BRO-SR 41-04.18
BRO County · est $0.4M
Bid dateThursday, September 17—
BRO County · est $0.4M
Published by ODOTon this contract’s Proposal PDF · EDGE Goal: 5.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 17 more items below.
| Item | Quantity | R1Alan Stone CO INC | R2Ohio-west Virginia Excavating CO | R3D G M INC | R4George J Igel & CO INC | R5Bbr Drilling Company INC | R6Shelly & Sands INC | R7John R Jurgensen Company | R8R C Construction Company And Son INC | R9Complete General Construction Company | % of bid |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $54,230 | $13,245 | $28,000 | $44,000 | $37,500 | $50,500 | $62,529 | $45,000 | $19,000 | 18% |
| 524E94504 DRILLED SHAFTS, 24" DIAMETER, INTO BEDROCK | 886 FT |
| Item | Quantity | R1Alan Stone CO INC | R2Ohio-west Virginia Excavating CO | R3D G M INC | R4George J Igel & CO INC | R5Bbr Drilling Company INC | R6Shelly & Sands INC | R7John R Jurgensen Company | R8R C Construction Company And Son INC | R9Complete General Construction Company |
|---|---|---|---|---|---|---|---|---|---|---|
| 203E20000 EMBANKMENT | 85 CY | $5.50 | $34.00 | $30.00 | $40.00 | $60.00 | $15.00 | $67.64 | $25.00 | $28.00 |
| 407E10000 TACK COAT | 24 GAL | $17.50 | $15.50 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $58.00 |
| $58.00 |
| $82.00 |
| $55.00 |
| $25.00 |
| $93.00 |
| $109 |
| $150 |
| $149 |
| 17% |
| 524E94502 DRILLED SHAFTS, 24" DIAMETER, ABOVE BEDROCK | 666 FT | $55.00 | $57.50 | $56.00 | $42.00 | $20.00 | $77.00 | $80.99 | $125 | $139 | 12% |
| 524E95000 DRILLED SHAFTS, MISC.:LUG PILE, 24" DIAMETER, UNRE | 653 FT | $55.00 | $63.00 | $56.00 | $50.00 | $80.00 | $85.00 | $96.75 | $100 | $139 | 12% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (NCHRP 350 OR MASH 201 | 1 EACH | $28,000 | $3,685 | $2,250 | $2,200 | $2,500 | $2,200 | $2,200 | $2,500 | $2,200 | 9% |
| 624E10000 MOBILIZATION | 1 LS | $22,000 | $14,150 | $10,000 | $20,000 | $22,000 | $10,000 | $10,000 | $20,000 | $20,000 | 7% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 419 FT | $27.00 | $32.00 | $18.00 | $23.25 | $75.00 | $32.00 | $23.00 | $35.00 | $17.00 | 4% |
| 615E25000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS B | 94 SY | $110 | $145 | $85.00 | $100 | $75.00 | $215 | $207 | $175 | $125 | 3% |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 345 FT | $28.50 | $24.40 | $25.00 | $22.00 | $20.00 | $22.00 | $22.00 | $28.00 | $23.00 | 3% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $6,500 | $3,650 | $14,000 | $20,000 | $2,000 | $14,380 | $17,493 | $3,500 | $22,000 | 2% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.5" | 284 SY | $20.50 | $18.50 | $16.00 | $19.00 | $22.00 | $82.00 | $51.38 | $30.00 | $18.50 | 2% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $5,500 | $920 | $3,000 | $8,000 | $3,500 | $5,800 | $11,996 | $12,000 | $4,000 | 2% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 12 CY | $443 | $398 | $365 | $1,150 | $375 | $1,950 | $1,202 | $750 | $1,100 | 2% |
| 614E12384 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,400 | $2,830 | $1,800 | $1,900 | $5,500 | $2,200 | $1,900 | $2,500 | $2,200 | 2% |
| 507E00400 STEEL PILES, MISC.:W12X 87 STEEL BEAM | 1,522 FT | $3.00 | $48.00 | $55.00 | $60.00 | $120 | $50.00 | $50.99 | $55.00 | $69.00 | 1% |
