MEG-SR 7-02.43
MEG County · est $1.3M
Bid dateThursday, March 12—
MEG County · est $1.3M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 9.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 61 more items below.
| Item | Quantity | R1Bridge Specialists INC | R2Double Z Construction Company | R3Complete General Construction Company | R4Triton Construction INC | R5Shelly & Sands INC | % of bid |
|---|---|---|---|---|---|---|---|
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $96,000 | $70,000 | $30,000 | $169,942 | $28,000 | 9% |
| 624E10000 MOBILIZATION | 1 LS | $96,000 | $40,000 | $40,000 | $40,000 | $40,000 | 9% |
| 848E10100 LATEX MODIFIED CONCRETE OVERLAY USING HYDRODEMOLIT | 1,222 SY | $70.25 | $105 | $80.00 | $15.00 | $99.00 | 8% |
| Item | Quantity | R1Bridge Specialists INC | R2Double Z Construction Company | R3Complete General Construction Company | R4Triton Construction INC | R5Shelly & Sands INC |
|---|---|---|---|---|---|---|
| 202E38000 GUARDRAIL REMOVED | 748 FT | $1.73 | $1.73 | $1.73 | $2.50 | $1.73 |
| 606E15050 GUARDRAIL, TYPE MGS | 562.5 FT | $17.20 | $17.20 | $17.20 | $17.50 | $17.20 |
| 606E25550 ANCHOR ASSEMBLY, MGS TYPE A | 1 EACH | $1,180 | $1,180 | $1,180 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION | 1,222 SY | $68.00 | $68.00 | $85.00 | $65.00 | $75.00 | 8% |
| 848E10100 LATEX MODIFIED CONCRETE OVERLAY USING HYDRODEMOLIT | 1,118 SY | $70.85 | $105 | $80.00 | $15.00 | $105 | 8% |
| 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION | 1,118 SY | $68.00 | $68.00 | $90.00 | $65.00 | $78.00 | 7% |
| 848E10100 LATEX MODIFIED CONCRETE OVERLAY USING HYDRODEMOLIT | 640 SY | $94.00 | $120 | $100 | $20.00 | $136 | 6% |
| 622E41020 PORTABLE BARRIER, 32", BRIDGE MOUNTED | 1,900 FT | $27.00 | $20.00 | $19.00 | $18.00 | $18.00 | 5% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 220 CY | $225 | $210 | $210 | $210 | $210 | 5% |
| 517E72750 RAILING (THRIE BEAM RETROFIT) | 734.33 FT | $66.00 | $71.00 | $64.00 | $110 | $70.00 | 5% |
| 517E72750 RAILING (THRIE BEAM RETROFIT) | 671 FT | $67.50 | $71.00 | $65.50 | $110 | $70.00 | 4% |
| 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION | 597 SY | $68.00 | $68.00 | $105 | $65.00 | $90.00 | 4% |
| 517E70000 RAILING (TWIN STEEL TUBE) | 227.83 FT | $151 | $156 | $148 | $200 | $150 | 3% |
| 848E30100 LATEX MODIFIED CONCRETE OVERLAY (VARIABLE THICKNES | 36 CY | $877 | $700 | $600 | $305 | $778 | 3% |
| 614E12338 WORK ZONE IMPACT ATTENUATOR (BIDIRECTIONAL) | 12 EACH | $2,500 | $2,250 | $2,500 | $1,950 | $1,800 | 3% |
| 848E30100 LATEX MODIFIED CONCRETE OVERLAY (VARIABLE THICKNES | 33 CY | $877 | $700 | $600 | $305 | $778 | 3% |
| 848E50320 EXISTING CONCRETE OVERLAY REMOVED (1 1/4" NOMINAL | 1,218 SY | $21.00 | $15.00 | $14.00 | $15.00 | $13.00 | 2% |
| 516E11900 HORIZONTAL EXTENSION OF STRUCTURAL EXPANSION JOINT | 9 FT | $2,801 | $2,325 | $1,600 | $600 | $2,175 | 2% |
| 516E11900 HORIZONTAL EXTENSION OF STRUCTURAL EXPANSION JOINT | 9 FT | $2,801 | $2,325 | $1,600 | $600 | $2,200 | 2% |
| 848E50320 EXISTING CONCRETE OVERLAY REMOVED (1 1/4" NOMINAL | 1,113 SY | $21.00 | $15.00 | $14.00 | $15.00 | $17.00 | 2% |
| $1,500 |
