GEA-County-wide Safety Projects (PART 1, 2, 3)
GEA County · est $12M
Bid dateThursday, November 5—
GEA County · est $12M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 8.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 457 more items below.
| Item | Quantity | R1Marucci & Gaffney Excavating CO | R2Shelly & Sands INC | R3Eclipse CO LLC | R4Karvo Companies INC | R5Fabrizi Trucking & Paving CO INC | R6Tri-mor CORP | R7Kokosing Construction Company INC | R8Catts Construction INC | R9Perk Company INC | % of bid |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 5,958 CY | $128 | $136 | $122 | $128 | $130 | $121 | $163 | $133 | $155 | 14% |
| 832E30000 EROSION CONTROL | 470,000 EACH | $1.00 |
| Item | Quantity | R1Marucci & Gaffney Excavating CO | R2Shelly & Sands INC | R3Eclipse CO LLC | R4Karvo Companies INC | R5Fabrizi Trucking & Paving CO INC | R6Tri-mor CORP | R7Kokosing Construction Company INC | R8Catts Construction INC | R9Perk Company INC |
|---|---|---|---|---|---|---|---|---|---|---|
| 202E11000 STRUCTURE REMOVED | 1 LS | $7,500 | $3,900 | $3,612 | $2,585 | $7,500 | $6,000 | $5,500 | $1,300 | $14,435 |
| 202E20010 HEADWALL REMOVED | 7 EACH | $400 | $260 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $1.00 |
| $1.00 |
| $1.00 |
| $1.00 |
| $1.00 |
| $1.00 |
| $1.00 |
| $1.00 |
| 8% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (3201 CY | $130 | $132 | $122 | $128 | $131 | $135 | $160 | $140 | $150 | 7% |
| 624E10000 MOBILIZATION | 1 LS | $400,000 | $350,000 | $442,000 | $500,000 | $400,000 | $400,000 | $400,000 | $386,847 | $453,300 | 7% |
| 203E10000 EXCAVATION | 28,135 CY | $14.00 | $16.00 | $16.50 | $13.00 | $16.00 | $18.00 | $23.00 | $28.50 | $24.20 | 7% |
| 631E93241 SCHOOL SPEED LIMIT SIGN ASSEMBLY, SOLAR-POWERED, A | 99 EACH | $3,500 | $4,000 | $3,105 | $3,750 | $3,500 | $3,200 | $3,500 | $3,500 | $2,985 | 6% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 1,970 CY | $151 | $170 | $147 | $160 | $151 | $168 | $185 | $162 | $168 | 5% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 2,187 CY | $117 | $121 | $122 | $125 | $118 | $121 | $151 | $132 | $155 | 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $225,000 | $120,000 | $475,000 | $300,000 | $150,000 | $200,000 | $396,025 | $406,000 | $237,000 | 4% |
| 203E10000 EXCAVATION | 13,434 CY | $16.00 | $12.00 | $15.50 | $14.00 | $16.00 | $20.00 | $21.00 | $28.50 | $16.85 | 4% |
| 632E90010 PEDESTAL, MISC.: PEDESTAL, 15', TRANSFORMER BASE, | 113 EACH | $1,800 | $1,200 | $1,560 | $1,125 | $1,800 | $1,800 | $1,800 | $1,900 | $1,595 | 4% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $200,000 | $45,000 | $58,000 | $115,000 | $185,000 | $72,000 | $50,000 | $50,000 | $177,300 | 4% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 1,281 CY | $151 | $188 | $147 | $160 | $152 | $185 | $185 | $159 | $178 | 3% |
| 206E10500 CEMENT | 1,310 TON | $145 | $154 | $147 | $145 | $157 | $160 | $145 | $150 | $168 | 3% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 1,579 CY | $119 | $136 | $122 | $125 | $121 | $121 | $155 | $133 | $170 | 3% |
| 611E04900 12" CONDUIT, TYPE D | 4,070 FT | $45.00 | $46.00 | $39.50 | $58.00 | $55.00 | $50.00 | $53.00 | $46.00 | $33.55 | 3% |
| 304E20000 AGGREGATE BASE | 2,785 CY | $62.00 | $58.00 | $55.50 | $65.00 | $53.00 | $78.00 | $77.00 | $66.00 | $76.00 | 3% |
| 615E20000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A | 3,956 SY | $42.00 | $46.00 | $50.25 | $42.00 | $50.00 | $62.00 | $60.00 | $47.00 | $50.00 | 3% |
| 659E00300 TOPSOIL | 9,148 CY | $18.00 | $8.00 | $27.50 | $12.50 | $26.00 | $20.00 | $8.00 | $36.50 | $28.00 | 3% |
| 304E20000 AGGREGATE BASE | 2,680 CY | $59.00 | $70.00 | $55.25 | $80.00 | $53.00 | $70.00 | $77.00 | $68.00 | $83.60 | 3% |
| $338 |
| $350 |
| $75.00 |
| $300 |
| $250 |
| $200 |
| $335 |
| 202E23000 PAVEMENT REMOVED | 36 SY | $25.00 | $17.00 | $17.00 | $15.00 | $12.00 | $50.00 | $35.00 | $20.00 | $22.00 |
| 202E23010 PAVEMENT REMOVED, ASPHALT | 7,089 SY | $9.00 | $10.00 | $9.50 | $8.00 | $20.00 | $10.00 | $15.00 | $5.35 | $13.95 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 6,101 FT | $10.00 | $23.00 | $7.00 | $10.75 | $18.00 | $10.00 | $17.00 | $3.00 | $20.00 |
| 202E35200 PIPE REMOVED, OVER 24" | 194 FT | $15.00 | $8.00 | $13.75 | $16.75 | $18.00 | $16.00 | $22.00 | $7.50 | $25.00 |
| 202E38000 GUARDRAIL REMOVED | 608 FT | $2.00 | $2.00 | $2.00 | $2.00 | $2.00 | $9.00 | $2.00 | $1.60 | $2.00 |
| 202E58100 CATCH BASIN REMOVED | 9 EACH | $400 | $590 | $392 | $300 | $200 | $400 | $400 | $200 | $550 |
| 202E70110 SPECIAL - PIPE CLEANOUT, 24" AND UNDER | 100 FT | $25.00 | $15.00 | $26.00 | $7.50 | $25.00 | $20.00 | $12.50 | $9.00 | $20.00 |
| 202E70120 SPECIAL - PIPE CLEANOUT, 27" TO 48" | 100 FT | $25.00 | $15.00 | $31.25 | $10.00 | $45.00 | $40.00 | $19.00 | $11.00 | $30.00 |
| 202E70130 SPECIAL - PIPE CLEANOUT OVER 48" | 100 FT | $30.00 | $15.00 | $41.75 | $10.00 | $60.00 | $50.00 | $25.00 | $13.00 | $40.00 |
| 202E98100 REMOVAL MISC.: 24" ROCK AND OVER | 23 EACH | $100 | $58.00 | $35.50 | $60.00 | $15.00 | $100 | $50.00 | $60.00 | $50.00 |
| 202E98100 REMOVAL MISC.: INSPECTION WELL | 2 EACH | $50.00 | $190 | $254 | $275 | $250 | $100 | $275 | $425 | $495 |
| 202E98100 REMOVAL MISC.: WOOD POST REMOVED | 1 EACH | $50.00 | $180 | $102 | $135 | $10.00 | $100 | $90.00 | $50.00 | $110 |
| 202E98200 REMOVAL MISC.: CONDUIT | 60 FT | $15.00 | $4.00 | $50.75 | $12.00 | $15.00 | $10.00 | $18.00 | $29.00 | $20.00 |
| 203E20000 EMBANKMENT | 7,363 CY | $8.00 | $13.00 | $12.75 | $12.50 | $8.00 | $8.00 | $8.00 | $15.50 | $12.80 |
| 203E20001 EMBANKMENT, AS PER PLAN | 50 CY | $20.00 | $18.00 | $42.75 | $25.00 | $50.00 | $32.00 | $5.50 | $25.00 | $100 |
| 204E10000 SUBGRADE COMPACTION | 13,974 SY | $1.50 | $1.00 | $1.25 | $0.75 | $1.85 | $1.00 | $1.75 | $1.00 | $1.50 |
| 204E13000 EXCAVATION OF SUBGRADE | 1,500 CY | $15.00 | $16.00 | $15.00 | $8.00 | $14.00 | $20.00 | $19.00 | $13.00 | $18.20 |
| 204E30010 GRANULAR MATERIAL, TYPE B | 1,500 CY | $40.00 | $25.00 | $46.50 | $26.50 | $48.00 | $80.00 | $55.00 | $35.00 | $71.50 |
| 204E45000 PROOF ROLLING | 12 HOUR | $85.00 | $340 | $206 | $150 | $100 | $110 | $160 | $160 | $175 |
| 204E51000 GEOGRID | 4,600 SY | $2.00 | $1.00 | $1.50 | $1.40 | $4.00 | $2.00 | $2.25 | $1.25 | $3.25 |
| 206E15010 CEMENT STABILIZED SUBGRADE, 12 INCHES DEEP | 50,626 SY | $1.70 | $3.00 | $1.75 | $1.70 | $3.35 | $2.50 | $3.75 | $2.00 | $1.95 |
| 206E20000 TEST ROLLING | 25 HOUR | $125 | $212 | $791 | $160 | $175 | $100 | $160 | $160 | $125 |
| 606E15050 GUARDRAIL, TYPE MGS | 612.5 FT | $17.20 | $19.00 | $18.75 | $17.60 | $18.00 | $18.00 | $17.20 | $18.00 | $17.60 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (NCHRP 350) | 6 EACH | $2,175 | $2,300 | $2,309 | $2,245 | $2,245 | $2,500 | $2,175 | $2,500 | $2,245 |
