CLE-US 50-00.00
CLE County · est $0.7M
Bid dateThursday, February 27—
CLE County · est $0.7M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 7.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 20 more items below.
| Item | Quantity | R1John R Jurgensen Company | R2Barrett Paving Materials INC | % of bid |
|---|---|---|---|---|
| 442E20000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 1,882 CY | $184 | $195 | 36% |
| AA2 644E50200 PAVEMENT MARKING, MISC.: DECORATIVE CROSSWALK (ALT | 11,886 SF | $15.10 | $16.00 | 19% |
| 253E02000 PAVEMENT REPAIR (A) | 158 CY | $731 | $525 | 12% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $86,870 | $102,000 | 9% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 2" | 33,844 SY | $2.15 | $2.95 | 8% |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 85 EACH | $400 | $400 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $20,000 | 2% |
| 253E02000 PAVEMENT REPAIR (B) |
| Item | Quantity | R1John R Jurgensen Company | R2Barrett Paving Materials INC |
|---|---|---|---|
| 254E01011 PAVEMENT PLANING, PORTLAND CEMENT CONCRETE, AS PER | 54 SY | $25.35 | $3.45 |
| 644E00100 EDGE LINE, 4" | 0.16 MILE | $2,765 | $2,765 |
| 644E00200 LANE LINE, 4" | 1.29 MILE | $1,485 | $1,485 |
| 644E00400 CHANNELIZING LINE, 8" | 1,752 FT | $1.15 | $1.15 |
| 644E00500 STOP LINE | 365 FT | $4.65 | $4.65 |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 267 FT | $4.50 | $4.50 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 19 CY |
| $858 |
| $450 |
| 2% |
| 638E10800 VALVE BOX ADJUSTED TO GRADE | 51 EACH | $303 | $400 | 2% |
| 632E26500 DETECTOR LOOP | 11 EACH | $1,250 | $1,250 | 1% |
| 611E99645 MANHOLE COVER, AS PER PLAN | 27 EACH | $336 | $200 | 1% |
| 407E20000 NON-TRACKING TACK COAT | 2,544 GAL | $3.50 | $3.00 | 1% |
| AA1 644E00700 TRANSVERSE/DIAGONAL LINE (ALTERNATE 1) | 1,593 FT | $4.35 | $4.35 | 1% |
| AA1 644E00600 CROSSWALK LINE (ALTERNATE 1) | 2,626 FT | $2.50 | $2.50 | 1% |
| 644E00300 CENTER LINE | 1.05 MILE | $4,325 | $4,325 | 0% |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 235 EACH | $19.17 | $10.00 | 0% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $4,418 | $5,000 | 0% |
| 254E01600 PATCHING PLANED SURFACE | 1,695 SY | $2.59 | $3.00 | 0% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $2,724 | $8,505 | 0% |
| 614E20000 WORK ZONE LANE LINE, CLASS I, 4" | 1.29 MILE | $2,075 | $2,075 | 0% |
| 644E00900 ISLAND MARKING |
| 25 SF |
| $2.50 |
| $2.50 |
| 644E01200 PARKING LOT STALL MARKING | 1,468 FT | $1.40 | $1.40 |
| 644E01300 LANE ARROW | 32 EACH | $75.00 | $75.00 |
| 644E01500 DOTTED LINE, 4" | 241 FT | $1.10 | $1.10 |
| 644E30000 REMOVAL OF PAVEMENT MARKING | 149 FT | $9.50 | $9.50 |
| 632E27200 LOOP DETECTOR TIE IN | 1 EACH | $250 | $250 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 32 HOUR | $65.00 | $65.00 |
| 614E20550 WORK ZONE LANE LINE, CLASS III, 4", 642 PAINT | 1.29 MILE | $1,920 | $1,920 |
| 614E21000 WORK ZONE CENTER LINE, CLASS I | 1.05 MILE | $2,410 | $2,410 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 1.05 MILE | $2,100 | $2,100 |
| 614E23000 WORK ZONE CHANNELIZING LINE, CLASS I, 8" | 1,752 FT | $0.55 | $0.55 |
| 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 8", 642 PA | 1,752 FT | $0.50 | $0.50 |
| 614E26000 WORK ZONE STOP LINE, CLASS I | 365 FT | $2.50 | $2.50 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 365 FT | $2.40 | $2.40 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 442E20000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 1,882 CY | $184.42 | $347k | 35% |
| AA2 644E50200 PAVEMENT MARKING, MISC.: DECORATIVE CROSSWALK (ALT | 11,886 SF | $15.1 | $179k | 18% |
| 253E02000 PAVEMENT REPAIR (A) | 158 CY | $731.42 | $116k | 12% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $86,870 | $87k | 9% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 2" | 33,844 SY | $2.15 | $73k | 7% |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 85 EACH | $400.24 | $34k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $20k | 2% |
| 253E02000 PAVEMENT REPAIR (B) | 19 CY | $857.98 | $16k | 2% |
| 638E10800 VALVE BOX ADJUSTED TO GRADE | 51 EACH | $303.4 | $15k | 2% |
| 632E26500 DETECTOR LOOP | 11 EACH | $1,250 | $14k | 1% |