MED-SR 3/SR 94-24.34/20.11
MED County · est $0.4M
Bid dateThursday, June 4—
MED County · est $0.4M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 6.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 30 more items below.
| Item | Quantity | R1Eclipse CO LLC | R2Great Lakes Demolition Company | R3Fabrizi Trucking & Paving CO INC | R4Black Horse Bridge Construction INC | R5Digioia-suburban Excavating LLC | R6S E T INC | R7Simonson Construction Services INC | R8Lockhart Concrete CO | % of bid |
|---|---|---|---|---|---|---|---|---|---|---|
| 611E53500 63" X 98" CONDUIT, TYPE A, 706.04 | 102 FT | $731 | $965 | $810 | $950 | $607 | $790 | $1,060 | $1,617 | 21% |
| 832E30000 EROSION CONTROL | 70,000 EACH | $1.00 | $1.00 | $1.00 |
| Item | Quantity | R1Eclipse CO LLC | R2Great Lakes Demolition Company | R3Fabrizi Trucking & Paving CO INC | R4Black Horse Bridge Construction INC | R5Digioia-suburban Excavating LLC | R6S E T INC | R7Simonson Construction Services INC | R8Lockhart Concrete CO |
|---|---|---|---|---|---|---|---|---|---|
| 202E23000 PAVEMENT REMOVED | 169 SY | $16.50 | $20.00 | $16.00 | $36.00 | $90.00 | $14.00 | $17.27 | $12.00 |
| 202E23010 PAVEMENT REMOVED, ASPHALT | 138 SY | $15.50 | $20.00 | $16.00 | $36.00 | $83.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $1.00 |
| $1.00 |
| $1.00 |
| $1.00 |
| $1.00 |
| 19% |
| 203E20000 EMBANKMENT | 2,964 CY | $10.00 | $15.00 | $15.25 | $17.00 | $21.00 | $15.00 | $24.56 | $10.00 | 8% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $26,114 | $8,000 | $3,500 | $6,000 | $12,000 | $9,600 | $15,293 | $1,000 | 7% |
| 659E00300 TOPSOIL | 512 CY | $42.00 | $53.00 | $62.00 | $28.00 | $64.00 | $67.25 | $19.00 | $25.00 | 6% |
| 611E13200 30" CONDUIT, TYPE A | 92 FT | $215 | $135 | $314 | $520 | $161 | $264 | $222 | $250 | 5% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 63 CY | $271 | $235 | $185 | $175 | $273 | $292 | $292 | $230 | 5% |
| 624E10000 MOBILIZATION | 1 LS | $15,000 | $15,000 | $19,500 | $24,000 | $12,000 | $48,350 | $13,441 | $19,000 | 4% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $14,000 | $5,180 | $10,800 | $8,000 | $6,300 | $11,100 | $10,339 | $4,500 | 4% |
| 203E10000 EXCAVATION | 1,525 CY | $8.00 | $15.00 | $8.00 | $15.00 | $18.00 | $12.00 | $10.23 | $15.00 | 3% |
| 659E10000 SEEDING AND MULCHING | 4,617 SY | $1.80 | $1.00 | $3.00 | $1.00 | $1.25 | $3.00 | $2.57 | $1.00 | 2% |
| 602E20000 CONCRETE MASONRY | 6.1 CY | $1,349 | $450 | $1,100 | $1,350 | $1,250 | $1,506 | $1,997 | $1,000 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $7,500 | $6,000 | $3,200 | $5,000 | $4,200 | $7,200 | $3,611 | $5,000 | 2% |
| 614E12420 DETOUR SIGNING | 1 LS | $6,964 | $8,387 | $6,000 | $8,000 | $7,850 | $5,000 | $9,108 | $5,000 | 2% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 21 CY | $300 | $325 | $398 | $375 | $394 | $486 | $385 | $350 | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $6,000 | $4,110 | $5,000 | $10,000 | $3,850 | $9,000 | $11,311 | $9,000 | 2% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (1-1/4" DEPTH) | 278 SY | $17.00 | $20.00 | $16.00 | $15.00 | $23.00 | $29.00 | $24.52 | $25.00 | 1% |
| 202E38000 GUARDRAIL REMOVED | 1,011 FT | $4.50 | $3.00 | $3.75 | $3.00 | $3.50 | $3.30 | $4.98 | $5.00 | 1% |
| 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (15 CY | $300 | $320 | $450 | $425 | $490 | $486 | $479 | $400 | 1% |
| 619E16010 FIELD OFFICE, TYPE B | 6 MNTH | $683 | $550 | $1,500 | $500 | $2,500 | $500 | $75.55 | $500 | 1% |
| $14.00 |
| $11.67 |
| $10.00 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 25 FT | $33.00 | $20.00 | $15.00 | $28.00 | $53.00 | $10.00 | $42.93 | $50.00 |