| 606E26151 ANCHOR ASSEMBLY, MGS TYPE E, AS PER PLAN (NCHRP 35 | 1 EACH | $2,360 | $2,500 | $2,431 | $2,380 | $2,380 | $2,800 | $2,360 | $2,800 | $2,380 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 5 EACH | $975 | $1,000 | $1,000 | $975 | $975 | $1,025 | $975 | $1,025 | $975 |
| 623E38500 MONUMENT ASSEMBLY | 2 EACH | $1,200 | $1,200 | $990 | $995 | $850 | $960 | $575 | $1,700 | $1,000 |
| 690E50100 SPECIAL - MAILBOX SUPPORT SYSTEM, SINGLE | 88 EACH | $145 | $155 | $173 | $165 | $165 | $100 | $200 | $167 | $165 |
| 690E50200 SPECIAL - MAILBOX SUPPORT SYSTEM, DOUBLE | 15 EACH | $265 | $280 | $199 | $280 | $280 | $130 | $300 | $350 | $280 |
| 690E50300 SPECIAL - MAILBOX SUPPORT SYSTEM, MULTIPLE | 1 EACH | $385 | $408 | $281 | $395 | $395 | $400 | $400 | $1,171 | $395 |
| 601E23000 ARTICULATING CONCRETE BLOCK REVETMENT SYSTEM, TYPE | 180 SY | $8.90 | $145 | $121 | $125 | $195 | $85.00 | $165 | $200 | $300 |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 52.8 CY | $125 | $205 | $91.75 | $190 | $115 | $125 | $125 | $390 | $327 |
| 601E32210 ROCK CHANNEL PROTECTION, TYPE C WITH AGGREGATE FIL | 2.9 CY | $250 | $460 | $102 | $775 | $160 | $180 | $260 | $300 | $660 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $25.00 | $85.00 | $152 | $250 | $200 | $300 | $500 | $55.00 | $200 |
| 659E10000 SEEDING AND MULCHING | 67,586 SY | $0.60 | $0.50 | $1.00 | $0.63 | $0.49 | $2.00 | $0.45 | $0.60 | $3.30 |
| 659E14000 REPAIR SEEDING AND MULCHING | 3,379 SY | $0.50 | $0.40 | $1.00 | $0.75 | $0.36 | $1.00 | $0.33 | $0.50 | $3.00 |
| 659E20000 COMMERCIAL FERTILIZER | 9.13 TON | $250 | $1,600 | $254 | $800 | $1,620 | $1,100 | $1,500 | $1,659 | $500 |
| 659E31000 LIME | 13.96 ACRE | $75.00 | $210 | $50.75 | $1.00 | $216 | $500 | $199 | $221 | $200 |
| 659E35000 WATER | 365 MGAL | $1.00 | $2.00 | $0.25 | $1.00 | $1.60 | $50.00 | $1.50 | $1.65 | $1.00 |
| 660E25000 SODDING STAKED | 154 SY | $20.00 | $5.00 | $12.75 | $10.00 | $5.00 | $15.00 | $4.38 | $5.00 | $20.00 |
| 670E00510 SLOPE EROSION PROTECTION MAT, TYPE A | 202 SY | $3.50 | $5.00 | $1.50 | $2.50 | $5.00 | $3.00 | $4.38 | $4.85 | $3.25 |
| 670E00770 DITCH EROSION PROTECTION MAT, TYPE G | 36,000 SY | $1.85 | $2.00 | $2.00 | $2.50 | $2.15 | $1.10 | $2.00 | $2.25 | $3.25 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $5,000 | $2,400 | $9,034 | $2,000 | $2,500 | $2,500 | $2,250 | $10,000 | $2,365 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $20,000 | $4,300 | $4,568 | $15,000 | $4,500 | $8,500 | $12,500 | $18,500 | $3,335 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $6,000 | $5,550 | $8,628 | $5,500 | $8,000 | $10,000 | $5,000 | $12,000 | $5,250 |
| 836E10000 SEEDING AND EROSION CONTROL WITH TURF REINFORCING | 4,715 SY | $4.00 | $3.00 | $4.00 | $8.00 | $2.70 | $5.25 | $2.50 | $2.80 | $6.75 |
| 602E20000 CONCRETE MASONRY | 23.79 CY | $1,250 | $1,800 | $2,199 | $955 | $1,350 | $2,400 | $2,150 | $1,850 | $2,995 |
| 611E00900 6" CONDUIT, TYPE B | 100 FT | $15.00 | $16.00 | $20.00 | $25.00 | $35.00 | $25.00 | $22.00 | $35.00 | $87.50 |
| 611E01400 6" CONDUIT, TYPE E | 100 FT | $15.00 | $16.00 | $11.50 | $25.00 | $16.00 | $25.00 | $19.00 | $35.00 | $23.25 |
| 611E01500 6" CONDUIT, TYPE F | 100 FT | $15.00 | $16.00 | $11.50 | $25.00 | $21.00 | $25.00 | $19.00 | $15.00 | $23.25 |
| 611E04600 12" CONDUIT, TYPE C | 48 FT | $82.00 | $80.00 | $39.75 | $62.00 | $40.00 | $54.00 | $64.00 | $70.00 | $110 |
| 611E05700 15" CONDUIT, TYPE A | 48 FT | $98.00 | $94.00 | $85.50 | $165 | $165 | $92.00 | $150 | $100 | $159 |
| 611E05700 15" CONDUIT, TYPE A, 706.02 | 12 FT | $260 | $176 | $285 | $175 | $110 | $105 | $210 | $228 | $500 |
| 611E05900 15" CONDUIT, TYPE B | 330 FT | $72.00 | $70.00 | $45.25 | $68.00 | $90.00 | $85.00 | $110 | $81.00 | $125 |
| 611E06100 15" CONDUIT, TYPE C | 102 FT | $105 | $76.00 | $42.75 | $68.00 | $75.00 | $66.00 | $70.00 | $57.00 | $53.50 |
| 611E06400 15" CONDUIT, TYPE D | 1,010 FT | $57.00 | $55.00 | $42.00 | $60.00 | $85.00 | $70.00 | $61.00 | $48.00 | $36.30 |
| 611E07200 18" CONDUIT, TYPE A | 96 FT | $116 | $110 | $87.50 | $130 | $170 | $115 | $133 | $135 | $177 |
| 611E07400 18" CONDUIT, TYPE B | 62 FT | $95.00 | $85.00 | $53.75 | $95.00 | $140 | $86.00 | $120 | $84.00 | $125 |
| 611E07600 18" CONDUIT, TYPE C | 9 FT | $110 | $120 | $65.50 | $98.00 | $95.00 | $70.00 | $100 | $68.00 | $77.00 |
| 611E07900 18" CONDUIT, TYPE D | 581 FT | $65.00 | $50.00 | $46.50 | $70.00 | $90.00 | $80.00 | $72.00 | $56.00 | $39.10 |
| 611E10200 24" CONDUIT, TYPE A | 58 FT | $140 | $140 | $142 | $140 | $175 | $117 | $159 | $122 | $176 |
| 611E10200 24" CONDUIT, TYPE A, 706.02 | 12 FT | $180 | $125 | $324 | $185 | $350 | $125 | $275 | $261 | $298 |
| 611E10900 24" CONDUIT, TYPE D | 190 FT | $76.00 | $62.00 | $54.75 | $120 | $100 | $95.00 | $82.00 | $79.00 | $43.50 |
| 611E13200 30" CONDUIT, TYPE A | 12 FT | $350 | $240 | $352 | $125 | $475 | $250 | $450 | $296 | $276 |
| 611E13900 30" CONDUIT, TYPE D | 1,495 FT | $75.00 | $85.00 | $64.00 | $110 | $105 | $119 | $104 | $89.00 | $55.75 |
| 611E16200 36" CONDUIT, TYPE A | 108 FT | $98.00 | $200 | $122 | $180 | $210 | $185 | $225 | $177 | $175 |
| 611E53000 38" X 60" CONDUIT, TYPE A, 706.04 | 48 FT | $250 | $320 | $305 | $375 | $310 | $525 | $395 | $313 | $480 |
| 611E97400 CONDUIT, MISC.: 9'-9" SPAN X 4'-0" RISE CONDUIT, T | 54 FT | $800 | $1,220 | $842 | $800 | $1,495 | $1,100 | $1,050 | $947 | $1,265 |
| 611E97400 CONDUIT, MISC.:TYPE B FOR DRAINAGE DISCHARGE CONTI | 60 FT | $25.00 | $24.00 | $23.25 | $28.00 | $265 | $40.00 | $22.00 | $6.00 | $71.30 |
| 611E97400 CONDUIT, MISC.:TYPE C FOR DRAINAGE DISCHARGE CONTI | 60 FT | $25.00 | $22.00 | $19.00 | $25.00 | $265 | $33.00 | $20.00 | $6.00 | $63.25 |
| 611E97400 CONDUIT, MISC.:TYPE E FOR DRAINAGE DISCHARGE CONTI | 60 FT | $25.00 | $22.00 | $16.50 | $25.00 | $265 | $33.00 | $20.00 | $6.00 | $63.25 |
| 611E97400 CONDUIT, MISC.:TYPE F FOR DRAINAGE DISCHARGE CONTI | 60 FT | $25.00 | $24.00 | $16.50 | $25.00 | $265 | $37.00 | $20.00 | $6.00 | $63.25 |
| 611E98470 CATCH BASIN, NO. 2-2B | 19 EACH | $1,300 | $2,540 | $2,126 | $1,150 | $1,620 | $1,500 | $1,850 | $1,800 | $2,900 |
| 611E98510 CATCH BASIN, NO. 2-3 | 9 EACH | $1,500 | $2,800 | $2,215 | $1,500 | $1,725 | $2,000 | $2,400 | $2,600 | $3,002 |
| 611E98700 INLET, SIDE DITCH | 1 EACH | $1,300 | $1,500 | $1,040 | $1,200 | $1,570 | $1,900 | $1,400 | $2,000 | $3,010 |
| 611E99720 INSPECTION WELL | 12 EACH | $150 | $1,200 | $297 | $550 | $650 | $1,900 | $700 | $1,100 | $2,156 |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN, V | 4,073 SY | $2.50 | $4.00 | $2.00 | $3.25 | $2.50 | $3.25 | $2.85 | $3.00 | $4.20 |
| 407E10000 TACK COAT | 7,955 GAL | $3.00 | $2.00 | $2.00 | $2.00 | $3.00 | $3.00 | $1.80 | $2.00 | $3.00 |
| 424E12000 FINE GRADED POLYMER ASPHALT CONCRETE, TYPE B | 566 CY | $139 | $226 | $183 | $190 | $170 | $205 | $205 | $197 | $185 |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 270 CY | $170 | $178 | $178 | $185 | $170 | $198 | $200 | $195 | $178 |
| 441E50301 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (113 CY | $150 | $186 | $173 | $158 | $150 | $184 | $230 | $265 | $200 |
