PIK-SR 32-15.77 Safety (PART 1 AND PART 2)
PIK County · est $2.7M
Bid dateThursday, April 23—
PIK County · est $2.7M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 7.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 149 more items below.
| Item | Quantity | R1Amaazz Construction Ohio LLC | R2Shelly & Sands INC | R3Shelly Company | % of bid |
|---|---|---|---|---|---|
| 424E12000 FINE GRADED POLYMER ASPHALT CONCRETE, TYPE B | 5,198 CY | $153 | $142 | $190 | 44% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 1,125 CY | $146 | $100 | $132 | 9% |
| 897E01010 PAVEMENT PLANING, ASPHALT CONCRETE, CLASS A, 0.75" | 187,128 SY | $0.70 | $0.90 | $0.86 | 7% |
| 897E02000 PATCHING PLANED SURFACE | 37,570 SY | $1.60 | $1.90 | $2.55 | 3% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 5,850 FT | $10.00 | $12.00 | $10.25 |
| Item | Quantity | R1Amaazz Construction Ohio LLC | R2Shelly & Sands INC | R3Shelly Company |
|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $2,000 | $4,000 | $5,000 |
| 202E98200 REMOVAL MISC.: LONGITUDINAL CHANNILIZER, CATEGORY | 285 FT | $3.70 | $5.25 | $5.00 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 |
| 202E23500 WEARING COURSE REMOVED | 211 SY | $5.41 | $9.00 | $3.15 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.5" | 1,633 SY | $2.85 | $1.50 | $2.80 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 3% |
| 441E10000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (446), PG | 298 CY | $193 | $140 | $175 | 3% |
| 204E30020 GRANULAR MATERIAL, TYPE C | 1,437 CY | $39.50 | $40.00 | $40.25 | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $53,000 | $55,000 | $80,000 | 3% |
| 304E20000 AGGREGATE BASE | 1,107 CY | $44.50 | $65.00 | $38.50 | 3% |
| 644E00104 EDGE LINE, 6" | 16.12 MILE | $3,040 | $3,100 | $2,960 | 3% |
| 832E30000 EROSION CONTROL | 41,429 EACH | $1.00 | $1.00 | $1.00 | 2% |
| 441E10200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 446 (184 CY | $216 | $120 | $185 | 2% |
| 617E10100 COMPACTED AGGREGATE | 518 CY | $73.00 | $65.00 | $53.00 | 2% |
| 624E10000 MOBILIZATION | 1 LS | $34,584 | $100,000 | $100,000 | 2% |
| 625E25902 CONDUIT, JACKED OR DRILLED, 725.043" | 522 FT | $66.00 | $30.00 | $40.00 | 2% |
| 808E18700 DIGITAL SPEED LIMIT (DSL) SIGN ASSEMBLY | 36 SNMT | $925 | $950 | $900 | 2% |
| 407E10000 TACK COAT | 16,106 GAL | $2.05 | $2.25 | $1.85 | 2% |
| 202E23010 PAVEMENT REMOVED, ASPHALT | 1,993 SY | $13.00 | $12.00 | $19.75 | 1% |
| 204E13000 EXCAVATION OF SUBGRADE | 1,404 CY | $17.50 | $15.00 | $17.75 | 1% |
| 611E05900 15" CONDUIT, TYPE B, 706.02 OR 707.13(0.064) OR 70 | 438 FT | $56.00 | $68.00 | $91.00 | 1% |
| 700 SY |
| $3.30 |
| $3.00 |
| $3.15 |
| 254E01010 PAVEMENT PLANING, PORTLAND CEMENT CONCRETE, 1.5" | 562 SY | $6.00 | $3.00 | $3.15 |
| 407E13900 TACK COAT, 702.13 | 48 GAL | $3.50 | $2.25 | $4.00 |
| 442E20000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 88 CY | $107 | $150 | $290 |