| $1,180 |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 2 EACH | $2,070 | $2,070 | $2,070 | $1,950 | $2,070 |
| 606E35120 BRIDGE TERMINAL ASSEMBLY, TYPE 3 | 8 EACH | $2,325 | $2,325 | $2,325 | $2,000 | $2,325 |
| 659E10001 SEEDING AND MULCHING, AS PER PLAN | 1,500 SY | $3.55 | $2.20 | $2.75 | $2.20 | $2.75 |
| 832E30000 EROSION CONTROL | 9,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (1 1/2" AVERAGE | 5,259 SY | $3.85 | $4.40 | $2.85 | $8.00 | $2.90 |
| 407E10000 TACK COAT | 474 GAL | $1.85 | $1.85 | $1.85 | $1.85 | $1.90 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 40 EACH | $20.00 | $20.00 | $17.00 | $13.68 | $9.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (BIDIRECTIONAL) | 30 EACH | $7.65 | $17.00 | $8.00 | $8.50 | $8.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 2 EACH | $65.00 | $65.00 | $65.00 | $55.00 | $65.00 |
| 630E86010 REMOVAL OF GROUND MOUNTED POST SUPPORT AND REERECT | 2 EACH | $135 | $135 | $135 | $160 | $135 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.97 MILE | $2,598 | $2,598 | $2,598 | $2,598 | $2,600 |
| 642E00300 CENTER LINE, TYPE 1 | 0.49 MILE | $4,750 | $4,750 | $4,750 | $4,750 | $4,800 |
| 614E12740 WORK ZONE LIGHTING SYSTEM | 3 EACH | $6,500 | $15,000 | $1,000 | $30,000 | $27,000 |
| 614E13310 BARRIER REFLECTOR, TYPE 1 (BIDIRECTIONAL) | 120 EACH | $22.00 | $22.00 | $22.00 | $8.00 | $7.00 |
| 614E13360 OBJECT MARKER, TWO WAY | 120 EACH | $25.00 | $25.00 | $25.00 | $13.00 | $14.00 |
| 614E22000 WORK ZONE EDGE LINE, CLASS I, 4" | 1.56 MILE | $3,995 | $3,995 | $3,995 | $6,075 | $4,000 |
| 614E26000 WORK ZONE STOP LINE, CLASS I | 70 FT | $14.00 | $14.00 | $14.00 | $14.50 | $14.00 |
| 615E10000 ROADS FOR MAINTAINING TRAFFIC | 1 LS | $5,000 | $12,000 | $10,000 | $30,000 | $3,500 |
| 615E25000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS B | 103 SY | $150 | $100 | $72.00 | $150 | $80.00 |
| 622E41000 PORTABLE BARRIER, 32" | 880 FT | $25.00 | $20.00 | $17.00 | $17.00 | $19.50 |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $13,750 | $17,000 | $40,000 | $60,000 | $16,000 |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $1,350 | $800 | $1,500 | $10,000 | $1,500 |
| 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR | 50 LB | $2.00 | $3.00 | $8.00 | $5.00 | $0.90 |
| 511E34410 CLASS QC2 CONCRETE, SUPERSTRUCTURE | 1 CY | $945 | $2,200 | $4,200 | $7,000 | $2,400 |
| 511E45710 CLASS QC1 CONCRETE, ABUTMENT | 3 CY | $945 | $1,000 | $2,000 | $2,000 | $3,100 |
| 519E11100 PATCHING CONCRETE STRUCTURE | 134 SF | $67.50 | $120 | $120 | $130 | $125 |
| 848E50000 HAND CHIPPING | 168 SY | $67.50 | $45.00 | $60.00 | $35.00 | $30.00 |
| 848E50100 TEST SLAB | 1 LS | $500 | $1,200 | $2,000 | $1,800 | $2,800 |
| 848E50200 FULL-DEPTH REPAIR | 16 CY | $500 | $200 | $1,100 | $305 | $1,300 |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $13,750 | $21,000 | $50,000 | $60,000 | $16,000 |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $1,350 | $800 | $1,500 | $10,000 | $1,500 |
| 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR | 50 LB | $2.00 | $3.00 | $8.00 | $5.00 | $0.90 |
| 511E34410 CLASS QC2 CONCRETE, SUPERSTRUCTURE | 1 CY | $945 | $2,200 | $4,200 | $7,000 | $2,500 |