| 441E50400 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448) | — | $250 | $351 | $406 | $300 | $250 | $210 | $600 | $437 | $300 |
| 617E10100 COMPACTED AGGREGATE | 797 CY | $70.00 | $75.00 | $45.75 | $33.00 | $50.00 | $80.00 | $70.00 | $50.00 | $80.00 |
| 625E10490 LIGHT POLE, CONVENTIONAL, 20', AT-C TRANSFORMER BA | 1 EACH | $2,500 | $3,000 | $2,431 | $2,900 | $2,500 | $2,600 | $2,500 | $2,800 | $2,395 |
| 625E14101 LIGHT POLE FOUNDATION, 24" X 8' DEEP, AS PER PLAN | 1 EACH | $1,200 | $2,200 | $1,157 | $2,100 | $1,200 | $1,280 | $1,200 | $1,325 | $1,140 |
| 625E18510 BRACKET ARM, 30' | 1 EACH | $1,100 | $1,300 | $1,315 | $1,200 | $1,100 | $1,400 | $1,100 | $1,500 | $1,295 |
| 625E25301 CONDUIT, 1-1/2", 725.04, AS PER PLAN | 135 FT | $12.00 | $15.00 | $12.25 | $15.00 | $12.00 | $13.00 | $12.00 | $14.00 | $12.00 |
| 625E25400 CONDUIT, 2", 725.04 | 1,865 FT | $14.00 | $17.00 | $14.00 | $15.00 | $14.00 | $15.00 | $14.00 | $16.00 | $13.75 |
| 625E25500 CONDUIT, 3", 725.04 | 160 FT | $18.00 | $30.00 | $23.25 | $28.00 | $18.00 | $25.00 | $18.00 | $27.00 | $23.00 |
| 625E25906 CONDUIT, JACKED OR DRILLED, 725.051, 3" | 25 FT | $45.00 | $40.00 | $43.75 | $38.00 | $45.00 | $50.00 | $45.00 | $50.00 | $43.00 |
| 625E25906 CONDUIT, JACKED OR DRILLED, 725.051, 4" | 350 FT | $48.00 | $44.00 | $51.75 | $40.00 | $48.00 | $55.00 | $48.00 | $60.00 | $51.00 |
| 625E29000 TRENCH | 2,090 FT | $12.00 | $13.00 | $10.50 | $12.00 | $12.00 | $11.00 | $12.00 | $12.00 | $10.25 |
| 625E29400 TRENCH IN PAVED AREA | 40 FT | $45.00 | $30.00 | $30.75 | $28.00 | $45.00 | $33.00 | $45.00 | $35.00 | $30.25 |
| 625E30700 PULL BOX, 725.08, 18" | 12 EACH | $750 | $820 | $848 | $775 | $750 | $900 | $750 | $970 | $835 |
| 625E30701 PULL BOX, 725.08, 18", AS PER PLAN | 5 EACH | $1,200 | $1,000 | $817 | $950 | $1,200 | $860 | $1,200 | $935 | $805 |
| 625E30706 PULL BOX, 725.08, 24" | 1 EACH | $850 | $1,100 | $919 | $1,010 | $850 | $975 | $850 | $1,050 | $905 |
| 625E32000 GROUND ROD | 124 EACH | $200 | $280 | $269 | $260 | $200 | $300 | $200 | $308 | $265 |
| 625E36010 UNDERGROUND WARNING/MARKING TAPE | 2,130 FT | $1.00 | $0.30 | $0.50 | $0.30 | $1.00 | $0.50 | $1.00 | $0.50 | $0.41 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 170 FT | $6.60 | $10.00 | $10.25 | $6.60 | $6.00 | $7.00 | $6.00 | $8.00 | $60.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 2,834 FT | $7.20 | $11.00 | $11.50 | $7.20 | $7.00 | $8.00 | $7.00 | $8.00 | $7.00 |
| 630E04100 GROUND MOUNTED SUPPORT, NO. 4 POST | 1,645 FT | $8.80 | $13.00 | $130 | $8.75 | $8.00 | $8.50 | $8.00 | $10.00 | $8.00 |
| 630E08600 SIGN POST REFLECTOR | 309 EACH | $50.30 | $48.00 | $46.50 | $50.30 | $20.00 | $21.00 | $20.00 | $55.00 | $20.00 |
| 630E79101 SIGN HANGER ASSEMBLY, MAST ARM, AS PER PLAN | 4 EACH | $235 | $460 | $492 | $325 | $235 | $247 | $235 | $355 | $235 |
| 630E80100 SIGN, FLAT SHEET | 1,675 SF | $16.50 | $15.00 | $15.50 | $16.50 | $12.00 | $13.00 | $12.00 | $18.00 | $12.00 |
| 630E80510 SIGN, STREET NAME | 2 EACH | $172 | $240 | $254 | $172 | $145 | $152 | $145 | $188 | $145 |
| 630E83000 COVERING OF SIGN | 85 SF | $16.10 | $6.00 | $7.25 | $15.00 | $5.00 | $6.00 | $5.00 | $18.00 | $5.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 34 EACH | $33.75 | $10.00 | $10.25 | $32.00 | $25.00 | $27.00 | $25.00 | $37.00 | $25.00 |
| 630E85000 REMOVAL OF GROUND MOUNTED SIGN AND STORAGE | 2 EACH | $61.35 | $15.00 | $20.75 | $60.00 | $30.00 | $32.00 | $30.00 | $67.00 | $30.00 |
| 630E85001 REMOVAL OF GROUND MOUNTED SIGN AND STORAGE, AS PER | 163 EACH | $63.10 | $15.00 | $169 | $63.10 | $30.00 | $32.00 | $30.00 | $69.00 | $30.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 129 EACH | $63.75 | $90.00 | $88.00 | $63.75 | $45.00 | $47.00 | $45.00 | $70.00 | $45.00 |
| 630E85101 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION, AS | 1 EACH | $245 | $143 | $135 | $245 | $325 | $350 | $325 | $269 | $325 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 88 EACH | $42.65 | $15.00 | $15.50 | $42.65 | $30.00 | $32.00 | $30.00 | $47.00 | $30.00 |
| 630E86006 REMOVAL OF GROUND MOUNTED POST SUPPORT AND STORAGE | 176 EACH | $63.65 | $20.00 | $26.00 | $63.65 | $35.00 | $32.00 | $35.00 | $70.00 | $35.00 |
| 630E97700 SIGNING, MISC.: REMOVAL AND REERECTION OF SIGN FLA | 16 EACH | $1,200 | $582 | $1,850 | $950 | $1,200 | $3,000 | $1,200 | $3,185 | $2,745 |
| 631E92001 SIGN FLASHER ASSEMBLY, AS PER PLAN (ABWDS) | 10 EACH | $4,300 | $3,300 | $2,450 | $3,000 | $4,300 | $2,500 | $4,300 | $2,668 | $2,300 |
| 631E92001 SIGN FLASHER ASSEMBLY, AS PER PLAN (ICWS, BURTON-W | 2 EACH | $3,500 | $1,400 | $902 | $1,300 | $3,500 | $1,100 | $3,500 | $1,143 | $985 |
| 631E92001 SIGN FLASHER ASSEMBLY, AS PER PLAN (ICWS, SR 608) | 2 EACH | $3,500 | $2,300 | $1,960 | $2,150 | $3,500 | $2,100 | $3,500 | $2,222 | $1,915 |
| 631E92001 SIGN FLASHER ASSEMBLY, AS PER PLAN, SOLAR POWERED | 5 EACH | $3,200 | $3,400 | $2,425 | $3,200 | $3,200 | $2,700 | $3,200 | $2,871 | $2,475 |
| 631E93301 TIMER WITH ENCLOSURE, AS PER PLAN (ABWDS) | 9 EACH | $9,500 | $10,600 | $10,099 | $9,800 | $9,500 | $10,700 | $9,500 | $11,597 | $9,995 |
| 644E00100 EDGE LINE, 4" | 8.1 MILE | $2,500 | $2,200 | $2,116 | $2,325 | $2,400 | $2,200 | $2,400 | $2,700 | $2,400 |
| 644E00104 EDGE LINE, 6" | 2.22 MILE | $3,200 | $3,200 | $2,984 | $2,580 | $2,800 | $3,100 | $2,800 | $3,100 | $2,800 |
| 644E00300 CENTER LINE, 4" | 5.08 MILE | $4,985 | $3,800 | $3,659 | $4,343 | $5,200 | $3,800 | $5,200 | $5,700 | $5,200 |
| 644E00500 STOP LINE, 24" | 175 FT | $5.80 | $11.00 | $10.00 | $15.00 | $5.75 | $10.00 | $5.75 | $7.00 | $5.75 |
| 644E00600 CROSSWALK LINE, 12" | 160 FT | $4.50 | $9.00 | $8.00 | $10.00 | $3.00 | $8.50 | $3.00 | $3.50 | $6.00 |
| 644E30000 REMOVAL OF PAVEMENT MARKING | 5,780 FT | $1.29 | $1.00 | $0.75 | $1.29 | $0.65 | $0.75 | $0.65 | $1.00 | $0.65 |
| 608E15000 8" CONCRETE WALK | 275 SF | $21.00 | $34.00 | $19.00 | $30.00 | $8.00 | $21.00 | $13.00 | $17.00 | $18.50 |
| 608E53020 DETECTABLE WARNING | 118 SF | $15.00 | $49.00 | $45.75 | $13.50 | $24.00 | $45.00 | $18.00 | $18.00 | $45.00 |
| 632E05007 VEHICULAR SIGNAL HEAD, (LED), 3-SECTION, 12" LENS, | 8 EACH | $600 | $1,100 | $605 | $1,000 | $600 | $700 | $600 | $749 | $645 |
| 632E20731 PEDESTRIAN SIGNAL HEAD (LED), TYPE D2, COUNTDOWN, | 4 EACH | $475 | $640 | $370 | $600 | $475 | $500 | $475 | $401 | $345 |
| 632E25000 COVERING OF VEHICULAR SIGNAL HEAD | 8 EACH | $40.00 | $40.00 | $40.00 | $40.00 | $40.00 | $40.00 | $40.00 | $41.00 | $35.00 |
| 632E25010 COVERING OF PEDESTRIAN SIGNAL HEAD | 4 EACH | $40.00 | $32.00 | $34.00 | $30.00 | $40.00 | $30.00 | $40.00 | $33.00 | $28.00 |
| 632E26000 PEDESTRIAN PUSHBUTTON | 4 EACH | $125 | $240 | $223 | $235 | $125 | $235 | $125 | $256 | $220 |
| 632E40300 SIGNAL CABLE, 3 CONDUCTOR, NO. 14 AWG | 1,740 FT | $1.65 | $3.00 | $1.71 | $2.40 | $1.65 | $2.00 | $1.65 | $2.00 | $1.70 |
