MAR-US 23-11.50
MAR County · est $3.6M
Bid dateThursday, February 13—
MAR County · est $3.6M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 10.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 157 more items below.
| Item | Quantity | R1Complete General Construction Company | R2Shelly & Sands INC | R3Double Z Construction Company | R4Mosser Construction INC | R5Eagle Bridge CO | % of bid |
|---|---|---|---|---|---|---|---|
| 511E21522 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE | 284 CY | $850 | $870 | $1,100 | $900 | $1,150 | 11% |
| 511E21522 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE | 284 CY | $850 | $870 | $1,100 | $900 | $1,150 | 11% |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 11,628 FT | $16.60 | $17.00 | $16.60 | $16.60 | $16.64 |
| Item | Quantity | R1Complete General Construction Company | R2Shelly & Sands INC | R3Double Z Construction Company | R4Mosser Construction INC | R5Eagle Bridge CO |
|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $14,000 | $23,000 | $23,000 | $5,000 | $5,000 |
| 202E23000 PAVEMENT REMOVED, (FULL-DEPTH) | 1,494 SY | $10.00 | $16.00 | $20.00 | $26.00 | $20.00 |
| 202E38000 GUARDRAIL REMOVED | 12,322 FT | $1.60 | $2.00 | $1.60 | $1.60 | $1.60 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 9% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22, 9.0" DEPTH | 521 CY | $255 | $255 | $310 | $235 | $256 | 6% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $130,000 | $102,000 | $160,000 | $225,000 | $145,000 | 6% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $130,000 | $102,000 | $160,000 | $225,000 | $145,000 | 6% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $120,000 | $87,000 | $130,000 | $125,000 | $135,000 | 5% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $120,000 | $87,000 | $130,000 | $125,000 | $135,000 | 5% |
| 622E41000 PORTABLE BARRIER, 32" | 8,328 FT | $14.00 | $11.00 | $14.00 | $15.00 | $8.00 | 5% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $100,000 | $105,000 | $100,000 | $100,000 | 4% |
| 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION | 1,196 SY | $70.00 | $56.00 | $50.00 | $55.00 | $70.00 | 4% |
| 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION | 1,196 SY | $70.00 | $56.00 | $50.00 | $55.00 | $70.00 | 4% |
| 203E20000 EMBANKMENT | 9,636 CY | $8.00 | $17.00 | $13.00 | $11.00 | $14.00 | 3% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 76,493 LB | $1.00 | $1.20 | $1.10 | $1.25 | $1.10 | 3% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 76,493 LB | $1.00 | $1.20 | $1.10 | $1.25 | $1.10 | 3% |
| 848E10200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY USING HYDR | 1,196 SY | $60.00 | $61.00 | $65.00 | $75.00 | $80.00 | 3% |
| 848E10200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY USING HYDR | 1,196 SY | $60.00 | $61.00 | $65.00 | $75.00 | $80.00 | 3% |
| 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION | 999 SY | $70.00 | $66.00 | $50.00 | $60.00 | $70.00 | 3% |
| 442E20000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 130 CY | $500 | $500 | $575 | $350 | $501 | 3% |
| 848E10200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY USING HYDR | 999 SY | $65.00 | $70.00 | $65.00 | $65.00 | $100 | 3% |