| 442E20000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 122 CY | $97.25 | $150 | $183 |
| 516E31001 JOINT SEALER, AS PER PLAN | 168 FT | $25.25 | $26.00 | $26.50 |
| 618E40600 RUMBLE STRIPS, SHOULDER (ASPHALT CONCRETE) | 15.94 MILE | $770 | $750 | $750 |
| 620E60500 REMOVAL OF DELINEATOR, POST SURFACE MOUNTED | 3 EACH | $12.15 | $150 | $10.00 |
| 620E70010 DELINEATOR, MISC.:LONGITUDINAL CHANNILIZER, CATEGO | 310 FT | $60.50 | $60.00 | $69.50 |
| 621E00100 RPM | 671 EACH | $24.00 | $24.00 | $23.00 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 671 EACH | $6.00 | $3.00 | $12.75 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 2 EACH | $60.00 | $60.00 | $15.00 |
| 644E00204 LANE LINE, 6" | 8.06 MILE | $1,600 | $1,650 | $1,562 |
| 644E00300 CENTER LINE | 0.05 MILE | $9,000 | $9,300 | $8,815 |
| 644E00404 CHANNELIZING LINE, 12" | 4,599 FT | $1.60 | $1.65 | $1.55 |
| 644E00500 STOP LINE | 32 FT | $6.75 | $6.50 | $6.55 |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 1,452 FT | $5.25 | $5.40 | $5.10 |
| 644E00900 ISLAND MARKING | 475 SF | $2.40 | $2.50 | $2.35 |
| 644E01300 LANE ARROW | 27 EACH | $91.00 | $90.00 | $89.00 |
| 644E01510 DOTTED LINE, 6" | 2,638 FT | $1.05 | $1.00 | $1.05 |
| 646E10010 EDGE LINE, 6" | 0.08 MILE | $33,450 | $34,000 | $32,500 |
| 646E10110 LANE LINE, 6" | 0.04 MILE | $27,500 | $28,000 | $26,810 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 40 HOUR | $75.00 | $80.00 | $75.00 |
| 614E12460 WORK ZONE MARKING SIGN | 10 EACH | $100 | $100 | $98.00 |
| 614E12484 WORK ZONE INCREASED PENALTIES SIGN | 17 EACH | $100 | $100 | $98.00 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 50 CY | $220 | $125 | $175 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 6 SNMT | $975 | $950 | $1,500 |
| 614E20560 WORK ZONE LANE LINE, CLASS III, 6", 642 PAINT | 16.2 MILE | $610 | $625 | $596 |
| 614E22200 WORK ZONE EDGE LINE, CLASS I, 4", 740.06, TYPE I | 0.57 MILE | $6,250 | $6,400 | $6,075 |
| 614E23690 WORK ZONE CHANNELIZING LINE, CLASS III, 12", 642 P | 4,559 FT | $0.75 | $0.80 | $0.75 |
| 614E24400 WORK ZONE DOTTED LINE, CLASS I, 4", 740.06, TYPE I | 2,640 FT | $1.25 | $1.30 | $1.25 |
| 616E10000 WATER | 1 MGAL | $105 | $340 | $5.00 |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $4,400 | $5,000 | $12,500 |
| 202E20010 HEADWALL REMOVED | 2 EACH | $190 | $180 | $1,710 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 71 FT | $10.50 | $7.30 | $49.00 |
| 202E58100 CATCH BASIN REMOVED | 2 EACH | $185 | $220 | $525 |
| 203E10000 EXCAVATION | 1,225 CY | $13.40 | $15.00 | $21.75 |
| 203E20000 EMBANKMENT | 811 CY | $6.00 | $14.00 | $18.50 |
| 204E10000 SUBGRADE COMPACTION | 8,702 SY | $1.00 | $3.00 | $1.80 |
| 204E45000 PROOF ROLLING | 3 HOUR | $190 | $200 | $200 |
| 204E50000 GEOTEXTILE FABRIC | 4,285 SY | $1.80 | $0.35 | $1.65 |
| 601E21050 TIED CONCRETE BLOCK MAT, TYPE 1 | 11 SY | $205 | $150 | $180 |