| 632E40400 SIGNAL CABLE, 4 CONDUCTOR, NO. 14 AWG | 1,180 FT | $1.95 | $3.00 | $2.00 | $2.50 | $1.95 | $2.00 | $1.95 | $2.00 | $1.75 |
| 632E40500 SIGNAL CABLE, 5 CONDUCTOR, NO. 14 AWG | 420 FT | $1.95 | $3.00 | $2.10 | $2.60 | $1.95 | $2.00 | $1.95 | $2.20 | $1.85 |
| 632E40700 SIGNAL CABLE, 7 CONDUCTOR, NO. 14 AWG | 610 FT | $2.25 | $3.00 | $1.95 | $2.80 | $2.25 | $2.50 | $2.25 | $3.00 | $1.95 |
| 632E64010 SIGNAL SUPPORT FOUNDATION | 3 EACH | $4,800 | $8,400 | $4,400 | $7,800 | $4,800 | $5,000 | $4,800 | $5,395 | $4,650 |
| 632E64011 SIGNAL SUPPORT FOUNDATION, AS PER PLAN | 1 EACH | $5,300 | $8,400 | $4,695 | $7,800 | $5,300 | $5,000 | $5,300 | $5,366 | $4,625 |
| 632E64020 PEDESTAL FOUNDATION | 4 EACH | $700 | $950 | $802 | $900 | $700 | $900 | $700 | $917 | $790 |
| 632E64021 PEDESTAL FOUNDATION, AS PER PLAN | 113 EACH | $800 | $1,220 | $800 | $1,125 | $800 | $820 | $800 | $888 | $765 |
| 632E68200 POWER CABLE, 2 CONDUCTOR, NO. 6 AWG | 80 FT | $3.00 | $4.00 | $3.60 | $3.40 | $3.00 | $4.00 | $3.00 | $5.00 | $3.55 |
| 632E68300 POWER CABLE, 3 CONDUCTOR, NO. 6 AWG | 580 FT | $4.00 | $4.00 | $4.75 | $4.00 | $4.00 | $5.00 | $4.00 | $6.00 | $4.75 |
| 632E69800 SERVICE CABLE, 3 CONDUCTOR, NO. 6 AWG | 3,550 FT | $4.00 | $4.00 | $4.25 | $4.30 | $4.00 | $5.00 | $4.00 | $5.00 | $4.25 |
| 632E70001 POWER SERVICE, AS PER PLAN | 11 EACH | $1,800 | $2,000 | $2,950 | $1,900 | $1,800 | $3,200 | $1,800 | $4,235 | $3,650 |
| 632E72100 SIGNAL SUPPORT, TYPE TC-81.22, DESIGN 2 | 1 EACH | $7,100 | $5,500 | $7,900 | $5,200 | $7,100 | $8,400 | $7,100 | $9,195 | $7,925 |
| 632E72110 SIGNAL SUPPORT, TYPE TC-81.22, DESIGN 4 | 1 EACH | $8,800 | $7,800 | $7,200 | $7,300 | $8,800 | $7,600 | $8,800 | $8,220 | $7,085 |
| 632E72130 SIGNAL SUPPORT, TYPE TC-81.22, DESIGN 12 | 2 EACH | $9,300 | $11,000 | $10,450 | $10,000 | $9,300 | $10,600 | $9,300 | $11,736 | $10,115 |
| 632E72901 SIGNAL SUPPORT, MECHANICAL DAMPER FOR TC-81.22 MAS | 2 EACH | $550 | $1,000 | $450 | $950 | $550 | $500 | $550 | $475 | $410 |
| 632E89802 PEDESTAL, 5', TRANSFORMER BASE | 4 EACH | $825 | $530 | $650 | $500 | $825 | $700 | $825 | $731 | $630 |
| 633E65523 CABINET, TYPE 332L, AS PER PLAN (SR 608) | 1 EACH | $10,500 | $11,500 | $8,831 | $10,900 | $10,500 | $9,300 | $10,500 | $10,095 | $8,700 |
| 633E65523 CABINET, TYPE 332L, AS PER PLAN (SR 87) | 1 EACH | $10,500 | $11,500 | $8,831 | $10,900 | $10,500 | $10,000 | $10,500 | $10,095 | $8,700 |
| 633E67101 CABINET FOUNDATION, AS PER PLAN | 2 EACH | $2,800 | $2,900 | $2,056 | $2,700 | $2,800 | $2,200 | $2,800 | $2,350 | $2,025 |
| 633E67200 CONTROLLER WORK PAD | 2 EACH | $700 | $530 | $553 | $500 | $700 | $600 | $700 | $635 | $545 |
| 633E68511 COMMUNICATIONS, AS PER PLAN | 1 EACH | $3,500 | $2,000 | $1,929 | $1,933 | $3,500 | $2,100 | $3,500 | $2,205 | $1,900 |
| 633E75001 UNINTERRUPTIBLE POWER SUPPLY (UPS), 1000 WATT, AS | 2 EACH | $6,500 | $6,000 | $5,177 | $5,600 | $6,500 | $5,500 | $6,500 | $6,033 | $5,200 |
| 809E69000 ADVANCE RADAR DETECTION | 4 EACH | $7,500 | $8,500 | $7,400 | $8,000 | $7,500 | $8,000 | $7,500 | $8,597 | $7,410 |
| 809E69100 STOP LINE RADAR DETECTION | 14 EACH | $6,500 | $8,400 | $7,150 | $7,825 | $6,500 | $7,500 | $6,500 | $8,200 | $6,985 |
| 809E69123 ATC V6.24 CONTROLLER, AS PER PLAN (SR 608) | 1 EACH | $7,500 | $5,800 | $6,075 | $5,500 | $7,500 | $6,500 | $7,500 | $7,000 | $5,985 |
| 809E69123 ATC V6.24 CONTROLLER, AS PER PLAN (SR 87) | 1 EACH | $7,000 | $5,500 | $5,253 | $5,200 | $7,000 | $5,500 | $7,000 | $6,000 | $5,175 |
| 666E09000 PRUNING EXISTING TREE, 3 TO 8-INCH DIAMETER | 35 EACH | $200 | $200 | $203 | $185 | $200 | $210 | $185 | $220 | $200 |
| 666E10000 PRUNING EXISTING TREE, 8 TO 16-INCH DIAMETER | 60 EACH | $300 | $320 | $305 | $280 | $300 | $315 | $280 | $330 | $300 |
| 666E10010 PRUNING EXISTING TREE, 16 TO 24-INCH DIAMETER | 38 EACH | $400 | $425 | $406 | $380 | $410 | $420 | $380 | $440 | $400 |
| 666E10020 PRUNING EXISTING TREE, 24 TO 36-INCH DIAMETER | 15 EACH | $500 | $530 | $508 | $475 | $510 | $525 | $475 | $550 | $500 |
| 666E10030 PRUNING EXISTING TREE, 36 INCH DIAMETER AND OVER | 6 EACH | $800 | $850 | $812 | $770 | $800 | $850 | $770 | $880 | $800 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $6,500 | $5,500 | $9,483 | $5,000 | $10,000 | $15,000 | $1,500 | $7,800 | $22,425 |
| 503E21300 UNCLASSIFIED EXCAVATION (WINGWALL FOOTING) | 1 LS | $6,500 | $7,500 | $2,561 | $3,000 | $1,500 | $10,000 | $3,200 | $2,700 | $5,014 |
| 509E10000 EPOXY COATED REINFORCING STEEL | 3,253 LB | $1.70 | $2.00 | $2.25 | $1.25 | $1.75 | $2.00 | $2.00 | $1.75 | $1.85 |
| 511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 8 CY | $1,550 | $1,900 | $2,140 | $900 | $935 | $3,300 | $1,400 | $2,100 | $2,093 |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 28 CY | $485 | $700 | $526 | $900 | $375 | $850 | $625 | $491 | $840 |
| 511E46610 CLASS QC1 CONCRETE, HEADWALL | 3 CY | $300 | $320 | $820 | $900 | $1,130 | $1,250 | $375 | $347 | $2,100 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 41 SY | $30.00 | $35.00 | $25.75 | $40.00 | $28.00 | $90.00 | $15.00 | $28.00 | $64.00 |
| 512E33000 TYPE 2 WATERPROOFING | 149 SY | $15.42 | $26.00 | $20.50 | $35.00 | $26.00 | $50.00 | $14.00 | $40.00 | $63.25 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 27 SF | $8.00 | $14.00 | $8.50 | $1.00 | $8.00 | $10.00 | $7.00 | $5.00 | $10.35 |
| 518E21230 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 1 LS | $3,000 | $4,900 | $2,427 | $7,000 | $1,000 | $5,000 | $2,350 | $2,550 | $1,811 |
| 614E11111 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 80 HOUR | $75.00 | $68.00 | $66.00 | $65.00 | $65.00 | $70.00 | $60.00 | $76.00 | $75.00 |
| 614E12420 DETOUR SIGNING | 1 LS | $20,000 | $7,200 | $8,932 | $20,000 | $11,600 | $7,500 | $25,000 | $55,000 | $11,600 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 36 SNMT | $650 | $875 | $650 | $650 | $500 | $600 | $500 | $700 | $950 |
| 616E10000 WATER | 74 MGAL | $1.00 | $30.00 | $24.50 | $5.00 | $5.00 | $100 | $80.00 | $0.50 | $10.00 |
| 690E98900 SPECIAL - DUST CONTROL (STABILIZATION) | 26,150 GAL | $5.00 | $2.00 | $2.50 | $2.00 | $5.00 | $1.75 | $0.95 | $1.95 | $3.70 |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $95,000 | $25,000 | $28,000 | $55,000 | $124,000 | $55,000 | $25,000 | $27,000 | $71,400 |
| 202E20010 HEADWALL REMOVED | 6 EACH | $200 | $200 | $1,126 | $365 | $75.00 | $250 | $400 | $325 | $334 |
| 202E23000 PAVEMENT REMOVED | 5,704 SY | $11.00 | $10.00 | $6.25 | $8.75 | $12.00 | $16.00 | $7.00 | $5.00 | $15.20 |
| 202E30000 WALK REMOVED | 59 SF | $5.00 | $3.00 | $3.50 | $2.00 | $2.00 | $10.00 | $1.50 | $2.00 | $5.50 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 1,377 FT | $10.00 | $20.00 | $10.25 | $9.25 | $18.00 | $16.00 | $21.00 | $5.00 | $22.00 |
| 202E75000 FENCE REMOVED | 1,703 FT | $3.00 | $3.00 | $2.50 | $3.00 | $3.00 | $6.00 | $3.00 | $6.00 | $2.20 |
| 202E75250 GATE REMOVED | 3 EACH | $320 | $300 | $343 | $320 | $320 | $550 | $320 | $125 | $110 |
