| Item | Quantity | R1Skeens Excavating INC | R2D G M INC | R3Allard Excavation LLC | R4Distel Construction INC | R5Amaazz Construction Ohio LLC | % of bid |
|---|---|---|---|---|---|---|---|
| 203E10000 EXCAVATION | 2,990 CY | $10.00 | $16.00 | $16.38 | $35.00 | $17.00 | 34% |
| 611E05900 15" CONDUIT, TYPE B | 91 FT | $80.00 | $100 | $109 | $72.35 | $56.50 | 8% |
| 304E20000 AGGREGATE BASE | 88 CY | $50.00 | $90.00 | $75.75 | $50.00 | $133 | 5% |
| 614E11000 MAINTAINING TRAFFIC |
| Item | Quantity | R1Skeens Excavating INC | R2D G M INC | R3Allard Excavation LLC | R4Distel Construction INC | R5Amaazz Construction Ohio LLC |
|---|---|---|---|---|---|---|
| 202E23000 PAVEMENT REMOVED | 23 SY | $50.00 | $30.00 | $8.95 | $100 | $27.00 |
| 203E20000 EMBANKMENT | 8 CY | $100 | $50.00 | $18.28 | $100 | $8.40 |
| 623E40520 RIGHT-OF-WAY MONUMENT | 2 EACH | $500 | $200 | $496 | $500 | $718 |
| 659E14000 REPAIR SEEDING AND MULCHING | 92 SY | $2.00 | $0.05 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 1 LS |
| $3,500 |
| $31,600 |
| $12,040 |
| $3,400 |
| $9,278 |
| 4% |
| 659E10000 SEEDING AND MULCHING | 1,675 SY | $2.00 | $3.00 | $3.27 | $3.00 | $3.70 | 4% |
| 832E30000 EROSION CONTROL | 3,200 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 4% |
| 615E25000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS B | 34 SY | $90.00 | $100 | $109 | $147 | $253 | 4% |
| 644E00100 EDGE LINE, 4" | 0.13 MILE | $23,500 | $20,000 | $17,155 | $20,243 | $113,840 | 3% |
| 611E98470 CATCH BASIN, NO. 2-2B | 3 EACH | $1,000 | $1,500 | $2,500 | $1,730 | $2,439 | 3% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 6 CY | $500 | $500 | $867 | $400 | $569 | 3% |
| 202E56100 BUILDING DEMOLISHED (2-WD1) | 1 EACH | $3,000 | $5,000 | $4,625 | $11,000 | $14,822 | 3% |
| 202E56100 BUILDING DEMOLISHED (2-WD2) | 1 EACH | $3,000 | $5,000 | $4,625 | $10,000 | $14,822 | 3% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $3,000 | $3,000 | $8,000 | $3,500 | $5,692 | 3% |
| 622E41000 PORTABLE BARRIER, 32" | 230 FT | $12.00 | $24.00 | $22.60 | $27.15 | $22.80 | 3% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $2,500 | $12,000 | $8,000 | $1,500 | $30,354 | 3% |
| 611E06100 15" CONDUIT, TYPE C | 47 FT | $50.00 | $100 | $75.00 | $53.40 | $37.70 | 3% |
| 614E12338 WORK ZONE IMPACT ATTENUATOR (BIDIRECTIONAL) | 1 EACH | $2,000 | $2,200 | $2,200 | $2,242 | $2,846 | 2% |
| 630E80100 SIGN, FLAT SHEET | 3.75 SF | $500 | $40.00 | $25.00 | $30.00 | $54.60 | 2% |
| 411E10000 STABILIZED CRUSHED AGGREGATE | 32 CY | $50.00 | $90.00 | $75.75 | $55.00 | $444 | 2% |
| 623E40500 REFERENCE MONUMENT | 3 EACH | $500 | $500 | $592 | $300 | $718 | 2% |
| $0.05 |
| $6.00 |
| $5.70 |
| 659E20000 COMMERCIAL FERTILIZER | 0.3 TON | $400 | $850 | $450 | $720 | $512 |
| 659E31000 LIME | 0.2 ACRE | $400 | $80.00 | $75.00 | $88.50 | $85.40 |
| 659E35000 WATER | 5 MGAL | $110 | $1.00 | $1.00 | $35.00 | $1.10 |
| 611E04600 12" CONDUIT, TYPE C | 27 FT | $50.00 | $100 | $100 | $94.75 | $65.90 |
| 625E75511 POWER SERVICE REMOVED, AS PER PLAN | 2 EACH | $100 | $100 | $2,300 | $250 | $490 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 12 FT | $75.00 | $15.00 | $11.00 | $13.00 | $45.50 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 1 EACH | $50.00 | $15.00 | $20.00 | $50.00 | $11.40 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 1 EACH | $50.00 | $15.00 | $25.00 | $50.00 | $11.40 |
| 410E12000 TRAFFIC COMPACTED SURFACE, TYPE A OR B | 5 CY | $100 | $40.00 | $72.60 | $75.00 | $444 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 16 HOUR | $50.00 | $40.00 | $75.00 | $100 | $91.10 |
| 614E13310 BARRIER REFLECTOR, TYPE 1, BIDIRECTIONAL | 12 EACH | $10.00 | $15.00 | $15.00 | $33.00 | $31.90 |
| 614E13350 OBJECT MARKER, ONE WAY | 2 EACH | $10.00 | $15.00 | $15.00 | $148 | $142 |
| 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT | 0.02 MILE | $55,000 | $53,000 | $52,995 | $41,070 | $60,330 |
| 614E22100 WORK ZONE EDGE LINE, CLASS I, 4", 642 PAINT | 0.03 MILE | $35,000 | $33,000 | $32,850 | $41,070 | $37,396 |
| 616E10000 WATER | 5 MGAL | $110 | $1.00 | $1.00 | $50.00 | $41.40 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $1,400 | $12,000 | $3,500 | $4,406 | $1,708 |
| 619E16000 FIELD OFFICE, TYPE A | 3 MNTH | $100 | $700 | $1,200 | $2,250 | $2,457 |
| 624E10000 MOBILIZATION | 1 LS | $1,000 | $8,000 | $25,306 | $10,804 | $16,338 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 203E10000 EXCAVATION | 2,990 CY | $10 | $30k | 30% |
| 611E05900 15" CONDUIT, TYPE B | 91 FT | $80 | $7k | 7% |
| 304E20000 AGGREGATE BASE | 88 CY | $50 | $4k | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $3,500 | $4k | 3% |
| 659E10000 SEEDING AND MULCHING | 1,675 SY | $2 | $3k | 3% |
| 832E30000 EROSION CONTROL | 3,200 EACH | $1 | $3k | 3% |
| 615E25000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS B | 34 SY | $90 | $3k | 3% |
| 644E00100 EDGE LINE, 4" | 0.13 MILE | $23,500 | $3k | 3% |
| 611E98470 CATCH BASIN, NO. 2-2B | 3 EACH | $1,000 | $3k | 3% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 6 CY | $500 | $3k | 3% |