| 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER | 8 CY | $166 | $140 | $200 |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 5 CY | $238 | $200 | $500 |
| 659E00300 TOPSOIL | 534 CY | $18.50 | $16.00 | $27.00 |
| 659E10000 SEEDING AND MULCHING | 4,805 SY | $1.20 | $1.25 | $0.76 |
| 659E14000 REPAIR SEEDING AND MULCHING | 240 SY | $1.20 | $1.25 | $0.68 |
| 659E15000 INTER-SEEDING | 240 SY | $1.20 | $1.25 | $0.68 |
| 659E20000 COMMERCIAL FERTILIZER | 0.67 TON | $620 | $600 | $647 |
| 659E31000 LIME | 0.99 ACRE | $72.00 | $70.00 | $154 |
| 659E35000 WATER | 27 MGAL | $1.00 | $1.00 | $1.00 |
| 670E00500 SLOPE EROSION PROTECTION | 941 SY | $2.25 | $2.30 | $1.42 |
| 670E00710 DITCH EROSION PROTECTION MAT, TYPE A | 38 SY | $6.65 | $6.00 | $1.42 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $1,800 | $1,200 | $1,225 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $7,300 | $5,000 | $1,080 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $7,650 | $7,700 | $6,883 |
| 836E10020 SEEDING AND EROSION CONTROL WITH TURF REINFORCING | 228 SY | $5.10 | $5.25 | $11.42 |
| 602E20000 CONCRETE MASONRY | 2.3 CY | $1,280 | $1,600 | $2,450 |
| 605E11100 6" SHALLOW PIPE UNDERDRAINS | 768 FT | $8.75 | $14.00 | $10.75 |
| 605E13300 6" UNCLASSIFIED PIPE UNDERDRAINS | 972 FT | $11.50 | $13.00 | $12.50 |
| 605E14000 6" BASE PIPE UNDERDRAINS | 2,195 FT | $7.65 | $11.00 | $10.25 |
| 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS | 277 FT | $17.50 | $19.00 | $44.50 |
| 611E01500 6" CONDUIT, TYPE F | 10 FT | $18.50 | $31.00 | $55.50 |
| 611E05900 15" CONDUIT, TYPE B, 706.02 OR 707.33 | 95 FT | $88.00 | $115 | $82.25 |
| 611E05900 15" CONDUIT, TYPE B, 707.33 | 13 FT | $176 | $105 | $135 |
| 611E07400 18" CONDUIT, TYPE B, 706.02 OR 707.33 | 75 FT | $60.50 | $88.00 | $55.75 |
| 611E19200 42" CONDUIT, TYPE A, 706.02 | 37 FT | $244 | $250 | $372 |
| 611E98370 CATCH BASIN, NO. 6 | 1 EACH | $4,225 | $2,900 | $2,375 |
| 611E98410 CATCH BASIN, NO. 8 | 3 EACH | $4,155 | $4,400 | $2,850 |
| 611E98630 CATCH BASIN ADJUSTED TO GRADE | 1 EACH | $600 | $1,000 | $1,500 |
| 611E98720 INLET, NO. 2-8 | 2 EACH | $3,500 | $3,800 | $2,950 |
| 611E98730 INLET, NO. 2-10 | 2 EACH | $3,725 | $4,100 | $3,175 |
| 611E98740 INLET, NO. 2-12 | 1 EACH | $3,875 | $4,200 | $3,275 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 6 EACH | $270 | $360 | $345 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 3,323 FT | $6.15 | $2.00 | $8.75 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE , 1.25" | 4,827 SY | $2.05 | $5.00 | $3.55 |
| 407E10000 TACK COAT | 824 GAL | $2.05 | $2.25 | $1.85 |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (30 CY | $166 | $200 | $185 |
| 609E71000 CONCRETE MEDIAN | 1,732 SF | $9.75 | $15.00 | $8.35 |
| 618E40100 RUMBLE STRIPS, SHOULDER (ASPHALT CONCRETE) | 5,076 FT | $0.15 | $0.15 | $0.14 |
| 625E00450 CONNECTION, FUSED PULL APART | 12 EACH | $138 | $95.00 | $100 |