| 202E98100 REMOVAL MISC.: 24" ROCK AND OVER | 20 EACH | $50.00 | $40.00 | $35.75 | $30.00 | $25.00 | $190 | $50.00 | $65.00 | $50.00 |
| 202E98100 REMOVAL MISC.: 6" STEEL BOLLARD | 5 EACH | $50.00 | $48.00 | $122 | $45.00 | $25.00 | $110 | $200 | $42.00 | $100 |
| 202E98100 REMOVAL MISC.: CLEANOUT | 1 EACH | $150 | $265 | $254 | $85.00 | $100 | $220 | $150 | $14.00 | $100 |
| 202E98100 REMOVAL MISC.: LIGHTS | 2 EACH | $50.00 | $130 | $103 | $600 | $15.00 | $220 | $100 | $97.00 | $100 |
| 202E98100 REMOVAL MISC.: STONE HEADWALL | 2 EACH | $100 | $170 | $168 | $80.00 | $10.00 | $500 | $325 | $320 | $250 |
| 202E98100 REMOVAL MISC.: WOOD POST | 3 EACH | $50.00 | $88.00 | $102 | $35.00 | $10.00 | $50.00 | $90.00 | $65.00 | $25.00 |
| 202E98200 REMOVAL MISC.: 24" STONE WALLS WITH LIGHT FIXTURES | 16 FT | $50.00 | $65.00 | $41.75 | $75.00 | $30.00 | $200 | $40.00 | $41.00 | $100 |
| 202E98200 REMOVAL MISC.: RAILROAD TIES | 54 FT | $2.00 | $12.00 | $35.00 | $4.00 | $5.00 | $50.00 | $7.00 | $4.00 | $7.15 |
| 202E98400 REMOVAL MISC.: FOOT BRIDGE | 20 SF | $10.00 | $17.00 | $13.50 | $5.50 | $10.00 | $30.00 | $10.00 | $7.00 | $41.25 |
| 202E98400 REMOVAL MISC.: WOOD BRIDGE | 11 SF | $20.00 | $25.00 | $12.25 | $10.00 | $20.00 | $30.00 | $15.00 | $10.00 | $41.25 |
| 203E20000 EMBANKMENT | 1,920 CY | $18.00 | $13.00 | $18.00 | $18.00 | $8.00 | $10.00 | $5.00 | $20.00 | $12.75 |
| 204E10000 SUBGRADE COMPACTION | 17,348 SY | $1.25 | $2.00 | $1.25 | $0.65 | $1.25 | $1.00 | $1.75 | $1.00 | $1.50 |
| 204E13000 EXCAVATION OF SUBGRADE | 100 CY | $15.00 | $26.00 | $17.25 | $10.00 | $14.00 | $14.00 | $19.00 | $17.00 | $50.00 |
| 204E30010 GRANULAR MATERIAL, TYPE B | 100 CY | $40.00 | $58.00 | $50.75 | $40.00 | $50.00 | $80.00 | $55.00 | $47.00 | $100 |
| 204E45000 PROOF ROLLING | 8 HOUR | $85.00 | $190 | $206 | $155 | $100 | $100 | $160 | $160 | $100 |
| 209E60201 LINEAR GRADING, AS PER PLAN | 4 STA | $1,250 | $300 | $859 | $445 | $300 | $800 | $110 | $1,250 | $475 |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 400 FT | $18.20 | $19.00 | $19.75 | $18.80 | $19.00 | $20.00 | $18.20 | $18.00 | $18.80 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (NCHRP 350) | 3 EACH | $2,280 | $2,400 | $2,431 | $2,380 | $2,380 | $2,500 | $2,280 | $2,500 | $2,380 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 5 EACH | $975 | $1,000 | $990 | $975 | $975 | $1,025 | $975 | $1,200 | $975 |
| 608E10000 4" CONCRETE WALK | 88 SF | $25.00 | $14.00 | $12.25 | $12.00 | $8.00 | $40.00 | $18.00 | $10.00 | $40.00 |
| 623E12000 PRIMARY PROJECT CONTROL MONUMENT, TYPE A | 22 EACH | $404 | $235 | $449 | $325 | $1,000 | $335 | $250 | $350 | $850 |
| 623E40000 MONUMENT ASSEMBLY REMOVED AND RESET | 32 EACH | $320 | $420 | $504 | $400 | $850 | $650 | $250 | $1,490 | $1,000 |
| 690E50100 SPECIAL - MAILBOX SUPPORT SYSTEM, SINGLE | 22 EACH | $145 | $150 | $173 | $165 | $125 | $200 | $200 | $168 | $165 |
| 690E50200 SPECIAL - MAILBOX SUPPORT SYSTEM, DOUBLE | 2 EACH | $265 | $280 | $199 | $280 | $175 | $250 | $300 | $351 | $280 |
| 690E50300 SPECIAL - MAILBOX SUPPORT SYSTEM, MULTIPLE | 1 EACH | $385 | $400 | $281 | $395 | $300 | $400 | $400 | $1,170 | $395 |
| 601E32210 ROCK CHANNEL PROTECTION, TYPE C WITH AGGREGATE FIL | 59 CY | $126 | $170 | $99.00 | $185 | $160 | $170 | $180 | $202 | $330 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $25.00 | $80.00 | $60.00 | $250 | $200 | $300 | $500 | $55.00 | $200 |
| 659E00300 TOPSOIL | 2,483 CY | $20.00 | $13.00 | $26.50 | $12.50 | $26.00 | $20.00 | $8.00 | $36.50 | $28.05 |
| 659E10000 SEEDING AND MULCHING | 22,370 SY | $0.90 | $0.80 | $1.00 | $0.63 | $0.85 | $2.00 | $0.79 | $1.00 | $3.30 |
| 659E14000 REPAIR SEEDING AND MULCHING | 1,119 SY | $0.50 | $0.40 | $1.00 | $0.75 | $0.45 | $1.00 | $0.38 | $1.00 | $3.00 |
| 659E15000 INTER-SEEDING | 1,119 SY | $0.50 | $0.40 | $0.01 | $1.00 | $0.45 | $1.00 | $0.38 | $1.00 | $3.00 |
| 659E20000 COMMERCIAL FERTILIZER | 3.12 TON | $200 | $1,500 | $254 | $800 | $1,620 | $1,000 | $1,500 | $1,659 | $500 |
| 659E31000 LIME | 4.62 ACRE | $50.00 | $290 | $50.75 | $1.00 | $300 | $500 | $277 | $310 | $200 |
| 659E35000 WATER | 124 MGAL | $1.00 | $2.00 | $0.25 | $1.00 | $2.70 | $60.00 | $2.50 | $0.50 | $1.00 |
| 659E40000 MOWING | 50 MSF | $1.00 | $5.00 | $1.00 | $1.00 | $2.70 | $95.00 | $40.00 | $36.00 | $1.00 |
| 670E00700 DITCH EROSION PROTECTION | 3,034 SY | $2.50 | $2.00 | $1.50 | $2.50 | $2.70 | $3.00 | $2.50 | $2.75 | $3.25 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $2,000 | $1,900 | $2,944 | $2,000 | $2,000 | $1,500 | $1,850 | $3,210 | $1,945 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $10,000 | $3,500 | $4,568 | $15,000 | $3,600 | $6,500 | $4,800 | $3,370 | $3,335 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $6,000 | $5,000 | $3,678 | $5,500 | $5,000 | $4,300 | $5,000 | $2,230 | $5,250 |
| 832E30000 EROSION CONTROL | 108,327 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 836E10000 SEEDING AND EROSION CONTROL WITH TURF REINFORCING | 1,220 SY | $5.00 | $2.00 | $4.00 | $8.00 | $2.70 | $5.00 | $2.50 | $2.75 | $6.75 |
| 836E10020 SEEDING AND EROSION CONTROL WITH TURF REINFORCING | 12 SY | $50.00 | $2.00 | $8.00 | $8.00 | $18.50 | $6.00 | $17.00 | $19.00 | $6.75 |
| 836E10030 SEEDING AND EROSION CONTROL WITH TURF REINFORCING | 35 SY | $20.00 | $15.00 | $15.25 | $8.00 | $17.00 | $7.00 | $15.00 | $16.60 | $6.75 |
| 602E20000 CONCRETE MASONRY | 2.3 CY | $3,250 | $3,300 | $2,054 | $1,475 | $1,500 | $4,200 | $2,800 | $3,950 | $5,000 |
| 605E31100 AGGREGATE DRAINS | 1,410 FT | $11.00 | $10.00 | $7.50 | $6.00 | $11.00 | $15.00 | $10.00 | $12.50 | $15.00 |
| 611E00200 4" CONDUIT, TYPE C | 155 FT | $12.00 | $23.00 | $19.75 | $15.00 | $25.00 | $35.00 | $24.00 | $10.00 | $29.10 |
| 611E01100 6" CONDUIT, TYPE C | 114 FT | $12.00 | $30.00 | $20.75 | $22.00 | $30.00 | $36.00 | $19.00 | $11.00 | $41.75 |
| 611E01400 6" CONDUIT, TYPE E | 100 FT | $12.00 | $30.00 | $16.25 | $22.00 | $16.00 | $38.00 | $19.00 | $35.00 | $42.75 |
| 611E04900 12" CONDUIT, TYPE D | 799 FT | $48.00 | $38.00 | $41.75 | $48.00 | $55.00 | $57.00 | $53.00 | $50.00 | $35.65 |
| 611E06400 15" CONDUIT, TYPE D | 616 FT | $57.00 | $37.00 | $44.50 | $60.00 | $85.00 | $65.00 | $61.00 | $54.00 | $39.10 |
| 611E07900 18" CONDUIT, TYPE D | 372 FT | $65.00 | $40.00 | $48.50 | $72.00 | $90.00 | $80.00 | $72.00 | $54.00 | $39.10 |
| 611E08700 21" CONDUIT, TYPE A | 65 FT | $125 | $100 | $90.00 | $152 | $225 | $115 | $167 | $150 | $129 |
| 611E10900 24" CONDUIT, TYPE D | 130 FT | $76.00 | $50.00 | $63.50 | $90.00 | $100 | $100 | $82.00 | $96.00 | $49.70 |
| 611E11700 27" CONDUIT, TYPE A | 39 FT | $176 | $170 | $153 | $225 | $210 | $160 | $220 | $190 | $173 |
| 611E52200 14" X 23" CONDUIT, TYPE A, 706.04 | 62 FT | $150 | $165 | $121 | $200 | $375 | $180 | $190 | $175 | $201 |
| 611E94800 8' X 4' CONDUIT, TYPE A, 706.05 | 54 FT | $575 | $1,200 | $639 | $475 | $1,445 | $850 | $1,000 | $996 | $1,050 |