| 6 EACH |
| $255 |
| $400 |
| $255 |
| $255 |
| $256 |
| 202E47000 BRIDGE TERMINAL ASSEMBLY REMOVED | 16 EACH | $65.00 | $100 | $65.00 | $65.00 | $65.15 |
| 202E47800 IMPACT ATTENUATOR REMOVED | 4 EACH | $185 | $200 | $185 | $185 | $185 |
| 202E75000 FENCE REMOVED | 64 FT | $2.40 | $2.30 | $31.19 | $8.00 | $2.41 |
| 203E10000 EXCAVATION | 7,332 CY | $6.00 | $10.00 | $13.00 | $12.00 | $12.00 |
| 204E10000 SUBGRADE COMPACTION | 1,998 SY | $2.50 | $3.50 | $5.00 | $4.00 | $6.00 |
| 204E45000 PROOF ROLLING | 2 HOUR | $100 | $165 | $160 | $100 | $150 |
| 209E60500 LINEAR GRADING | 2.46 MILE | $2,950 | $2,600 | $5,000 | $2,950 | $3,000 |
| 601E21060 TIED CONCRETE BLOCK MAT, TYPE 2 | 102 SY | $65.00 | $64.00 | $95.00 | $160 | $65.00 |
| 605E31100 AGGREGATE DRAINS | 368 FT | $17.00 | $21.00 | $15.00 | $16.00 | $8.00 |
| 606E15050 GUARDRAIL, TYPE MGS | 679 FT | $15.40 | $15.80 | $15.40 | $15.40 | $15.44 |
| 606E15550 GUARDRAIL, BARRIER DESIGN, TYPE MGS | 85 FT | $27.20 | $27.50 | $27.20 | $27.20 | $27.26 |
| 606E26100 ANCHOR ASSEMBLY, TYPE E | 6 EACH | $2,100 | $2,150 | $2,100 | $2,100 | $2,105 |
| 606E26500 ANCHOR ASSEMBLY, TYPE T | 6 EACH | $725 | $900 | $725 | $725 | $727 |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 12 EACH | $1,970 | $2,000 | $1,970 | $1,970 | $1,975 |
| 606E35102 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 2 | 4 EACH | $450 | $450 | $450 | $450 | $451 |
| 606E60012 IMPACT ATTENUATOR, TYPE 1 (BIDIRECTIONAL) | 4 EACH | $4,240 | $4,200 | $4,344 | $4,240 | $4,250 |
| 607E15100 FENCE, TYPE 47RA | 64 FT | $20.50 | $21.00 | $20.50 | $20.50 | $20.55 |
| 609E24510 CURB, TYPE 4-C | 48 FT | $48.00 | $55.00 | $30.00 | $58.00 | $60.00 |
| 620E00500 DELINEATOR, POST GROUND MOUNTED | 6 EACH | $50.00 | $45.00 | $55.00 | $55.00 | $55.13 |
| 626E00102 BARRIER REFLECTOR, TYPE 1, ONE WAY | 131 EACH | $12.00 | $6.00 | $7.40 | $7.40 | $7.42 |
| 659E00300 TOPSOIL | 1,391 CY | $20.00 | $8.00 | $36.00 | $18.00 | $5.00 |
| 659E10000 SEEDING AND MULCHING | 14,663 SY | $0.74 | $0.70 | $0.54 | $0.80 | $1.00 |
| 659E20000 COMMERCIAL FERTILIZER | 1.7 TON | $779 | $455 | $500 | $400 | $450 |
| 659E31000 LIME | 2.6 ACRE | $180 | $5.30 | $200 | $20.00 | $20.00 |
| 659E35000 WATER | 0.15 MGAL | $1.00 | $500 | $1.00 | $667 | $667 |
| 670E00500 SLOPE EROSION PROTECTION | 14,663 SY | $1.31 | $1.20 | $1.72 | $2.45 | $2.50 |
| 832E30000 EROSION CONTROL | 5,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.5" DEPTH | 1,638 SY | $20.00 | $20.00 | $12.00 | $15.00 | $20.05 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 3.0" DEPTH | 74 SY | $35.00 | $35.00 | $35.00 | $25.00 | $35.08 |
| 304E20000 AGGREGATE BASE, 6.0" DEPTH | 366 CY | $80.00 | $84.00 | $85.00 | $80.00 | $100 |
| 407E10000 TACK COAT | 360 GAL | $1.95 | $1.95 | $3.50 | $2.00 | $1.95 |
| 442E20000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 71 CY | $785 | $785 | $625 | $300 | $787 |
| 617E10100 COMPACTED AGGREGATE, TYPE A | 124 CY | $90.00 | $117 | $125 | $75.00 | $100 |
| 618E40100 RUMBLE STRIPS, SHOULDER (ASPHALT CONCRETE) | 5,400 FT | $1.00 | $1.00 | $0.75 | $10.00 | $2.00 |