| 614E21200 WORK ZONE CENTER LINE, CLASS I, 740.06, TYPE I (DO | 0.28 MILE | $15,000 | $14,000 | $12,500 | $11,700 | $12,000 | $11,700 | $11,700 | $12,500 | $12,150 | 1% |
| 621E00100 RPM | 4 EACH | $793 | $547 | $617 | $620 | $240 | $620 | $617 | $1,200 | $550 | 1% |
| 659E10000 SEEDING AND MULCHING | 296 SY | $9.50 | $4.00 | $5.00 | $10.00 | $3.00 | $9.00 | $10.00 | $5.00 | $3.00 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $2,500 | $4,560 | $17,500 | $4,000 | $1,000 | $3,644 | $4,102 | $16,000 | $6,000 | 1% |
| 619E16000 FIELD OFFICE, TYPE A | 2 MNTH | $1,100 | $1,400 | $750 | $2,000 | $3,500 | $4,300 | $1,953 | $100 | $3,000 | 1% |
| $13.50 |
| $2.00 |
| $17.00 |
| $5.00 |
| $61.72 |
| $5.00 |
| $2.00 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 4 EACH | $37.50 | $69.00 | $1.00 | $15.50 | $200 | $50.00 | $22.71 | $50.00 | $45.21 |
| 642E00100 EDGE LINE, 4", TYPE 1 | 0.11 MILE | $18,000 | $10,600 | $14,500 | $14,150 | $15,000 | $14,150 | $14,150 | $12,000 | $10,075 |
| 642E00300 CENTER LINE, TYPE 1 | 0.04 MILE | $19,000 | $31,650 | $15,000 | $14,490 | $20,000 | $14,485 | $14,485 | $12,000 | $27,500 |
| 659E14000 REPAIR SEEDING AND MULCHING | 15 SY | $18.50 | $16.00 | $0.05 | $1.00 | $10.00 | $2.00 | $1.00 | $0.25 | $5.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.04 TON | $706 | $2,900 | $650 | $500 | $2,000 | $750 | $500 | $1,200 | $500 |
| 659E31000 LIME | 0.06 ACRE | $904 | $2,900 | $80.00 | $200 | $2,000 | $100 | $200 | $800 | $500 |
| 659E35000 WATER | 1.6 MGAL | $295 | $635 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $65.00 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 16 HOUR | $83.50 | $75.00 | $50.00 | $73.50 | $400 | $70.00 | $103 | $45.00 | $85.00 |
| 614E11630 INCREASED BARRIER DELINEATION | 419 FT | $3.00 | $2.00 | $2.50 | $2.50 | $10.00 | $0.50 | $2.50 | $5.00 | $1.60 |
| 614E13310 BARRIER REFLECTOR, TYPE 1 (BIDIRECTIONAL) | 9 EACH | $14.00 | $95.00 | $15.00 | $11.00 | $50.00 | $7.00 | $11.00 | $20.00 | $82.00 |
| 614E13360 OBJECT MARKER, TWO WAY | 8 EACH | $19.50 | $76.00 | $15.00 | $15.00 | $50.00 | $12.00 | $15.00 | $20.00 | $66.00 |
| 614E22200 WORK ZONE EDGE LINE, CLASS I, 4", 740.06, TYPE I | 0.09 MILE | $8,300 | $7,900 | $6,750 | $6,500 | $18,000 | $6,500 | $6,500 | $12,500 | $6,850 |
| 614E26400 WORK ZONE STOP LINE, CLASS I, 740.06, TYPE I | 32 FT | $13.00 | $14.00 | $15.00 | $10.00 | $10.00 | $10.00 | $10.00 | $50.00 | $12.00 |
| 616E10000 WATER | 1 MGAL | $128 | $500 | $1.00 | $645 | $1.00 | $35.00 | $6,972 | $1.00 | $130 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $54,230 | $54k | 17% |
| 524E94504 DRILLED SHAFTS, 24" DIAMETER, INTO BEDROCK | 886 FT | $58 | $51k | 16% |
| 524E94502 DRILLED SHAFTS, 24" DIAMETER, ABOVE BEDROCK | 666 FT | $55 | $37k | 12% |
| 524E95000 DRILLED SHAFTS, MISC.:LUG PILE, 24" DIAMETER, UNRE | 653 FT | $55 | $36k | 11% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (NCHRP 350 OR MASH 201 | 1 EACH | $28,000 | $28k | 9% |
| 624E10000 MOBILIZATION | 1 LS | $22,000 | $22k | 7% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 419 FT | $27 | $11k | 4% |
| 615E25000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS B | 94 SY | $110 | $10k | 3% |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 345 FT | $28.5 | $10k | 3% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $6,500 | $7k | 2% |