| 611E98510 CATCH BASIN, NO. 2-3 | 1 EACH | $1,500 | $2,300 | $2,249 | $1,500 | $1,730 | $1,950 | $2,400 | $2,600 | $3,070 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 25 EACH | $185 | $270 | $193 | $280 | $150 | $350 | $300 | $105 | $748 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1-1/2" | 10,159 SY | $1.25 | $3.00 | $1.00 | $1.50 | $1.25 | $2.25 | $1.50 | $1.00 | $1.85 |
| 407E20000 NON-TRACKING TACK COAT | 2,660 GAL | $3.00 | $3.00 | $2.00 | $2.25 | $3.00 | $4.25 | $1.80 | $2.00 | $3.00 |
| 408E10000 PRIME COAT | 170 GAL | $4.00 | $3.00 | $3.00 | $5.00 | $4.00 | $4.25 | $6.50 | $3.00 | $9.00 |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 950 CY | $150 | $191 | $147 | $170 | $153 | $184 | $185 | $170 | $180 |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (645 CY | $131 | $136 | $122 | $148 | $132 | $150 | $165 | $140 | $180 |
| 441E50701 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (11 CY | $400 | $560 | $457 | $300 | $400 | $370 | $960 | $500 | $450 |
| 452E10010 6" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 100 SY | $80.00 | $100 | $60.00 | $75.00 | $65.00 | $82.00 | $84.00 | $50.00 | $125 |
| 452E12010 8" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 189 SY | $85.00 | $120 | $71.75 | $85.00 | $83.00 | $90.00 | $85.00 | $66.00 | $130 |
| 609E26000 CURB, TYPE 6 | 237 FT | $42.50 | $40.00 | $37.00 | $35.00 | $41.00 | $25.00 | $27.00 | $18.00 | $45.00 |
| 618E43000 RUMBLE STRIPES, CENTER LINE (ASPHALT CONCRETE) | 0.96 MILE | $5,000 | $6,000 | $6,344 | $6,250 | $15,000 | $6,600 | $5,000 | $6,900 | $10,000 |
| 621E00100 RPM | 65 EACH | $52.00 | $50.00 | $52.50 | $80.00 | $69.00 | $85.00 | $68.50 | $88.50 | $97.00 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 60 EACH | $5.45 | $10.00 | $7.75 | $2.00 | $10.00 | $25.00 | $10.00 | $6.00 | $10.00 |
| 874E20000 LONGITUDINAL JOINT PREPARATION | 5,090 FT | $1.25 | $3.00 | $0.50 | $1.15 | $1.25 | $0.25 | $2.25 | $1.00 | $2.35 |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 91 CY | $255 | $350 | $432 | $275 | $255 | $263 | $600 | $453 | $400 |
| 626E00102 BARRIER REFLECTOR, TYPE 1 (BIDIRECTIONAL) | 10 EACH | $7.20 | $8.00 | $7.25 | $7.20 | $7.20 | $100 | $7.20 | $3.00 | $15.00 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 154 FT | $6.20 | $10.00 | $10.25 | $6.20 | $6.00 | $8.00 | $6.00 | $7.00 | $6.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 184 FT | $7.85 | $11.00 | $11.50 | $7.85 | $7.00 | $8.00 | $7.00 | $9.00 | $7.00 |
| 630E08520 STREET NAME SIGN SUPPORT, NO. 3 POST | 10.5 FT | $13.25 | $11.00 | $12.50 | $13.25 | $8.00 | $8.50 | $8.00 | $15.00 | $8.00 |
| 630E08600 SIGN POST REFLECTOR | 1 EACH | $105 | $48.00 | $46.50 | $105 | $20.00 | $22.00 | $20.00 | $115 | $20.00 |
| 630E80100 SIGN, FLAT SHEET | 158.75 SF | $19.20 | $13.00 | $15.50 | $19.20 | $12.00 | $13.00 | $12.00 | $21.00 | $12.00 |
| 630E80500 SIGN, DOUBLE FACED, STREET NAME | 1 EACH | $191 | $240 | $254 | $191 | $145 | $155 | $145 | $209 | $145 |
| 630E80510 SIGN, STREET NAME | 2 EACH | $78.60 | $240 | $295 | $78.60 | $85.00 | $90.00 | $85.00 | $86.00 | $85.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 28 EACH | $37.15 | $11.00 | $10.25 | $37.15 | $25.00 | $30.00 | $25.00 | $41.00 | $25.00 |
| 630E85001 REMOVAL OF GROUND MOUNTED SIGN AND STORAGE, AS PER | 27 EACH | $44.90 | $16.00 | $20.75 | $44.90 | $30.00 | $32.00 | $30.00 | $49.00 | $30.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 2 EACH | $86.70 | $90.00 | $88.00 | $86.70 | $45.00 | $48.00 | $45.00 | $95.00 | $45.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 25 EACH | $48.50 | $16.00 | $20.75 | $48.50 | $30.00 | $32.00 | $30.00 | $55.00 | $30.00 |
| 630E86007 REMOVAL OF GROUND MOUNTED POST SUPPORT AND STORAGE | 23 EACH | $67.80 | $48.00 | $46.50 | $67.80 | $35.00 | $37.00 | $35.00 | $74.00 | $35.00 |
| 630E86271 REMOVAL OF GROUND MOUNTED PIPE SUPPORT AND STORAGE | 2 EACH | $86.50 | $100 | $130 | $86.50 | $125 | $132 | $125 | $95.00 | $125 |
| 630E87511 REMOVAL OF POLE MOUNTED SIGN AND STORAGE, AS PER P | 8 EACH | $64.95 | $37.00 | $67.25 | $64.95 | $20.00 | $21.00 | $20.00 | $71.00 | $20.00 |
| 630E97700 SIGNING, MISC.: REMOVAL OF GROUND MOUNTED SIGN, SO | 2 EACH | $75.00 | $2,700 | $655 | $2,000 | $75.00 | $80.00 | $75.00 | $55.00 | $75.00 |
| 646E10010 EDGE LINE, 6" | 1.94 MILE | $3,300 | $4,900 | $4,705 | $3,300 | $2,400 | $4,875 | $2,400 | $2,623 | $2,400 |
| 646E10200 CENTER LINE (SOLID DOUBLE) | 0.96 MILE | $3,900 | $5,400 | $5,131 | $3,900 | $5,100 | $5,300 | $5,100 | $5,572 | $5,100 |
| 202E11000 STRUCTURE REMOVED | 1 LS | $7,500 | $4,800 | $3,612 | $7,575 | $16,000 | $9,000 | $8,200 | $5,050 | $45,155 |
| 503E21104 UNCLASSIFIED EXCAVATION, INCLUDING ROCK | 55 CY | $35.00 | $280 | $44.75 | $65.00 | $30.00 | $58.00 | $75.00 | $49.00 | $200 |
| 509E10000 EPOXY COATED REINFORCING STEEL | 2,734 LB | $1.70 | $2.00 | $2.25 | $1.25 | $1.80 | $2.00 | $2.00 | $1.75 | $2.15 |
| 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT | 20 EACH | $50.00 | $18.00 | $8.00 | $50.00 | $22.00 | $65.00 | $35.00 | $17.00 | $47.15 |
| 511E46610 CLASS QC1 CONCRETE, HEADWALL | 38 CY | $715 | $980 | $807 | $800 | $742 | $900 | $750 | $800 | $1,357 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 30 SY | $35.00 | $20.00 | $22.00 | $40.00 | $28.00 | $50.00 | $15.00 | $30.00 | $76.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 30 SF | $8.00 | $4.00 | $10.25 | $1.00 | $8.00 | $10.00 | $7.00 | $2.00 | $8.90 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 18 CY | $100 | $250 | $87.25 | $195 | $50.00 | $140 | $120 | $200 | $138 |
| 410E12000 TRAFFIC COMPACTED SURFACE, TYPE A OR B | 650 CY | $54.00 | $70.00 | $43.75 | $45.00 | $65.00 | $55.00 | $55.00 | $5.00 | $50.00 |
| 410E13000 TRAFFIC COMPACTED SURFACE, TYPE C | 100 CY | $40.00 | $108 | $49.75 | $100 | $65.00 | $55.00 | $55.00 | $5.00 | $20.00 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 120 HOUR | $65.00 | $68.00 | $66.00 | $65.00 | $65.00 | $75.00 | $60.00 | $75.00 | $75.00 |
| 614E12380 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,080 | $2,000 | $1,990 | $2,080 | $2,080 | $2,100 | $1,700 | $2,340 | $1,960 |
| 614E12421 DETOUR SIGNING, AS PER PLAN | 1 LS | $18,000 | $5,000 | $6,598 | $20,000 | $8,800 | $4,700 | $31,500 | $53,000 | $8,800 |
| 614E12500 REPLACEMENT SIGN | 10 EACH | $120 | $160 | $152 | $120 | $150 | $160 | $200 | $131 | $150 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 250 CY | $75.00 | $297 | $260 | $175 | $220 | $220 | $125 | $60.00 | $50.00 |
| 614E13310 BARRIER REFLECTOR, TYPE 1 (BIDIRECTIONAL) | 22 EACH | $20.00 | $7.00 | $7.25 | $20.00 | $8.00 | $12.00 | $10.00 | $22.00 | $8.00 |
| 614E13350 OBJECT MARKER, ONE WAY | 22 EACH | $20.00 | $13.00 | $10.25 | $20.00 | $15.00 | $14.00 | $12.00 | $22.00 | $15.00 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 24 SNMT | $650 | $800 | $650 | $650 | $500 | $600 | $500 | $710 | $950 |