| 625E00480 CONNECTION, UNFUSED PERMANENT | 12 EACH | $138 | $56.00 | $120 |
| 625E10490 LIGHT POLE, CONVENTIONAL, AT18B40 | 2 EACH | $4,425 | $2,900 | $2,800 |
| 625E14100 LIGHT POLE FOUNDATION, 24" X 8' DEEP | 2 EACH | $3,100 | $1,490 | $2,000 |
| 625E23200 NO. 4 AWG 2400 VOLT DISTRIBUTION CABLE | 1,656 FT | $3.50 | $2.20 | $2.50 |
| 625E23400 NO. 10 AWG POLE AND BRACKET CABLE | 832 FT | $2.45 | $2.25 | $1.60 |
| 625E24320 1-1/2" DUCT CABLE WITH THREE NO. 4 AWG 2400 VOLT C | 1,300 FT | $8.50 | $14.00 | $7.00 |
| 625E26251 LUMINAIRE, CONVENTIONAL, AS PER PLAN, 200W HPS, TY | 6 EACH | $721 | $550 | $400 |
| 625E29000 TRENCH | 1,253 FT | $8.25 | $8.40 | $8.00 |
| 625E30700 PULL BOX, 725.08, 18" | 2 EACH | $1,650 | $780 | $1,100 |
| 625E31510 PULL BOX REMOVED | 3 EACH | $490 | $230 | $225 |
| 625E32000 GROUND ROD | 2 EACH | $385 | $330 | $250 |
| 625E34001 POWER SERVICE, AS PER PLAN | 1 EACH | $1,025 | $420 | $1,000 |
| 625E36000 PLASTIC CAUTION TAPE | 1,253 FT | $0.10 | $0.25 | $0.75 |
| 625E39520 PULL BOX CLEANED | 2 EACH | $134 | $210 | $200 |
| 625E75506 LUMINAIRE REMOVED | 2 EACH | $31.00 | $105 | $50.00 |
| 625E75800 DISCONNECT CIRCUIT | 1 EACH | $103 | $210 | $350 |
| 632E68200 POWER CABLE, 2 CONDUCTOR, NO. 6 AWG | 23 FT | $5.15 | $9.00 | $4.25 |
| 632E90101 REMOVAL OF TRAFFIC SIGNAL INSTALLATION, AS PER PLA | 1 EACH | $6,800 | $4,200 | $4,000 |
| 809E60040 CCTV IP-CAMERA SYSTEM, QUAD MULTI-VIEW FIXED WITH | 1 EACH | $13,900 | $10,000 | $10,000 |
| 621E00100 RPM | 237 EACH | $24.00 | $24.00 | $23.00 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 140 EACH | $6.00 | $23.00 | $2.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 553 FT | $12.75 | $13.00 | $10.00 |
| 630E06400 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, S4X7.7 | 133 FT | $17.50 | $16.00 | $19.00 |
| 630E06500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W6X9 | 121 FT | $19.00 | $19.00 | $22.00 |
| 630E08004 ONE WAY SUPPORT, NO. 3 POST | 30 FT | $13.00 | $13.00 | $12.00 |
| 630E08600 SIGN POST REFLECTOR | 19 EACH | $46.00 | $45.00 | $40.00 |
| 630E09000 BREAKAWAY STRUCTURAL BEAM CONNECTION | 15 EACH | $232 | $230 | $295 |
| 630E80100 SIGN, FLAT SHEET | 585 SF | $19.00 | $19.00 | $14.00 |
| 630E80200 SIGN, GROUND MOUNTED EXTRUSHEET | 92 SF | $25.75 | $26.00 | $18.00 |
| 630E84500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT FOUNDATION | 4 EACH | $1,025 | $1,050 | $985 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 50 EACH | $15.25 | $15.00 | $10.00 |
| 630E85400 REMOVAL OF GROUND MOUNTED MAJOR SIGN AND DISPOSAL | 2 EACH | $102 | $105 | $265 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 42 EACH | $15.25 | $15.00 | $10.00 |
| 630E86102 REMOVAL OF GROUND MOUNTED STRUCTURAL BEAM SUPPORT | 6 EACH | $410 | $420 | $195 |
| 642E30030 REMOVAL OF PAVEMENT MARKING | 0.12 MILE | $7,025 | $7,200 | $6,828 |
| 644E00100 EDGE LINE, 4" | 2.26 MILE | $2,750 | $2,800 | $2,681 |