| 621E00100 RPM | 103 EACH | $53.00 | $50.00 | $49.00 | $49.00 | $50.00 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 103 EACH | $17.00 | $10.00 | $10.00 | $15.00 | $20.00 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 170 FT | $14.50 | $10.00 | $10.00 | $14.50 | $14.53 |
| 630E81100 SIGN ERECTED, FLAT SHEET | 30 SF | $24.00 | $15.00 | $15.00 | $24.00 | $24.06 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 10 EACH | $10.00 | $15.00 | $15.00 | $10.00 | $10.02 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 10 EACH | $15.00 | $15.00 | $15.00 | $10.00 | $15.04 |
| 644E00104 EDGE LINE, 6", (WHITE) | 0.68 MILE | $4,228 | $4,700 | $5,461 | $5,709 | $4,636 |
| 644E00104 EDGE LINE, 6", (YELLOW) | 0.38 MILE | $4,228 | $4,700 | $5,461 | $5,709 | $4,636 |
| 644E00200 LANE LINE, 4", (WHITE) | 1.66 MILE | $2,114 | $1,600 | $1,853 | $1,937 | $1,573 |
| 646E10010 EDGE LINE, 6", (WHITE) | 0.48 MILE | $11,857 | $11,700 | $13,609 | $14,227 | $11,552 |
| 646E10010 EDGE LINE, 6", (YELLOW) | 0.21 MILE | $11,857 | $11,700 | $13,609 | $14,227 | $11,552 |
| 646E10100 LANE LINE, 4", (WHITE) | 0.22 MILE | $5,945 | $6,300 | $7,426 | $7,763 | $6,303 |
| 646E10200 CENTER LINE | 0.14 MILE | $23,715 | $17,600 | $20,762 | $21,703 | $17,622 |
| 614E11300 SPECIAL - WORK ZONE TRAFFIC SIGNAL | 1 EACH | $11,000 | $10,000 | $5,000 | $13,000 | $12,000 |
| 614E11630 INCREASED BARRIER DELINEATION | 4,240 FT | $0.50 | $0.40 | $1.00 | $5.00 | $1.00 |
| 614E12336 WORK ZONE IMPACT ATTENUATOR (UNIDIRECTIONAL) | 10 EACH | $1,900 | $2,000 | $2,500 | $1,865 | $1,875 |
| 614E12338 WORK ZONE IMPACT ATTENUATOR (BIDIRECTIONAL) | 4 EACH | $1,950 | $2,000 | $2,500 | $1,865 | $1,875 |
| 614E12500 REPLACEMENT SIGN | 4 EACH | $200 | $260 | $150 | $100 | $200 |
| 614E12600 REPLACEMENT DRUM | 15 EACH | $75.00 | $50.00 | $35.00 | $75.00 | $40.00 |
| 614E13310 BARRIER REFLECTOR, TYPE 1, ONE WAY | 36 EACH | $11.00 | $7.00 | $10.00 | $10.00 | $6.00 |
| 614E13350 OBJECT MARKER, ONE WAY | 158 EACH | $13.00 | $13.00 | $15.00 | $10.00 | $10.00 |
| 614E18600 PORTABLE CHANGEABLE MESSAGE SIGN | 18 SNMT | $1,050 | $875 | $900 | $1,000 | $852 |
| 614E22000 WORK ZONE EDGE LINE, CLASS I, 4" | 6.3 MILE | $1,285 | $810 | $1,321 | $1,085 | $802 |
| 614E24000 WORK ZONE DOTTED LINE, CLASS I | 8,362 FT | $0.75 | $0.80 | $1.32 | $1.08 | $0.80 |
| 644E00500 STOP LINE, TEMPORARY | 24 FT | $81.20 | $18.00 | $28.00 | $23.05 | $17.04 |
| 808E18700 DIGITAL SPEED LIMIT (DSL) SIGN ASSEMBLY | 36 SNMT | $700 | $775 | $750 | $1,000 | $752 |
| 509E10000 EPOXY COATED REINFORCING STEEL | 14,499 LB | $1.43 | $1.30 | $1.50 | $1.75 | $1.50 |
| 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT | 1,296 EACH | $9.00 | $26.00 | $19.00 | $25.00 | $12.00 |
| 511E34410 CLASS QC2 CONCRETE, SUPERSTRUCTURE | 94 CY | $560 | $500 | $600 | $525 | $700 |
| 511E45710 CLASS QC1 CONCRETE, ABUTMENT | 9 CY | $1,050 | $1,400 | $800 | $1,000 | $1,400 |
| 512E10051 SEALING OF CONCRETE SURFACES (NON-EPOXY), AS PER P | 744 SY | $8.50 | $8.50 | $8.50 | $13.00 | $8.52 |
| 516E10000 PREFORMED ELASTOMERIC COMPRESSION JOINT SEAL | 60 FT | $37.90 | $23.00 | $25.00 | $48.00 | $40.00 |
| 516E12300 STRIP SEAL EXPANSION JOINT ANCHORED WITH ELASTOMER | 70 FT | $350 | $307 | $295 | $250 | $350 |