| 511E45710 CLASS QC1 CONCRETE, ABUTMENT | 3 CY | $945 | $900 | $2,000 | $2,000 | $3,200 |
| 519E11100 PATCHING CONCRETE STRUCTURE | 12 SF | $75.00 | $172 | $175 | $150 | $175 |
| 848E50000 HAND CHIPPING | 184 SY | $67.50 | $45.00 | $60.00 | $35.00 | $30.00 |
| 848E50100 TEST SLAB | 1 LS | $500 | $1,200 | $2,000 | $1,800 | $2,600 |
| 848E50200 FULL-DEPTH REPAIR | 14 CY | $500 | $200 | $1,100 | $305 | $1,100 |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $18,378 | $54,000 | $80,000 | $120,000 | $87,000 |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $5,400 | $2,000 | $2,000 | $10,000 | $1,500 |
| 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR | 50 LB | $2.00 | $3.00 | $8.00 | $5.00 | $0.90 |
| 509E25000 UNCOATED REINFORCING STEEL | 3,443 LB | $2.00 | $4.45 | $4.00 | $2.00 | $4.40 |
| 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT | 68 EACH | $20.00 | $23.01 | $19.00 | $30.00 | $46.00 |
| 511E34410 CLASS QC2 CONCRETE, SUPERSTRUCTURE | 19 CY | $1,129 | $1,500 | $2,200 | $1,300 | $2,200 |
| 511E45710 CLASS QC1 CONCRETE, ABUTMENT | 9 CY | $1,080 | $600 | $1,600 | $1,400 | $2,566 |
| 512E10050 SEALING OF CONCRETE SURFACES (NON-EPOXY) | 153 SY | $16.00 | $12.00 | $12.00 | $35.00 | $12.00 |
| 512E44400 TYPE B WATERPROOFING | 10 SY | $27.00 | $60.00 | $80.00 | $40.00 | $106 |
| 516E11900 HORIZONTAL EXTENSION OF STRUCTURAL EXPANSION JOINT | 7 FT | $2,733 | $2,600 | $1,800 | $510 | $2,300 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 9 CY | $67.50 | $150 | $150 | $205 | $170 |
| 518E22300 SPECIAL - STEEL DRIP STRIP | 279.21 FT | $16.00 | $13.00 | $13.00 | $40.00 | $14.00 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 34 FT | $27.00 | $21.00 | $14.00 | $3.00 | $13.00 |
| 848E30100 LATEX MODIFIED CONCRETE OVERLAY (VARIABLE THICKNES | 18 CY | $877 | $700 | $600 | $305 | $778 |
| 848E50000 HAND CHIPPING | 90 SY | $67.50 | $50.00 | $62.00 | $35.00 | $30.00 |
| 848E50100 TEST SLAB | 1 LS | $500 | $1,200 | $2,000 | $1,800 | $2,600 |
| 848E50200 FULL-DEPTH REPAIR | 5 CY | $500 | $225 | $1,100 | $305 | $1,300 |
| 848E50320 EXISTING CONCRETE OVERLAY REMOVED (1 3/4" NOMINAL | 597 SY | $21.00 | $15.00 | $14.00 | $15.00 | $24.00 |
| 100E00300 PREMIUM ON RAILROADS' PROTECTIVE PUBLIC LIABILITY | 1 LS | $12,500 | $2,500 | $5,000 | $5,000 | $5,040 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $11,836 | $8,500 | $10,000 | $7,500 | $8,800 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $96,000 | $96k | 7% |
| 624E10000 MOBILIZATION | 1 LS | $96,000 | $96k | 7% |
| 848E10100 LATEX MODIFIED CONCRETE OVERLAY USING HYDRODEMOLIT | 1,222 SY | $70.25 | $86k | 6% |
| 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION | 1,222 SY | $68 | $83k | 6% |
| 848E10100 LATEX MODIFIED CONCRETE OVERLAY USING HYDRODEMOLIT | 1,118 SY | $70.85 | $79k | 6% |
| 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION | 1,118 SY | $68 | $76k | 5% |
| 848E10100 LATEX MODIFIED CONCRETE OVERLAY USING HYDRODEMOLIT | 640 SY | $94 | $60k | 4% |
| 622E41020 PORTABLE BARRIER, 32", BRIDGE MOUNTED | 1,900 FT | $27 | $51k | 4% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 220 CY | $225 | $50k | 3% |
| 517E72750 RAILING (THRIE BEAM RETROFIT) | 734.33 FT | $66 | $48k | 3% |