FAY-CR 503-00.30
FAY County · est $0.9M
Bid dateThursday, May 21—
FAY County · est $0.9M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 9.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 39 more items below.
| Item | Quantity | R1Shelly & Sands INC | R2Complete General Construction Company | R3Eagle Bridge CO | % of bid |
|---|---|---|---|---|---|
| 515E12030 PRESTRESSED CONCRETE COMPOSITE BOX BEAM BRIDGE MEM | 27 EACH | $8,650 | $10,000 | $10,500 | 28% |
| 511E31613 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE, AS | 156 CY | $796 | $700 | $800 | 15% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $79,600 | $107,000 | $200,000 | 10% |
| 526E25000 REINFORCED CONCRETE APPROACH SLABS (T=15") | 210 SY | $270 | $320 | $300 | 7% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $50,000 | $15,000 |
| Item | Quantity | R1Shelly & Sands INC | R2Complete General Construction Company | R3Eagle Bridge CO |
|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $1,500 | $4,500 | $3,500 |
| 202E30000 WALK REMOVED | 63 SF | $4.40 | $7.00 | $12.00 |
| 202E32500 CURB AND GUTTER REMOVED | 167 FT | $5.00 | $12.00 | $12.00 |
| 202E38000 GUARDRAIL REMOVED | 100 FT | $2.00 | $2.00 | $1.55 |
| 202E42000 ANCHOR ASSEMBLY REMOVED, TYPE A | 2 EACH | $250 | $245 | $275 |
| 202E42040 ANCHOR ASSEMBLY REMOVED, TYPE T |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $35,000 |
| 6% |
| 517E75120 RAILING (CONCRETE PARAPET WITH TWIN STEEL TUBE RAI | 252 FT | $195 | $200 | $225 | 6% |
| 507E71200 SPECIAL - PILE ENCASEMENT | 279 FT | $150 | $120 | $100 | 5% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 36,087 LB | $1.00 | $1.15 | $1.10 | 4% |
| 511E43260 CLASS QC2 CONCRETE, PIER CAP | 21 CY | $1,560 | $1,200 | $1,650 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $20,000 | $40,000 | 2% |
| 619E16010 FIELD OFFICE, TYPE B | 6 MNTH | $2,800 | $2,000 | $1,500 | 2% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $13,000 | $3,000 | $6,000 | 2% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 33 CY | $380 | $325 | $381 | 2% |
| 526E90010 TYPE A INSTALLATION | 63 FT | $185 | $160 | $150 | 1% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $10,000 | $4,000 | $2,500 | 1% |
| 606E35003 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1, AS PER PLAN | 4 EACH | $2,300 | $2,435 | $1,980 | 1% |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 418 SY | $20.50 | $20.50 | $20.50 | 1% |
| 202E23500 WEARING COURSE REMOVED | 543 SY | $14.00 | $11.00 | $10.00 | 1% |
| 516E43100 ELASTOMERIC BEARING WITH INTERNAL LAMINATES ONLY ( | 108 EACH | $65.00 | $110 | $100 | 1% |
| 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER | 43 CY | $120 | $80.00 | $85.00 | 1% |
| 4 EACH |
| $100 |
| $90.00 |
| $125 |
| 203E10000 EXCAVATION | 147 CY | $25.00 | $32.00 | $70.00 |
| 203E20000 EMBANKMENT | 5 CY | $22.00 | $80.00 | $125 |
| 204E10000 SUBGRADE COMPACTION | 144 SY | $4.85 | $3.50 | $13.00 |
| 606E15050 GUARDRAIL, TYPE MGS | 62.5 FT | $20.00 | $29.20 | $16.44 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, (MASH 2016) | 1 EACH | $2,300 | $2,375 | $2,506 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 1 EACH | $1,000 | $985 | $927 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $100 | $88.00 | $250 |
| 659E00300 TOPSOIL | 96 CY | $45.00 | $35.00 | $40.00 |
| 659E10000 SEEDING AND MULCHING | 864 SY | $2.95 | $2.92 | $5.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.12 TON | $605 | $650 | $1,250 |
| 659E31000 LIME | 0.18 ACRE | $70.00 | $153 | $10.00 |
| 659E35000 WATER | 5 MGAL | $1.00 | $1.00 | $10.00 |
| 832E30000 EROSION CONTROL | 5,000 EACH | $1.00 | $1.00 | $1.00 |
| 255E10160 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT, | 4 SY | $420 | $495 | $500 |
| 255E20000 FULL DEPTH PAVEMENT SAWING | 14 FT | $16.00 | $25.00 | $2.00 |
| 304E20000 AGGREGATE BASE | 24 CY | $125 | $96.00 | $135 |
| 407E10000 TACK COAT | 15 GAL | $1.75 | $10.00 | $1.75 |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 6 CY | $415 | $600 | $416 |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (7 CY | $400 | $600 | $401 |
| 609E26000 CURB, TYPE 6 | 67 FT | $70.00 | $53.00 | $50.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, BIDIRECTIONAL | 5 EACH | $10.00 | $8.00 | $10.02 |
| 646E10200 CENTER LINE | 0.1 MILE | $14,500 | $39,500 | $15,536 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 16 HOUR | $72.00 | $85.00 | $65.00 |
| 614E12420 DETOUR SIGNING | 1 LS | $2,900 | $3,640 | $5,500 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 5 CY | $222 | $250 | $600 |
| 202E22900 APPROACH SLAB REMOVED | 162 SY | $19.00 | $40.00 | $40.00 |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $3,200 | $6,000 | $15,000 |
| 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR | 100 LB | $1.50 | $2.00 | $1.10 |
| 512E10050 SEALING OF CONCRETE SURFACES (NON-EPOXY) | 159 SY | $8.50 | $8.50 | $8.50 |
| 516E13900 2" PREFORMED EXPANSION JOINT FILLER | 50 SF | $10.00 | $14.00 | $12.00 |
| 516E14020 SEMI-INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 80 FT | $26.00 | $45.00 | $30.00 |
| 516E41100 1/8" PREFORMED BEARING PAD | 54 EACH | $19.00 | $32.00 | $10.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $5,097 | $9,000 | $10,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 515E12030 PRESTRESSED CONCRETE COMPOSITE BOX BEAM BRIDGE MEM | 27 EACH | $8,650 | $234k | 26% |
| 511E31613 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE, AS | 156 CY | $796 | $124k | 14% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $79,600 | $80k | 9% |
| 526E25000 REINFORCED CONCRETE APPROACH SLABS (T=15") | 210 SY | $270 | $57k | 6% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $50,000 | $50k | 6% |
| 517E75120 RAILING (CONCRETE PARAPET WITH TWIN STEEL TUBE RAI | 252 FT | $195 | $49k | 6% |
| 507E71200 SPECIAL - PILE ENCASEMENT | 279 FT | $150 | $42k | 5% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 36,087 LB | $1 | $36k | 4% |
| 511E43260 CLASS QC2 CONCRETE, PIER CAP | 21 CY | $1,560 | $33k | 4% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $20k | 2% |