| 202E35200 PIPE REMOVED, OVER 24" | 98 FT | $33.50 | $30.00 | $198 | $115 | $310 | $85.42 | $60.47 | $60.00 |
| 202E75000 FENCE REMOVED | 87 FT | $5.00 | $10.00 | $8.00 | $14.00 | $2.50 | $11.00 | $17.04 | $10.00 |
| 202E98300 REMOVAL MISC.:CONC. PAD | 2 SY | $133 | $50.00 | $15.00 | $130 | $87.00 | $20.00 | $449 | $50.00 |
| 204E10000 SUBGRADE COMPACTION | 343 SY | $3.00 | $3.00 | $1.50 | $8.00 | $1.00 | $1.00 | $8.31 | $5.00 |
| 204E13000 EXCAVATION OF SUBGRADE | 37 CY | $22.50 | $25.00 | $20.00 | $38.00 | $25.00 | $30.00 | $39.45 | $50.00 |
| 204E30010 GRANULAR MATERIAL, TYPE B | 37 CY | $63.00 | $65.00 | $50.00 | $65.00 | $47.50 | $62.25 | $81.11 | $40.00 |
| 204E50000 GEOTEXTILE FABRIC | 95 SY | $2.00 | $5.00 | $3.00 | $4.00 | $3.75 | $3.05 | $8.14 | $4.00 |
| 601E21050 TIED CONCRETE BLOCK MAT, TYPE 1 | 21 SY | $79.00 | $200 | $150 | $140 | $95.00 | $76.25 | $70.89 | $80.00 |
| 601E32104 ROCK CHANNEL PROTECTION, TYPE B WITH GEOTEXTILE FA | 26 CY | $100 | $125 | $120 | $90.00 | $180 | $82.50 | $147 | $127 |
| 601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH GEOTEXTILE FA | 1 CY | $117 | $200 | $250 | $180 | $325 | $308 | $678 | $124 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $155 | $200 | $150 | $100 | $150 | $300 | $292 | $200 |
| 659E14000 REPAIR SEEDING AND MULCHING | 231 SY | $1.75 | $2.00 | $0.50 | $1.00 | $3.50 | $1.00 | $0.60 | $1.00 |
| 659E15000 INTER-SEEDING | 231 SY | $1.75 | $2.00 | $0.50 | $1.00 | $1.00 | $1.00 | $1.17 | $1.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.64 TON | $610 | $1,000 | $1,000 | $1,000 | $545 | $700 | $701 | $650 |
| 659E31000 LIME | 0.95 ACRE | $75.00 | $251 | $110 | $150 | $46.00 | $75.00 | $117 | $450 |
| 659E35000 WATER | 26 MGAL | $1.00 | $10.00 | $2.00 | $1.00 | $70.00 | $1.10 | $10.00 | $50.00 |
| 670E00700 DITCH EROSION PROTECTION | 78 SY | $3.00 | $5.00 | $4.00 | $4.00 | $1.25 | $5.00 | $14.60 | $500 |
| 836E10000 SEEDING AND EROSION CONTROL WITH TURF REINFORCING | 284 SY | $5.50 | $5.00 | $8.50 | $6.00 | $8.25 | $9.00 | $14.24 | $9.00 |
| 611E04600 12" CONDUIT, TYPE C | 12 FT | $49.50 | $60.00 | $50.00 | $110 | $62.75 | $109 | $200 | $100 |
| 611E97300 CONDUIT, MISC.: GAS LINE PROTECTION | 1 LS | $1,732 | $3,000 | $2,000 | $2,400 | $2,270 | $2,500 | $1,539 | $5,000 |
| 304E20000 AGGREGATE BASE | 57 CY | $65.00 | $75.00 | $2.00 | $100 | $93.25 | $67.25 | $82.54 | $50.00 |
| 407E10000 TACK COAT | 73 GAL | $5.00 | $4.00 | $0.10 | $2.00 | $5.00 | $3.00 | $4.67 | $4.00 |
| 411E10000 STABILIZED CRUSHED AGGREGATE | 7 CY | $109 | $100 | $160 | $150 | $152 | $165 | $166 | $80.00 |
| 621E00100 RPM | 2 EACH | $881 | $499 | $1,310 | $960 | $1,225 | $1,056 | $800 | $315 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 2 EACH | $20.50 | $100 | $10.00 | $25.00 | $35.00 | $200 | $66.79 | $225 |
| 642E00100 EDGE LINE, 4", TYPE 1 | 0.16 MILE | $9,130 | $7,743 | $7,595 | $7,200 | $7,225 | $8,000 | $8,407 | $6,500 |
| 642E00300 CENTER LINE, TYPE 1 | 0.08 MILE | $11,280 | $15,487 | $15,250 | $14,500 | $14,475 | $16,000 | $17,515 | $12,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 611E53500 63" X 98" CONDUIT, TYPE A, 706.04 | 102 FT | $731 | $75k | 19% |
| 832E30000 EROSION CONTROL | 70,000 EACH | $1 | $70k | 18% |
| 203E20000 EMBANKMENT | 2,964 CY | $10 | $30k | 8% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $26,114 | $26k | 7% |
| 659E00300 TOPSOIL | 512 CY | $42 | $22k | 5% |
| 611E13200 30" CONDUIT, TYPE A | 92 FT | $215 | $20k | 5% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 63 CY | $271 | $17k | 4% |
| 624E10000 MOBILIZATION | 1 LS | $15,000 | $15k | 4% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $14,000 | $14k | 4% |
| 203E10000 EXCAVATION | 1,525 CY | $8 | $12k | 3% |