| 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT | 2.87 MILE | $2,890 | $1,300 | $1,269 | $2,890 | $900 | $1,400 | $900 | $3,158 | $900 |
| 614E22100 WORK ZONE EDGE LINE, CLASS I, 4", 642 PAINT | 5.76 MILE | $1,445 | $1,000 | $685 | $1,445 | $600 | $1,100 | $600 | $1,580 | $600 |
| 614E24400 WORK ZONE DOTTED LINE, CLASS I, 4", 740.06, TYPE I | 146 FT | $3.50 | $1.00 | $8.00 | $3.50 | $3.00 | $1.50 | $2.00 | $3.90 | $3.00 |
| 614E26400 WORK ZONE STOP LINE, CLASS I, 740.06, TYPE I | 98 FT | $6.90 | $4.00 | $8.00 | $6.90 | $5.00 | $4.00 | $11.00 | $7.60 | $5.00 |
| 615E10000 ROADS FOR MAINTAINING TRAFFIC | 1 LS | $85,000 | $60,000 | $55,922 | $50,000 | $87,380 | $10,250 | $17,500 | $30,000 | $59,340 |
| 616E10000 WATER | 45 MGAL | $1.00 | $12.00 | $24.75 | $5.00 | $5.00 | $212 | $80.00 | $0.50 | $10.00 |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 1,340 FT | $15.00 | $15.00 | $23.50 | $12.25 | $75.00 | $10.00 | $15.00 | $25.34 | $22.00 |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $80,000 | $10,000 | $26,000 | $65,000 | $20,000 | $33,100 | $20,000 | $25,000 | $66,880 |
| 202E20010 HEADWALL REMOVED | 6 EACH | $250 | $200 | $338 | $365 | $75.00 | $207 | $250 | $325 | $319 |
| 202E23000 PAVEMENT REMOVED | 272 SY | $12.00 | $16.00 | $10.00 | $18.00 | $12.00 | $20.00 | $12.50 | $15.00 | $15.15 |
| 202E23010 PAVEMENT REMOVED, ASPHALT | 2,253 SY | $15.00 | $4.00 | $10.00 | $10.00 | $19.00 | $15.00 | $4.50 | $8.00 | $15.15 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 2,349 FT | $10.00 | $20.00 | $8.75 | $10.75 | $18.00 | $20.00 | $17.00 | $7.00 | $20.00 |
| 202E35200 PIPE REMOVED, OVER 24" | 248 FT | $15.00 | $8.00 | $14.25 | $10.25 | $18.00 | $25.00 | $22.00 | $10.00 | $30.00 |
| 202E38000 GUARDRAIL REMOVED | 341 FT | $2.00 | $2.00 | $2.00 | $2.10 | $2.00 | $3.00 | $2.00 | $1.60 | $2.50 |
| 202E38001 GUARDRAIL REMOVED, AS PER PLAN | 316 FT | $3.00 | $3.00 | $3.00 | $3.00 | $3.00 | $3.00 | $3.00 | $1.60 | $3.00 |
| 202E58100 CATCH BASIN REMOVED | 15 EACH | $250 | $180 | $392 | $325 | $200 | $300 | $400 | $200 | $550 |
| 202E75000 FENCE REMOVED | 2,416 FT | $2.00 | $2.00 | $2.50 | $2.00 | $2.00 | $5.50 | $2.00 | $6.00 | $2.20 |
| 202E98000 REMOVAL MISC.:RAILROAD TIES | 1 LS | $500 | $1,500 | $670 | $250 | $500 | $550 | $175 | $750 | $275 |
| 202E98000 REMOVAL MISC.:TANK | 1 LS | $1,500 | $260 | $670 | $250 | $1,000 | $725 | $150 | $300 | $1,500 |
| 202E98100 REMOVAL MISC.:COMMERCIAL SIGN | 16 EACH | $400 | $130 | $359 | $135 | $1,500 | $550 | $200 | $300 | $330 |
| 202E98100 REMOVAL MISC.:POST | 10 EACH | $200 | $65.00 | $102 | $135 | $5.00 | $140 | $130 | $50.00 | $50.00 |
| 202E98100 REMOVAL MISC.:RESIDENTIAL SIGN | 1 EACH | $200 | $90.00 | $102 | $135 | $250 | $140 | $50.00 | $103 | $250 |
| 202E98200 REMOVAL MISC.:STONE WALL | 21 FT | $40.00 | $30.00 | $63.75 | $15.00 | $20.00 | $30.00 | $10.00 | $45.75 | $10.60 |
| 203E10000 EXCAVATION | 6,136 CY | $22.00 | $18.00 | $17.25 | $28.00 | $12.00 | $16.00 | $25.00 | $22.50 | $36.95 |
| 203E20000 EMBANKMENT | 2,862 CY | $20.00 | $12.00 | $5.75 | $7.00 | $8.00 | $7.00 | $10.00 | $17.80 | $15.00 |
| 204E10000 SUBGRADE COMPACTION | 13,448 SY | $1.50 | $3.00 | $1.50 | $0.70 | $1.85 | $1.25 | $1.75 | $1.00 | $1.25 |
| 204E13000 EXCAVATION OF SUBGRADE | 2,655 CY | $19.00 | $20.00 | $16.00 | $15.00 | $12.00 | $20.00 | $13.00 | $17.00 | $20.00 |
| 204E30010 GRANULAR MATERIAL, TYPE B | 2,544 CY | $40.00 | $30.00 | $50.75 | $72.00 | $48.00 | $82.00 | $55.00 | $47.00 | $65.00 |
| 204E45000 PROOF ROLLING | 6 HOUR | $85.00 | $200 | $206 | $160 | $100 | $100 | $160 | $160 | $100 |
| 204E50000 GEOTEXTILE FABRIC | 7,392 SY | $1.50 | $0.40 | $0.75 | $1.50 | $1.25 | $2.00 | $1.50 | $0.65 | $1.25 |
| 204E51000 GEOGRID | 5,831 SY | $2.50 | $1.00 | $1.25 | $1.85 | $4.00 | $2.00 | $2.25 | $1.25 | $3.60 |
| 209E15051 RESHAPING UNDER GUARDRAIL, AS PER PLAN | 0.2 MILE | $6,000 | $20,000 | $33,218 | $14,530 | $15,000 | $15,300 | $7,500 | $15,925 | $45,375 |
| 209E60501 LINEAR GRADING, AS PER PLAN | 0.5 MILE | $4,000 | $10,000 | $28,991 | $7,200 | $20,000 | $30,000 | $2,200 | $12,740 | $20,328 |
| 209E72051 PREPARING SUBGRADE FOR SHOULDER PAVING, AS PER PLA | 0.5 MILE | $4,000 | $1,500 | $7,866 | $1,975 | $20,000 | $6,100 | $3,000 | $8,345 | $20,328 |
| 606E13000 GUARDRAIL, TYPE 5 | 712.5 FT | $17.20 | $18.00 | $18.75 | $17.20 | $17.20 | $18.00 | $17.20 | $18.00 | $17.20 |
| 606E13040 GUARDRAIL, NESTED TYPE 5 WITH TUBULAR BACKUP | 37.5 FT | $125 | $130 | $134 | $129 | $129 | $135 | $125 | $18.00 | $129 |
| 606E13041 GUARDRAIL, NESTED TYPE 5 WITH TUBULAR BACKUP, AS P | 37.5 FT | $119 | $120 | $134 | $126 | $126 | $133 | $119 | $22.00 | $126 |
| 606E15050 GUARDRAIL, TYPE MGS | 244 FT | $17.50 | $18.00 | $18.75 | $17.60 | $18.00 | $20.00 | $17.50 | $18.00 | $17.60 |
| 606E15250 GUARDRAIL, TYPE MGS QUARTER POST SPACING | 25 FT | $34.40 | $35.00 | $34.75 | $35.20 | $36.00 | $37.00 | $34.40 | $22.00 | $35.20 |
| 606E26100 ANCHOR ASSEMBLY, TYPE E | 4 EACH | $2,175 | $2,300 | $2,314 | $2,245 | $2,245 | $2,400 | $2,175 | $2,500 | $2,245 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (NCHRP 350) | 4 EACH | $2,280 | $2,000 | $2,431 | $2,380 | $2,380 | $2,500 | $2,280 | $2,700 | $2,380 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 1 EACH | $975 | $1,000 | $990 | $975 | $975 | $1,030 | $975 | $1,200 | $975 |
| 606E35140 BRIDGE TERMINAL ASSEMBLY, TYPE 4 | 4 EACH | $840 | $800 | $888 | $845 | $845 | $900 | $840 | $2,800 | $845 |
| 607E15001 FENCE, TYPE 47, AS PER PLAN | 1,908 FT | $18.47 | $19.00 | $20.50 | $18.50 | $18.50 | $20.00 | $18.00 | $22.00 | $18.50 |
| 623E38500 MONUMENT ASSEMBLY | 4 EACH | $955 | $1,100 | $990 | $995 | $850 | $350 | $575 | $1,780 | $1,000 |
| 690E50100 SPECIAL - MAILBOX SUPPORT SYSTEM, SINGLE | 7 EACH | $145 | $150 | $173 | $165 | $125 | $200 | $200 | $169 | $165 |
| 690E50200 SPECIAL - MAILBOX SUPPORT SYSTEM, DOUBLE | 1 EACH | $265 | $250 | $199 | $295 | $175 | $250 | $300 | $354 | $295 |
| 690E98300 SPECIAL - GEOCELLULAR CONFINEMENT SYSTEM | 642 SY | $32.00 | $65.00 | $25.50 | $28.00 | $115 | $34.00 | $30.00 | $28.00 | $550 |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 27.56 CY | $150 | $250 | $93.75 | $190 | $160 | $200 | $200 | $420 | $300 |
| 653E10000 TOPSOIL FURNISHED AND PLACED | 1,789 CY | $22.00 | $21.00 | $36.25 | $12.50 | $26.00 | $25.00 | $30.00 | $36.50 | $28.05 |
| 659E00510 SEEDING AND MULCHING, CLASS 2 | 16,117 SY | $1.00 | $1.00 | $1.00 | $0.63 | $1.45 | $2.50 | $1.35 | $1.50 | $3.30 |
| 659E14000 REPAIR SEEDING AND MULCHING | 806 SY | $0.50 | $0.40 | $1.00 | $0.75 | $0.45 | $2.50 | $0.39 | $0.50 | $3.00 |
| 659E20000 COMMERCIAL FERTILIZER | 2.18 TON | $600 | $1,000 | $254 | $800 | $1,620 | $1,100 | $1,500 | $1,659 | $500 |
| 659E31000 LIME | 3.33 ACRE | $250 | $250 | $50.75 | $1.00 | $300 | $600 | $277 | $307 | $200 |
| 659E35000 WATER | 87 MGAL | $1.00 | $3.00 | $0.25 | $1.00 | $3.25 | $50.00 | $3.00 | $3.35 | $1.00 |
