TYPE | 1 EACH | $4,500 | $3,000 | $6,000 |
| 622E25007 CONCRETE BARRIER, END ANCHORAGE, REINFORCED, TYPE | 1 EACH | $2,500 | $2,000 | $4,000 |
| 622E25007 CONCRETE BARRIER, END ANCHORAGE, REINFORCED, TYPE | 1 EACH | $2,750 | $2,000 | $4,000 |
| 622E25007 CONCRETE BARRIER, END ANCHORAGE, REINFORCED, TYPE | 1 EACH | $5,000 | $4,000 | $1,600 |
| 622E25007 CONCRETE BARRIER, END ANCHORAGE, REINFORCED, TYPE | 1 EACH | $5,000 | $4,000 | $3,500 |
| 626E00102 BARRIER REFLECTOR, TYPE 1 (ONE-WAY) | 612 EACH | $9.00 | $8.75 | $8.75 |
| 690E50500 SPECIAL - CONCRETE PARKING BLOCK | 24 EACH | $250 | $90.00 | $300 |
| 659E98000 SEEDING, MISC.: CURB RAMP GRADING RESTORATION | 21 SY | $65.00 | $10.00 | $120 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 |
| 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS | 216 FT | $20.00 | $18.00 | $20.00 |
| 611E04400 12" CONDUIT, TYPE B | 208 FT | $80.00 | $80.00 | $180 |
| 611E05900 15" CONDUIT, TYPE B | 16 FT | $100 | $85.00 | $200 |
| 611E07400 18" CONDUIT, TYPE B | 24 FT | $101 | $80.00 | $210 |
| 611E08900 21" CONDUIT, TYPE B | 64 FT | $105 | $105 | $230 |
| 611E99101 INLET, NO. 3 FOR SINGLE SLOPE BARRIER, TYPE B1, AS | 1 EACH | $10,000 | $11,500 | $14,000 |
| 251E01010 PARTIAL DEPTH PAVEMENT REPAIR (441) | 60 CY | $525 | $350 | $600 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (VARIES) | 3,240 SY | $5.00 | $5.75 | $2.00 |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 81 CY | $298 | $280 | $200 |
| 408E10001 PRIME COAT, AS PER PLAN | 7,336 GAL | $2.75 | $3.00 | $3.75 |
| 442E00100 ANTI-SEGREGATION EQUIPMENT | 9,079 CY | $3.00 | $5.00 | $1.00 |
| 609E70000 4" CONCRETE MEDIAN | 125 SY | $69.00 | $75.00 | $102 |
| 621E00100 RPM | 1,304 EACH | $24.00 | $23.00 | $23.75 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 1,236 EACH | $3.00 | $3.00 | $8.48 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 13.2 FT | $11.00 | $25.00 | $25.00 |
| 630E55000 CONCRETE BARRIER MEDIAN OVERHEAD SIGN SUPPORT FOUN | 2 EACH | $13,000 | $14,000 | $15,375 |
| 630E55001 CONCRETE BARRIER MEDIAN OVERHEAD SIGN SUPPORT FOUN | 1 EACH | $6,500 | $15,900 | $12,740 |
| 630E74701 OVERHEAD SIGN SUPPORT MODIFICATION, AS PER PLAN | 3 EACH | $15,000 | $14,850 | $14,620 |
| 630E80100 SIGN, FLAT SHEET | 2.5 SF | $40.00 | $38.00 | $38.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 1 EACH | $50.00 | $10.00 | $10.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 1 EACH | $50.00 | $15.00 | $15.00 |
| 646E10110 LANE LINE, 6" | 14.45 MILE | $1,550 | $1,440 | $1,440 |
| 646E10200 CENTER LINE | 0.24 MILE | $8,000 | $6,800 | $6,800 |
| 646E10300 CHANNELIZING LINE, 8" | 1,325 FT | $2.00 | $1.30 | $1.30 |
| 646E10310 CHANNELIZING LINE, 12" | 5,708 FT | $2.10 | $1.70 | $1.70 |
| 646E10400 STOP LINE | 255 FT | $15.00 | $10.35 | $10.35 |
| 646E10600 TRANSVERSE/DIAGONAL LINE | 710 FT | $10.00 | $8.20 | $8.20 |