| 518E62200 STRUCTURE DRAINAGE, MISC.: DRAIN CLEANING | 22 EACH | $350 | $78.00 | $55.00 | $80.00 | $30.00 |
| 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN | 76 SF | $150 | $130 | $160 | $85.00 | $145 |
| 848E30200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY (VARIABLE | 40 CY | $190 | $145 | $190 | $240 | $200 |
| 848E50000 HAND CHIPPING | 45 SY | $70.00 | $80.00 | $85.00 | $125 | $65.00 |
| 848E50100 TEST SLAB | 1 LS | $800 | $1,150 | $600 | $650 | $1,000 |
| 848E50200 FULL-DEPTH REPAIR | 1 CY | $1,200 | $446 | $1,100 | $1,400 | $1,500 |
| 848E50320 EXISTING CONCRETE OVERLAY REMOVED1 1/2" THICK | 934 SY | $9.50 | $13.50 | $11.00 | $16.00 | $12.00 |
| 848E50340 REMOVAL OF DEBONDED OR DETERIORATED EXISTING VARIA | 486 SY | $27.00 | $35.00 | $10.00 | $80.00 | $10.00 |
| 509E10000 EPOXY COATED REINFORCING STEEL | 14,499 LB | $1.43 | $1.30 | $1.50 | $1.75 | $1.50 |
| 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT | 1,296 EACH | $9.00 | $25.00 | $19.00 | $25.00 | $12.00 |
| 511E34410 CLASS QC2 CONCRETE, SUPERSTRUCTURE | 94 CY | $560 | $500 | $600 | $525 | $700 |
| 511E45710 CLASS QC1 CONCRETE, ABUTMENT | 9 CY | $1,050 | $1,400 | $800 | $1,000 | $1,400 |
| 512E10051 SEALING OF CONCRETE SURFACES (NON-EPOXY), AS PER P | 752 SY | $8.50 | $8.50 | $8.50 | $13.00 | $8.52 |
| 516E10000 PREFORMED ELASTOMERIC COMPRESSION JOINT SEAL | 60 FT | $37.90 | $23.00 | $25.00 | $47.00 | $40.00 |
| 516E12300 STRIP SEAL EXPANSION JOINT ANCHORED WITH ELASTOMER | 70 FT | $350 | $307 | $295 | $250 | $350 |
| 518E62200 STRUCTURE DRAINAGE, MISC.: DRAIN CLEANING | 22 EACH | $350 | $78.00 | $55.00 | $80.00 | $30.00 |
| 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN | 82 SF | $150 | $130 | $160 | $85.00 | $145 |
| 848E30200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY (VARIABLE | 45 CY | $190 | $145 | $190 | $240 | $200 |
| 848E50000 HAND CHIPPING | 52 SY | $70.00 | $80.00 | $85.00 | $125 | $65.00 |
| 848E50100 TEST SLAB | 1 LS | $800 | $1,150 | $600 | $650 | $1,000 |
| 848E50200 FULL-DEPTH REPAIR | 1 CY | $1,200 | $446 | $1,100 | $1,400 | $1,500 |
| 848E50320 EXISTING CONCRETE OVERLAY REMOVED 1 1/2" THICK | 934 SY | $9.50 | $13.50 | $11.00 | $16.00 | $12.00 |
| 848E50340 REMOVAL OF DEBONDED OR DETERIORATED EXISTING VARIA | 180 SY | $27.00 | $38.00 | $10.00 | $80.00 | $10.00 |
| 202E22900 APPROACH SLAB REMOVED | 134 SY | $50.00 | $24.00 | $40.00 | $70.00 | $50.00 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $12,000 | $16,000 | $5,500 | $15,000 | $25,000 |
| 503E21100 UNCLASSIFIED EXCAVATION | 51 CY | $250 | $442 | $100 | $30.00 | $250 |
| 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT | 178 EACH | $12.00 | $31.00 | $22.00 | $25.00 | $20.00 |
| 511E33500 SEMI-INTEGRAL DIAPHRAGM GUIDE | 2 EACH | $2,300 | $2,600 | $2,500 | $2,900 | $5,000 |
| 511E44110 CLASS QC1 CONCRETE, ABUTMENT NOT INCLUDING FOOTING | 64 CY | $800 | $1,350 | $640 | $575 | $750 |
| 512E10050 SEALING OF CONCRETE SURFACES (NON-EPOXY) | 408 SY | $8.50 | $8.50 | $8.50 | $13.00 | $8.52 |
| 512E10300 SEALING CONCRETE BRIDGE DECKS WITH HMWM RESIN | 72 SY | $25.00 | $25.50 | $39.47 | $25.00 | $30.00 |
| 513E20000 WELDED STUD SHEAR CONNECTORS | 2,944 EACH | $3.25 | $3.20 | $3.30 | $3.15 | $3.40 |
