NOB-IR 77-02.50
NOB County · est $0.3M
Bid dateThursday, May 7—
NOB County · est $0.3M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 5.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 21 more items below.
| Item | Quantity | R1Shelly & Sands INC | R2Nls Paving, INC | % of bid |
|---|---|---|---|---|
| 302E46000 ASPHALT CONCRETE BASE, PG64-22 | 466 CY | $140 | $175 | 21% |
| 442E20000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 130 CY | $225 | $290 | 10% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 1,270 FT | $22.00 | $25.00 | 9% |
| 304E20000 AGGREGATE BASE | 260 CY | $80.00 | $90.00 | 7% |
| 832E30000 EROSION CONTROL | 20,000 EACH | $1.00 | $1.00 | 7% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $20,000 | $15,000 | 7% |
| 624E10000 MOBILIZATION | 1 LS | $19,351 | $25,000 | 6% |
| 442E20200 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE | 75 CY | $200 |
| Item | Quantity | R1Shelly & Sands INC | R2Nls Paving, INC |
|---|---|---|---|
| 202E20010 HEADWALL REMOVED | 1 EACH | $200 | $475 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 103 FT | $9.24 | $10.00 |
| 202E75000 FENCE REMOVED | 175 FT | $6.50 | $2.60 |
| 203E20000 EMBANKMENT | 5 CY | $78.00 | $15.00 |
| 204E10000 SUBGRADE COMPACTION | 1,492 SY | $2.55 | $1.50 |
| 209E60500 LINEAR GRADING | 0.12 MILE | $6,100 | $5,000 |
| 209E70000 BORROW | 45 CY | $25.00 | $6.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $240 |
| 5% |
| 611E10600 24" CONDUIT, TYPE C | 103 FT | $125 | $120 | 4% |
| 202E23000 PAVEMENT REMOVED | 1,492 SY | $6.75 | $20.00 | 3% |
| 614E22210 WORK ZONE EDGE LINE, CLASS I, 6", 740.06, TYPE I | 1.08 MILE | $8,500 | $8,030 | 3% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.5" | 1,628 SY | $5.25 | $4.25 | 3% |
| 203E10000 EXCAVATION | 362 CY | $23.50 | $50.00 | 3% |
| 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P | 1 LS | $7,500 | $5,000 | 2% |
| 659E10000 SEEDING AND MULCHING | 3,300 SY | $2.25 | $0.92 | 2% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $5,350 | $750 | 2% |
| 644E00104 EDGE LINE, 6" | 1.08 MILE | $4,885 | $4,630 | 2% |
| 618E40100 RUMBLE STRIPS, SHOULDER (ASPHALT CONCRETE) | 1,220 FT | $4.25 | $3.75 | 2% |
| 607E15000 FENCE, TYPE 47 | 175 FT | $26.50 | $24.80 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $4,500 | $1,500 | 1% |
| 659E20000 COMMERCIAL FERTILIZER |
| 0.45 TON |
| $700 |
| $605 |
| 659E31000 LIME | 0.69 ACRE | $80.00 | $70.00 |
| 659E35000 WATER | 9 MGAL | $1.00 | $1.00 |
| 602E20000 CONCRETE MASONRY | 0.46 CY | $3,900 | $4,000 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 654 FT | $5.00 | $3.00 |
| 407E20000 NON-TRACKING TACK COAT | 359 GAL | $3.00 | $3.00 |
| 621E00100 RPM | 41 EACH | $95.00 | $90.00 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 41 EACH | $4.50 | $4.00 |
| 644E00204 LANE LINE, 6" | 0.62 MILE | $2,525 | $2,380 |
| 644E30030 REMOVAL OF PAVEMENT MARKING | 1.7 MILE | $2,500 | $1,856 |
| 614E12350 WORK ZONE IMPACT ATTENUATOR | 1 EACH | $2,375 | $3,725 |
| 614E20560 WORK ZONE LANE LINE, CLASS III, 6", 642 PAINT | 0.62 MILE | $1,215 | $1,150 |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 1.08 MILE | $1,325 | $1,250 |
| 614E24402 WORK ZONE DOTTED LINE, CLASS I, 6", 740.06, TYPE I | 840 FT | $1.25 | $1.20 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 302E46000 ASPHALT CONCRETE BASE, PG64-22 | 466 CY | $140 | $65k | 19% |
| 442E20000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 130 CY | $225 | $29k | 9% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 1,270 FT | $22 | $28k | 8% |
| 304E20000 AGGREGATE BASE | 260 CY | $80 | $21k | 6% |
| 832E30000 EROSION CONTROL | 20,000 EACH | $1 | $20k | 6% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $20,000 | $20k | 6% |
| 624E10000 MOBILIZATION | 1 LS | $19,351 | $19k | 6% |
| 442E20200 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE | 75 CY | $200 | $15k | 4% |
| 611E10600 24" CONDUIT, TYPE C | 103 FT | $125 | $13k | 4% |
| 202E23000 PAVEMENT REMOVED | 1,492 SY | $6.75 | $10k | 3% |