| 644E00200 LANE LINE, 4" | 1.19 MILE | $1,630 | $1,670 | $1,582 |
| 644E00300 CENTER LINE | 0.01 MILE | $9,425 | $9,600 | $9,150 |
| 644E00400 CHANNELIZING LINE, 8" | 3,816 FT | $1.65 | $1.60 | $1.60 |
| 644E00500 STOP LINE | 54 FT | $6.40 | $6.50 | $6.25 |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 346 FT | $6.40 | $6.50 | $6.30 |
| 644E00720 CHEVRON MARKING | 363 FT | $6.40 | $6.50 | $6.30 |
| 644E01300 LANE ARROW | 49 EACH | $128 | $130 | $124 |
| 644E01500 DOTTED LINE, 4" | 280 FT | $1.35 | $1.35 | $1.30 |
| 644E20800 YIELD LINE | 102 FT | $16.75 | $17.00 | $16.25 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 80 HOUR | $75.00 | $65.00 | $75.00 |
| 614E11630 INCREASED BARRIER DELINEATION | 1,250 FT | $1.00 | $0.45 | $0.96 |
| 614E12336 WORK ZONE IMPACT ATTENUATOR (UNIDIRECTIONAL) | 10 EACH | $2,300 | $2,300 | $1,945 |
| 614E12338 WORK ZONE IMPACT ATTENUATOR (BIDIRECTIONAL) | 1 EACH | $2,400 | $2,400 | $1,975 |
| 614E12800 WORK ZONE RAISED PAVEMENT MARKER | 1,028 EACH | $11.25 | $11.00 | $5.75 |
| 614E13310 BARRIER REFLECTOR, TYPE 1, ONE WAY | 96 EACH | $24.25 | $8.00 | $24.00 |
| 614E13350 OBJECT MARKER, ONE WAY | 124 EACH | $27.25 | $15.00 | $26.50 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 8 SNMT | $975 | $1,000 | $1,500 |
| 614E20000 WORK ZONE LANE LINE, CLASS I, 4" | 0.72 MILE | $1,930 | $1,980 | $1,875 |
| 614E21000 WORK ZONE CENTER LINE, CLASS I | 0.2 MILE | $4,890 | $5,000 | $4,750 |
| 614E22000 WORK ZONE EDGE LINE, CLASS I, 4" | 4.69 MILE | $1,487 | $1,525 | $1,444 |
| 614E23000 WORK ZONE CHANNELIZING LINE, CLASS I, 8" | 7,252 FT | $0.40 | $0.40 | $0.40 |
| 614E24000 WORK ZONE DOTTED LINE, CLASS I | 6,265 FT | $0.37 | $0.40 | $0.36 |
| 614E26000 WORK ZONE STOP LINE, CLASS I | 50 FT | $14.40 | $14.00 | $14.00 |
| 614E30200 WORK ZONE ARROW, CLASS I, 642 PAINT | 33 EACH | $155 | $150 | $150 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $15,507 | $12,000 | $15,000 |
| 619E16010 FIELD OFFICE, TYPE B | 8 MNTH | $1,525 | $2,500 | $1,600 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $5,675 | $30,000 | $25,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 424E12000 FINE GRADED POLYMER ASPHALT CONCRETE, TYPE B | 5,198 CY | $152.51 | $793k | 32% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 1,125 CY | $146 | $164k | 7% |
| 897E01010 PAVEMENT PLANING, ASPHALT CONCRETE, CLASS A, 0.75" | 187,128 SY | $0.7 | $131k | 5% |
| 897E02000 PATCHING PLANED SURFACE | 37,570 SY | $1.6 | $60k | 2% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 5,850 FT | $10 | $59k | 2% |
| 441E10000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (446), PG | 298 CY | $192.5 | $57k | 2% |
| 204E30020 GRANULAR MATERIAL, TYPE C | 1,437 CY | $39.5 | $57k | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $53,000 | $53k | 2% |
| 304E20000 AGGREGATE BASE | 1,107 CY | $44.5 | $49k | 2% |
| 644E00104 EDGE LINE, 6" | 16.12 MILE | $3,040 | $49k | 2% |