HAM-IR 75-03.28
HAM County · est $0.3M
Bid dateThursday, July 2—
HAM County · est $0.3M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 5.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 33 more items below.
| Item | Quantity | R1Prus Construction Company | R2Eclipse CO LLC | R3Barrett Paving Materials INC | R4Rack & Ballauer Excavating CO INC | R5John R Jurgensen Company | % of bid |
|---|---|---|---|---|---|---|---|
| 203E20000 EMBANKMENT | 1,337 CY | $28.00 | $17.00 | $30.00 | $45.00 | $24.00 | 15% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $35,000 | $22,671 | $22,000 | $15,000 | $61,202 | 14% |
| 203E10001 EXCAVATION, AS PER PLAN | 1,471 CY | $18.50 | $27.50 | $35.00 | $45.00 | $26.00 | 11% |
| 809E70000 MAINTAINING ITS DURING CONSTRUCTION |
| Item | Quantity | R1Prus Construction Company | R2Eclipse CO LLC | R3Barrett Paving Materials INC | R4Rack & Ballauer Excavating CO INC | R5John R Jurgensen Company |
|---|---|---|---|---|---|---|
| 202E20010 HEADWALL REMOVED | 1 EACH | $650 | $637 | $200 | $1,000 | $1,393 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 201 FT | $10.00 | $16.00 | $5.00 | $25.00 | $54.29 |
| 202E38000 GUARDRAIL REMOVED | 150 FT | $3.00 | $15.50 | $15.00 | $16.00 | $15.00 |
| 204E10000 SUBGRADE COMPACTION | 289 SY | $4.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 1 LS |
| $23,750 |
| $20,000 |
| $25,000 |
| $23,750 |
| $23,750 |
| 9% |
| 804E15010 FIBER OPTIC CABLE, 24 FIBER | 4,375 FT | $4.50 | $4.50 | $4.50 | $4.50 | $4.50 | 8% |
| 302E46000 ASPHALT CONCRETE BASE, PG64-22 | 74 CY | $230 | $280 | $250 | $285 | $343 | 7% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $10,500 | $8,645 | $2,000 | $20,000 | $7,531 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $10,000 | $29,675 | $10,000 | $60,000 | $10,000 | 4% |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 418 FT | $22.00 | $7.50 | $6.00 | $15.00 | $33.35 | 4% |
| 659E00300 TOPSOIL | 115 CY | $74.00 | $47.00 | $70.00 | $66.00 | $89.49 | 3% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $8,000 | $16,000 | $6,000 | $4,500 | $15,114 | 3% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 100 HOUR | $75.00 | $67.00 | $70.00 | $70.00 | $126 | 3% |
| 203E35141 GRANULAR MATERIAL, TYPE E, AS PER PLAN | 75 CY | $88.00 | $92.50 | $100 | $120 | $162 | 3% |
| 609E24511 CURB, TYPE 4-C, AS PER PLAN | 145 FT | $45.00 | $33.00 | $50.00 | $60.00 | $88.68 | 3% |
| 606E13000 GUARDRAIL, TYPE 5 | 150 FT | $40.00 | $40.00 | $39.00 | $40.00 | $39.00 | 2% |
| 442E10100 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE | 10 CY | $575 | $750 | $575 | $750 | $884 | 2% |
| 442E10000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 9 CY | $590 | $800 | $625 | $800 | $970 | 2% |
| 832E30000 EROSION CONTROL | 5,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 2% |
| 202E23010 PAVEMENT REMOVED, ASPHALT | 208 SY | $22.00 | $18.00 | $30.00 | $35.00 | $74.56 | 2% |
| 618E40100 RUMBLE STRIPS, SHOULDER (ASPHALT CONCRETE) | 145 FT | $30.00 | $46.50 | $50.00 | $45.00 | $29.00 | 2% |
| $4.50 |
| $10.00 |
| $8.00 |
| $7.09 |
| 204E50001 GEOTEXTILE FABRIC, AS PER PLAN | 150 SY | $7.00 | $5.50 | $5.00 | $10.00 | $11.29 |
