ALL-D01 ALL 4th St. Paving OP
ALL County · est $0.1M
Bid dateThursday, April 23—
ALL County · est $0.1M
Bid form · ODOT
| Item | Qty |
|---|
ODOT bid tab line items with each bidder’s unit price. Top 8items by winning bid’s extended amount.
| Item | Quantity | R1Bluffton Paving INC | R2Shelly Company | % of bid |
|---|---|---|---|---|
| 441E50400 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448) | — | $221 | $295 | 72% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE , 1.5" THICKNES | 4,845 SY | $2.20 | $3.50 | 17% |
| 253E02000 PAVEMENT REPAIR | 11 CY | $184 | $450 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $1,500 | $2,000 | 2% |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | 2% |
| 407E10000 TACK COAT | 412 GAL | $2.00 | $2.50 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $500 | $500 | 1% |
| 254E01600 PATCHING PLANED SURFACE | 97 SY | $5.00 | $10.00 | 1% |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| Unit price |
|---|
| Extended |
|---|
| % |
|---|
| 441E50400 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448) | — | $221 | $45k | 72% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE , 1.5" THICKNES | 4,845 SY | $2.2 | $11k | 17% |
| 253E02000 PAVEMENT REPAIR | 11 CY | $184 | $2k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $1,500 | $2k | 2% |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1 | $1k | 2% |
| 407E10000 TACK COAT | 412 GAL | $2 | $824 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $500 | $500 | 1% |
| 254E01600 PATCHING PLANED SURFACE | 97 SY | $5 | $485 | 1% |