| 516E10010 ARMORLESS PREFORMED JOINT SEAL | 89 FT | $50.00 | $86.00 | $25.00 | $47.00 | $65.00 |
| 516E13900 2" PREFORMED EXPANSION JOINT FILLER | 51 SF | $13.00 | $10.00 | $16.00 | $10.00 | $12.00 |
| 516E14020 SEMI-INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 123 FT | $37.00 | $29.00 | $25.00 | $45.00 | $35.00 |
| 516E44001 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 12 EACH | $1,345 | $966 | $1,500 | $1,375 | $1,500 |
| 516E47001 JACKING AND TEMPORARY SUPPORT OF SUPERSTRUCTURE, A | 1 LS | $14,200 | $5,300 | $18,000 | $16,500 | $22,500 |
| 518E12200 SCUPPERS, INCLUDING SUPPORTS | 4 EACH | $1,400 | $1,450 | $1,500 | $1,750 | $1,500 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 61 CY | $90.00 | $89.00 | $100 | $75.00 | $120 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 121 FT | $8.00 | $7.00 | $13.00 | $17.00 | $12.00 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 56 FT | $17.00 | $8.00 | $17.00 | $17.00 | $15.00 |
| 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN | 11 SF | $175 | $130 | $130 | $125 | $145 |
| 526E15000 REINFORCED CONCRETE APPROACH SLABS (T=13") | 179 SY | $270 | $277 | $260 | $300 | $275 |
| 526E90030 TYPE C INSTALLATION | 89 FT | $250 | $271 | $220 | $290 | $275 |
| 601E20000 CRUSHED AGGREGATE SLOPE PROTECTION | 94 SY | $30.00 | $55.00 | $50.00 | $60.00 | $30.00 |
| 202E22900 APPROACH SLAB REMOVED | 134 SY | $50.00 | $24.00 | $40.00 | $70.00 | $50.00 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $12,000 | $15,000 | $6,000 | $15,000 | $25,000 |
| 503E21100 UNCLASSIFIED EXCAVATION | 51 CY | $250 | $442 | $100 | $30.00 | $250 |
| 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT | 178 EACH | $12.00 | $31.00 | $22.00 | $25.00 | $20.00 |
| 511E33500 SEMI-INTEGRAL DIAPHRAGM GUIDE | 2 EACH | $2,300 | $2,600 | $2,500 | $1,500 | $5,000 |
| 511E44110 CLASS QC1 CONCRETE, ABUTMENT NOT INCLUDING FOOTING | 64 CY | $800 | $1,350 | $640 | $575 | $750 |
| 512E10050 SEALING OF CONCRETE SURFACES (NON-EPOXY) | 408 SY | $8.50 | $8.50 | $8.50 | $13.00 | $8.52 |
| 512E10300 SEALING CONCRETE BRIDGE DECKS WITH HMWM RESIN | 72 SY | $25.00 | $25.25 | $39.47 | $25.00 | $30.00 |
| 513E20000 WELDED STUD SHEAR CONNECTORS | 2,944 EACH | $3.25 | $3.20 | $3.30 | $3.15 | $3.40 |
| 516E10000 PREFORMED ELASTOMERIC COMPRESSION JOINT SEAL | 89 FT | $18.00 | $86.00 | $25.00 | $50.00 | $65.00 |
| 516E13900 2" PREFORMED EXPANSION JOINT FILLER | 51 SF | $12.00 | $10.00 | $16.00 | $10.00 | $12.00 |
| 516E14020 SEMI-INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 123 FT | $37.00 | $29.00 | $25.00 | $45.00 | $35.00 |
| 516E44001 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 12 EACH | $1,345 | $990 | $1,500 | $1,375 | $1,500 |
| 516E47001 JACKING AND TEMPORARY SUPPORT OF SUPERSTRUCTURE, A | 1 LS | $14,200 | $5,300 | $18,500 | $16,500 | $22,500 |
| 518E12200 SCUPPERS, INCLUDING SUPPORTS | 4 EACH | $1,400 | $1,450 | $1,500 | $1,775 | $1,500 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 61 CY | $90.00 | $89.00 | $100 | $75.00 | $120 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 121 FT | $8.00 | $7.00 | $13.00 | $16.00 | $12.00 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 56 FT | $17.00 | $8.00 | $17.00 | $16.00 | $15.00 |