| 646E10601 TRANSVERSE/DIAGONAL LINE, AS PER PLAN | 330 FT | $2.50 | $2.25 | $2.25 |
| 646E10620 CHEVRON MARKING | 720 FT | $10.00 | $9.00 | $9.00 |
| 646E10800 ISLAND MARKING | 550 SF | $6.00 | $5.50 | $5.50 |
| 646E10900 HANDICAP SYMBOL MARKING | 3 EACH | $300 | $150 | $150 |
| 646E20200 PARKING LOT STALL MARKING | 2,007 FT | $3.00 | $1.50 | $1.50 |
| 646E20300 LANE ARROW | 10 EACH | $210 | $195 | $195 |
| 646E20320 WRONG WAY ARROW | 5 EACH | $350 | $320 | $320 |
| 646E20504 DOTTED LINE, 6" | 6,986 FT | $1.25 | $1.20 | $1.20 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 200 HOUR | $65.00 | $73.00 | $65.00 |
| 614E12336 WORK ZONE IMPACT ATTENUATOR (UNIDIRECTIONAL) | 8 EACH | $2,100 | $2,000 | $2,200 |
| 614E12460 WORK ZONE MARKING SIGN | 20 EACH | $100 | $90.00 | $95.00 |
| 614E12484 WORK ZONE INCREASED PENALTIES SIGN | 34 EACH | $100 | $90.00 | $165 |
| 614E12500 REPLACEMENT SIGN | 10 EACH | $150 | $150 | $165 |
| 614E12600 REPLACEMENT DRUM | 10 EACH | $90.00 | $80.00 | $55.00 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 50 CY | $122 | $225 | $120 |
| 614E13310 BARRIER REFLECTOR, TYPE 1 (ONE-WAY) | 694 EACH | $8.00 | $12.50 | $12.00 |
| 614E13350 OBJECT MARKER, ONE WAY | 694 EACH | $12.00 | $9.00 | $13.00 |
| 614E20550 WORK ZONE LANE LINE, CLASS III, 4", 642 PAINT | 27.92 MILE | $400 | $650 | $375 |
| 614E22350 WORK ZONE EDGE LINE, CLASS III, 4", 642 PAINT | 65.14 MILE | $435 | $730 | $400 |
| 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 8", 642 PA | 2,650 FT | $0.50 | $1.00 | $0.50 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 510 FT | $2.00 | $9.00 | $2.00 |
| 846E00111 POLYMER MODIFIED ASPHALT EXPANSION JOINT SYSTEM, A | 88 CF | $400 | $462 | $450 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $20,000 | $30,000 | $45,000 |
| 108E30000 CPM PROGRESS SCHEDULE SHORT DURATION PROJECTS | 1 LS | $4,000 | $2,500 | $15,000 |
| 619E16020 FIELD OFFICE, TYPE C | 4 MNTH | $2,000 | $2,800 | $4,200 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $14,000 | $40,000 | $25,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 442E10351 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE B ( | 14,697 CY | $148 | $2.18M | 32% |
| 622E10100 CONCRETE BARRIER, SINGLE SLOPE, TYPE B1 | 13,266 FT | $87 | $1.15M | 17% |
| 622E41000 PORTABLE BARRIER, 32" | 34,740 FT | $12.5 | $434k | 6% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (1-1/2") | 336,309 SY | $1 | $336k | 5% |
| 305E13010 9" CONCRETE BASE, CLASS QC 1P | 6,069 SY | $55 | $334k | 5% |
| 622E25007 CONCRETE BARRIER, END ANCHORAGE, REINFORCED, TYPE | 67 EACH | $3,400 | $228k | 3% |
| 611E99100 INLET, NO. 3 FOR SINGLE SLOPE BARRIER, TYPE B1 | 23 EACH | $9,250 | $213k | 3% |
| 255E10011 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT, | 960 SY | $212 | $204k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $151,500 | $152k | 2% |
| 202E30700 CONCRETE BARRIER REMOVED | 14,551 FT | $7 | $102k | 2% |