| 878E25000 INSPECTION AND COMPACTION TESTING OF UNBOUND MATER | 1 LS | $1,600 | $4,120 | $5,000 | $5,000 | $10,000 |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 13 CY | $200 | $91.00 | $150 | $200 | $352 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $200 | $129 | $250 | $150 | $125 |
| 659E10000 SEEDING AND MULCHING | 1,034 SY | $3.50 | $3.50 | $3.10 | $3.25 | $2.75 |
| 659E14000 REPAIR SEEDING AND MULCHING | 52 SY | $1.00 | $1.00 | $2.75 | $1.00 | $2.75 |
| 659E15000 INTER-SEEDING | 52 SY | $0.01 | $0.01 | $1.00 | $0.01 | $1.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.14 TON | $500 | $515 | $1,000 | $500 | $1,000 |
| 659E31000 LIME | 0.21 ACRE | $200 | $206 | $100 | $200 | $100 |
| 659E35000 WATER | 6 MGAL | $1.00 | $1.00 | $10.00 | $1.00 | $10.00 |
| 601E21060 TIED CONCRETE BLOCK MAT, TYPE 2 | 44 SY | $86.00 | $51.50 | $60.00 | $90.00 | $90.88 |
| 602E20000 CONCRETE MASONRY | 0.3 CY | $2,400 | $2,384 | $7,500 | $3,000 | $4,326 |
| 605E14000 6" BASE PIPE UNDERDRAINS | 145 FT | $20.00 | $11.50 | $20.00 | $15.00 | $43.86 |
| 611E01500 6" CONDUIT, TYPE F | 52 FT | $24.00 | $12.50 | $45.00 | $15.00 | $63.25 |
| 611E08200 18" CONDUIT, TYPE F, 707.05 TYPE C OR 707.21 | 77 FT | $43.00 | $45.00 | $85.00 | $120 | $238 |
| 611E99660 MANHOLE RECONSTRUCTED TO GRADE | 1 EACH | $2,800 | $1,630 | $5,000 | $1,500 | $3,328 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 1 EACH | $125 | $223 | $250 | $550 | $712 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 164 FT | $2.25 | $4.00 | $5.00 | $2.50 | $3.00 |
| 304E20000 AGGREGATE BASE | 36 CY | $95.00 | $73.50 | $175 | $110 | $137 |
| 407E10000 TACK COAT | 8 GAL | $54.33 | $20.00 | $3.00 | $1.00 | $10.00 |
| 621E00100 RPM | 4 EACH | $585 | $531 | $515 | $600 | $583 |
| 644E00100 EDGE LINE, 4" | 0.03 MILE | $63,140 | $70,380 | $68,300 | $63,140 | $63,140 |
| 625E22990 NO. 6 AWG 600 VOLT DISTRIBUTION CABLE | 200 FT | $3.25 | $3.50 | $3.25 | $3.25 | $3.25 |
| 625E25750 CONDUIT, 4", MULTICELL, 725.20 , EPC-40 | 200 FT | $17.00 | $17.50 | $17.00 | $17.00 | $17.00 |
| 625E29000 TRENCH | 200 FT | $12.30 | $12.50 | $12.30 | $12.30 | $12.30 |
| 625E36000 PLASTIC CAUTION TAPE | 200 FT | $0.17 | $0.25 | $0.17 | $0.17 | $0.17 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 2 SNMT | $900 | $927 | $995 | $900 | $995 |
| 616E10000 WATER | 9 MGAL | $51.34 | $73.50 | $25.00 | $90.00 | $732 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $3,000 | $7,200 | $2,925 | $4,000 | $2,571 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 203E20000 EMBANKMENT | 1,337 CY | $28 | $37k | 12% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $35,000 | $35k | 11% |
| 203E10001 EXCAVATION, AS PER PLAN | 1,471 CY | $18.5 | $27k | 9% |
| 809E70000 MAINTAINING ITS DURING CONSTRUCTION | 1 LS | $23,750 | $24k | 8% |
| 804E15010 FIBER OPTIC CABLE, 24 FIBER | 4,375 FT | $4.5 | $20k | 6% |
| 302E46000 ASPHALT CONCRETE BASE, PG64-22 | 74 CY | $230 | $17k | 6% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $10,500 | $11k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $10,000 | $10k | 3% |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 418 FT | $22 | $9k | 3% |
| 659E00300 TOPSOIL | 115 CY | $74 | $9k | 3% |