| 526E15000 REINFORCED CONCRETE APPROACH SLABS (T=13") | 179 SY | $270 | $278 | $260 | $300 | $275 |
| 526E90030 TYPE C INSTALLATION | 89 FT | $250 | $272 | $220 | $290 | $275 |
| 601E20000 CRUSHED AGGREGATE SLOPE PROTECTION | 94 SY | $30.00 | $54.00 | $50.00 | $60.00 | $30.00 |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $18,000 | $4,000 | $300 | $4,000 | $30,000 |
| 512E10050 SEALING OF CONCRETE SURFACES (NON-EPOXY) | 790 SY | $8.50 | $8.50 | $8.50 | $13.00 | $8.52 |
| 516E01301 ELASTOMERIC STRIP SEAL WITHOUT STEEL EXTRUSIONS, A | 73 FT | $105 | $66.00 | $135 | $285 | $70.00 |
| 516E10000 PREFORMED ELASTOMERIC COMPRESSION JOINT SEAL | 65 FT | $35.00 | $23.00 | $25.00 | $75.00 | $40.00 |
| 518E12500 SCUPPER, MISC.: PLUG AND FILL EXISTING SCUPPER | 12 EACH | $350 | $90.00 | $200 | $200 | $500 |
| 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN | 91 SF | $150 | $130 | $190 | $85.00 | $145 |
| 607E39900 VANDAL PROTECTION FENCE, 6' STRAIGHT, COATED FABRI | 451 FT | $84.40 | $86.00 | $106 | $84.40 | $84.59 |
| 848E30200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY (VARIABLE | 30 CY | $190 | $145 | $200 | $240 | $210 |
| 848E50000 HAND CHIPPING | 38 SY | $65.00 | $80.00 | $85.00 | $125 | $40.00 |
| 848E50100 TEST SLAB | 1 LS | $800 | $1,200 | $600 | $675 | $1,000 |
| 848E50200 FULL-DEPTH REPAIR | 1 CY | $1,200 | $446 | $1,100 | $1,400 | $1,750 |
| 848E50300 WEARING COURSE REMOVED, ASPHALT | 999 SY | $8.00 | $11.00 | $10.00 | $16.00 | $10.00 |
| 848E50320 EXISTING CONCRETE OVERLAY REMOVED, 1 1/4" THICK | 821 SY | $9.50 | $13.00 | $11.00 | $19.00 | $10.00 |
| 848E50340 REMOVAL OF DEBONDED OR DETERIORATED EXISTING VARIA | 130 SY | $30.00 | $53.00 | $10.00 | $75.00 | $10.00 |
| 100E00300 PREMIUM ON RAILROADS' PROTECTIVE PUBLIC LIABILITY | 1 LS | $10,000 | $14,000 | $13,000 | $10,000 | $30,000 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $26,000 | $22,000 | $25,000 | $24,000 | $70,000 |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $45,000 | $82,000 | $135,000 | $142,000 | $138,000 |
| 619E16010 FIELD OFFICE, TYPE B | 12 MNTH | $2,200 | $3,000 | $1,800 | $1,500 | $1,200 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $5,000 | $22,000 | $25,000 | $5,500 | $15,000 |
| 108E10000 CPM PROGRESS SCHEDULE | 1 LS | $3,500 | $2,000 | $4,500 | $4,500 | $5,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 511E21522 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE | 284 CY | $850 | $241k | 6% |
| 511E21522 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE | 284 CY | $850 | $241k | 6% |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 11,628 FT | $16.6 | $193k | 5% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22, 9.0" DEPTH | 521 CY | $255 | $133k | 3% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $130,000 | $130k | 3% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $130,000 | $130k | 3% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $120,000 | $120k | 3% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $120,000 | $120k | 3% |
| 622E41000 PORTABLE BARRIER, 32" | 8,328 FT | $14 | $117k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $100k | 3% |