SHE-/AUG-IR 75/US 33 VAR
SHE County · est $5.3M
Bid dateThursday, February 13—
SHE County · est $5.3M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 7.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 42 more items below.
| Item | Quantity | R1Barrett Paving Materials INC | R2Shelly Company | % of bid |
|---|---|---|---|---|
| 442E10301 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 19,224 CY | $163 | $195 | 61% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1 3/4" Depth | 395,030 SY | $1.10 | $1.25 | 8% |
| 253E01001 PAVEMENT REPAIR, AS PER PLAN (A) | 7,000 SY | $46.50 | $56.00 | 6% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $250,000 | $430,000 | 5% |
| 253E01001 PAVEMENT REPAIR, AS PER PLAN (B) | 5,000 SY | $46.50 | $42.50 | 5% |
| 617E10100 COMPACTED AGGREGATE | 2,293 CY | $70.00 | $65.00 | 3% |
| 442E00100 ANTI-SEGREGATION EQUIPMENT | 12,905 CY | $9.00 | $9.00 | 2% |
| 644E00104 EDGE LINE, 6" |
| Item | Quantity | R1Barrett Paving Materials INC | R2Shelly Company |
|---|---|---|---|
| 202E23010 PAVEMENT REMOVED, ASPHALT | 63 SY | $60.00 | $65.00 |
| 202E23500 WEARING COURSE REMOVED | 206 SY | $40.00 | $60.00 |
| 203E10000 EXCAVATION | 113 CY | $60.00 | $60.00 |
| 602E20000 CONCRETE MASONRY | 0.5 CY | $500 | $1,500 |
| 605E13300 6" UNCLASSIFIED PIPE UNDERDRAINS | 30 FT | $15.00 | $100 |
| 611E99920 DRAINAGE STRUCTURE, MISC.: UNDERDRAIN INSPECTION | 1 LS | $4,000 | $4,000 |
| 613E41200 LOW STRENGTH MORTAR BACKFILL |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 34.52 MILE |
| $2,780 |
| $2,780 |
| 2% |
| 407E20000 NON-TRACKING TACK COAT | 33,626 GAL | $2.50 | $2.15 | 2% |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 69.06 MILE | $910 | $910 | 1% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 600 HOUR | $68.00 | $60.00 | 1% |
| 519E12300 PATCHING CONCRETE BRIDGE DECK - TYPE B | 50 SY | $650 | $650 | 1% |
| 519E12300 PATCHING CONCRETE BRIDGE DECK - TYPE B | 50 SY | $650 | $650 | 1% |
| 624E10000 MOBILIZATION | 1 LS | $31,500 | $200,000 | 1% |
| 618E40600 RUMBLE STRIPS, SHOULDER (ASPHALT CONCRETE) | 29.4 MILE | $900 | $900 | 1% |
| 621E00100 RPM | 1,071 EACH | $23.40 | $23.40 | 0% |
| 614E20560 WORK ZONE LANE LINE, CLASS III, 6", 642 PAINT | 30.48 MILE | $730 | $730 | 0% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $14,210 | $20,000 | 0% |
| 808E18700 DIGITAL SPEED LIMIT (DSL) SIGN ASSEMBLY | 16 SNMT | $850 | $850 | 0% |
| 644E00204 LANE LINE, 6" | 15.24 MILE | $865 | $865 | 0% |
| 48 CY |
| $130 |
| $150 |
| 254E01601 PATCHING PLANED SURFACE, AS PER PLAN | 1,000 SY | $3.00 | $15.00 |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 32 CY | $200 | $300 |
| 301E46001 ASPHALT CONCRETE BASE, PG64-22, AS PER PLAN | 15 CY | $550 | $300 |
| 304E20000 AGGREGATE BASE | 29 CY | $120 | $150 |
| 442E10100 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE | 18 CY | $550 | $1,100 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 993 EACH | $5.00 | $10.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 165 FT | $15.00 | $10.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 10 EACH | $100 | $65.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 10 EACH | $25.00 | $95.00 |
| 644E00300 CENTER LINE | 0.3 MILE | $3,490 | $3,490 |
| 644E00400 CHANNELIZING LINE, 8" | 232 FT | $1.15 | $1.15 |
| 644E00404 CHANNELIZING LINE, 12" | 6,355 FT | $1.50 | $1.50 |
| 644E00500 STOP LINE | 180 FT | $7.05 | $7.05 |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 161 FT | $6.90 | $6.90 |
| 644E00900 ISLAND MARKING | 137 SF | $4.90 | $4.90 |
| 644E01000 RAILROAD SYMBOL MARKING | 1 EACH | $500 | $500 |
| 644E01300 LANE ARROW | 3 EACH | $150 | $150 |
| 644E01350 LANE REDUCTION ARROW | 2 EACH | $250 | $250 |
| 644E01360 WRONG WAY ARROW | 8 EACH | $200 | $200 |
| 644E01510 DOTTED LINE, 6" | 10,234 FT | $1.10 | $1.10 |
| 644E40000 SPECIAL - AIR SPEED ZONE MARKING | 2 EACH | $500 | $1,449 |
| 646E10010 EDGE LINE, 6" | 0.1 MILE | $57,875 | $57,875 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 20 CY | $300 | $350 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 6 SNMT | $950 | $950 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 0.6 MILE | $1,005 | $1,005 |
| 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 8", 642 PA | 464 FT | $0.55 | $0.55 |
| 614E23690 WORK ZONE CHANNELIZING LINE, CLASS III, 12", 642 P | 12,710 FT | $0.75 | $0.75 |
| 614E24612 WORK ZONE DOTTED LINE, CLASS III, 6", 642 PAINT | 20,468 FT | $0.50 | $0.50 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 360 FT | $2.50 | $2.50 |
| 512E33010 TYPE 3 WATERPROOFING | 6 SY | $225 | $225 |
| 516E31001 JOINT SEALER, AS PER PLAN | 93 FT | $25.50 | $25.50 |
| 512E33010 TYPE 3 WATERPROOFING | 6 SY | $225 | $225 |
| 516E31001 JOINT SEALER, AS PER PLAN | 93 FT | $25.50 | $25.50 |
| 516E31001 JOINT SEALER, AS PER PLAN | 140 FT | $25.50 | $25.50 |
| 516E31001 JOINT SEALER, AS PER PLAN | 140 FT | $25.50 | $25.50 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 442E10301 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 19,224 CY | $163 | $3.13M | 59% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1 3/4" Depth | 395,030 SY | $1.1 | $435k | 8% |
| 253E01001 PAVEMENT REPAIR, AS PER PLAN (A) | 7,000 SY | $46.5 | $326k | 6% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $250,000 | $250k | 5% |
| 253E01001 PAVEMENT REPAIR, AS PER PLAN (B) | 5,000 SY | $46.5 | $233k | 4% |
| 617E10100 COMPACTED AGGREGATE | 2,293 CY | $70 | $161k | 3% |
| 442E00100 ANTI-SEGREGATION EQUIPMENT | 12,905 CY | $9 | $116k | 2% |
| 644E00104 EDGE LINE, 6" | 34.52 MILE | $2,780 | $96k | 2% |
| 407E20000 NON-TRACKING TACK COAT | 33,626 GAL | $2.5 | $84k | 2% |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 69.06 MILE | $910 | $63k | 1% |