| 670E00500 SLOPE EROSION PROTECTION | 1,733 SY | $2.50 | $2.00 | $1.50 | $2.50 | $2.70 | $2.00 | $2.50 | $2.75 | $3.25 |
| 670E00700 DITCH EROSION PROTECTION | 560 SY | $3.50 | $3.00 | $1.50 | $2.50 | $3.50 | $2.00 | $3.25 | $3.60 | $3.25 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $2,500 | $1,500 | $2,944 | $2,000 | $1,800 | $1,500 | $1,650 | $3,210 | $1,735 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $10,000 | $3,500 | $4,568 | $15,000 | $2,700 | $6,400 | $4,800 | $4,200 | $3,335 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $6,000 | $5,500 | $3,678 | $5,500 | $5,000 | $5,300 | $5,000 | $3,255 | $5,250 |
| 832E30000 EROSION CONTROL | 81,737 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 836E10000 SEEDING AND EROSION CONTROL WITH TURF REINFORCING | 1,206 SY | $5.00 | $2.00 | $4.00 | $8.00 | $2.70 | $5.00 | $2.50 | $2.80 | $6.75 |
| 836E10020 SEEDING AND EROSION CONTROL WITH TURF REINFORCING | 83 SY | $10.00 | $11.00 | $8.00 | $8.00 | $12.00 | $4.00 | $11.00 | $12.00 | $6.75 |
| 602E20000 CONCRETE MASONRY | 4.46 CY | $2,100 | $2,000 | $2,271 | $1,275 | $1,350 | $2,400 | $2,150 | $2,270 | $2,725 |
| 605E06000 4" BASE PIPE UNDERDRAINS | 4,066 FT | $9.00 | $11.00 | $7.75 | $14.85 | $9.50 | $8.00 | $12.00 | $7.40 | $20.60 |
| 605E31100 AGGREGATE DRAINS | 821 FT | $11.00 | $9.00 | $7.50 | $5.50 | $11.00 | $15.00 | $10.00 | $10.00 | $10.25 |
| 611E00300 4" CONDUIT, TYPE D | 58 FT | $12.00 | $12.00 | $23.00 | $25.00 | $16.00 | $30.00 | $25.00 | $28.00 | $32.20 |
| 611E00410 4" CONDUIT, TYPE F FOR UNDERDRAIN OUTLET | 220 FT | $12.00 | $13.00 | $15.25 | $7.75 | $16.00 | $32.00 | $25.00 | $7.00 | $20.70 |
| 611E00900 6" CONDUIT, TYPE B | 50 FT | $15.00 | $10.00 | $22.75 | $25.00 | $35.00 | $42.00 | $22.00 | $34.50 | $44.55 |
| 611E01400 6" CONDUIT, TYPE E | 50 FT | $15.00 | $10.00 | $13.75 | $25.00 | $16.00 | $41.00 | $19.00 | $34.50 | $40.85 |
| 611E01500 6" CONDUIT, TYPE F | 50 FT | $15.00 | $10.00 | $13.75 | $25.00 | $25.00 | $35.00 | $19.00 | $15.00 | $40.85 |
| 611E02000 8" CONDUIT, TYPE C | 8 FT | $25.00 | $80.00 | $26.00 | $35.00 | $40.00 | $45.00 | $50.00 | $98.00 | $57.10 |
| 611E04400 12" CONDUIT, TYPE B | 1,849 FT | $76.00 | $50.00 | $46.50 | $66.75 | $85.00 | $74.00 | $65.00 | $52.85 | $82.00 |
| 611E04900 12" CONDUIT, TYPE D | 51 FT | $48.00 | $40.00 | $43.25 | $55.00 | $55.00 | $65.00 | $55.00 | $55.00 | $32.20 |
| 611E05900 15" CONDUIT, TYPE B | 856 FT | $85.00 | $50.00 | $51.25 | $62.00 | $90.00 | $80.00 | $78.00 | $67.50 | $91.30 |
| 611E06100 15" CONDUIT, TYPE C | 149 FT | $70.00 | $50.00 | $45.25 | $62.00 | $75.00 | $61.00 | $70.00 | $62.00 | $57.15 |
| 611E06400 15" CONDUIT, TYPE D | 89 FT | $57.00 | $40.00 | $45.50 | $62.00 | $85.00 | $83.00 | $61.00 | $54.00 | $39.50 |
| 611E07400 18" CONDUIT, TYPE B | 245 FT | $94.00 | $70.00 | $56.50 | $68.00 | $140 | $101 | $78.00 | $74.00 | $101 |
| 611E07900 18" CONDUIT, TYPE D | 82 FT | $65.00 | $50.00 | $49.75 | $68.00 | $85.00 | $86.00 | $72.00 | $57.00 | $46.05 |
| 611E08900 21" CONDUIT, TYPE B | 234 FT | $90.00 | $70.00 | $62.50 | $75.00 | $100 | $112 | $88.00 | $89.00 | $125 |
| 611E09400 21" CONDUIT, TYPE D | 40 FT | $75.00 | $60.00 | $60.75 | $80.00 | $90.00 | $92.00 | $84.00 | $89.00 | $48.65 |
| 611E10400 24" CONDUIT, TYPE B | 108 FT | $100 | $85.00 | $62.25 | $95.00 | $100 | $106 | $125 | $122 | $134 |
| 611E10600 24" CONDUIT, TYPE C | 51 FT | $90.00 | $80.00 | $59.50 | $90.00 | $90.00 | $90.00 | $98.00 | $85.00 | $60.25 |
| 611E16400 36" CONDUIT, TYPE B | 224 FT | $140 | $100 | $85.50 | $150 | $150 | $146 | $186 | $129 | $206 |
| 611E98150 CATCH BASIN, NO. 3 | 2 EACH | $3,100 | $3,000 | $3,141 | $2,275 | $2,770 | $3,400 | $4,100 | $4,433 | $4,205 |
| 611E98180 CATCH BASIN, NO. 3A | 12 EACH | $2,600 | $3,000 | $2,591 | $2,000 | $2,140 | $2,300 | $2,950 | $2,425 | $3,594 |
| 611E98370 CATCH BASIN, NO. 6 | 1 EACH | $2,600 | $3,000 | $2,300 | $2,225 | $3,310 | $2,500 | $2,700 | $2,690 | $3,465 |
| 611E98470 CATCH BASIN, NO. 2-2B | 2 EACH | $1,400 | $1,500 | $2,184 | $1,500 | $1,620 | $1,615 | $1,850 | $1,766 | $3,065 |
| 611E98540 CATCH BASIN, NO. 2-4 | 2 EACH | $2,400 | $3,000 | $3,012 | $2,800 | $1,655 | $2,700 | $3,900 | $3,540 | $4,345 |
| 611E99574 MANHOLE, NO. 3 | 1 EACH | $3,300 | $4,500 | $3,204 | $2,775 | $4,195 | $3,000 | $3,500 | $5,248 | $5,026 |
| 611E99655 MANHOLE ADJUSTED TO GRADE, AS PER PLAN | 2 EACH | $400 | $600 | $1,044 | $1,500 | $1,200 | $700 | $650 | $750 | $1,000 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 9 EACH | $185 | $200 | $193 | $300 | $150 | $700 | $300 | $105 | $748 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1/2" | 21,303 SY | $0.65 | $1.50 | $1.00 | $0.70 | $0.65 | $1.00 | $1.05 | $1.00 | $1.25 |
| 301E48000 ASPHALT CONCRETE BASE, PG64-22 (DRIVEWAYS) | 145 CY | $230 | $215 | $188 | $175 | $230 | $210 | $355 | $205 | $300 |
| 304E20000 AGGREGATE BASE | 1,693 CY | $61.00 | $70.00 | $50.00 | $125 | $52.00 | $81.00 | $80.00 | $61.75 | $83.60 |
| 407E20000 NON-TRACKING TACK COAT | 5,203 GAL | $3.00 | $3.00 | $2.00 | $2.25 | $3.00 | $5.00 | $1.80 | $2.20 | $3.50 |
| 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (251 CY | $155 | $193 | $152 | $215 | $160 | $190 | $220 | $166 | $178 |
| 441E50201 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (611 CY | $140 | $150 | $152 | $155 | $146 | $155 | $170 | $166 | $145 |
| 441E50400 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448) | — | $260 | $500 | $350 | $305 | $418 | $263 | $620 | $378 | $400 |
| 441E50701 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (38 CY | $225 | $350 | $289 | $340 | $225 | $290 | $395 | $326 | $400 |
| 452E10050 6" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC MS | 266 SY | $51.00 | $85.00 | $58.50 | $65.00 | $65.00 | $80.00 | $87.00 | $50.00 | $100 |
| 452E12050 8" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC MS | 815 SY | $65.00 | $100 | $70.50 | $75.00 | $83.00 | $90.00 | $88.00 | $61.00 | $105 |
| 609E26000 CURB, TYPE 6 | 4,427 FT | $16.00 | $20.00 | $16.75 | $15.00 | $17.00 | $12.00 | $18.00 | $13.50 | $34.00 |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 16 CY | $80.00 | $130 | $137 | $65.00 | $175 | $110 | $250 | $150 | $80.00 |
| 875E10000 LONGITUDINAL JOINT ADHESIVE | 4,794 LB | $0.90 | $1.00 | $1.25 | $1.30 | $0.90 | $1.00 | $0.80 | $2.25 | $1.00 |
| 638E10800 VALVE BOX ADJUSTED TO GRADE | 2 EACH | $175 | $500 | $208 | $375 | $450 | $200 | $175 | $500 | $1,000 |
| 638E10900 SERVICE BOX ADJUSTED TO GRADE | 1 EACH | $175 | $700 | $208 | $50.00 | $150 | $200 | $75.00 | $100 | $1,000 |
| 621E00100 RPM | 101 EACH | $45.00 | $45.00 | $45.75 | $60.00 | $68.00 | $65.00 | $67.50 | $66.00 | $70.00 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 85 EACH | $5.00 | $10.00 | $7.75 | $1.00 | $10.00 | $10.00 | $10.00 | $8.00 | $10.00 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 261 FT | $6.45 | $9.00 | $10.25 | $6.45 | $6.00 | $7.00 | $6.00 | $7.00 | $6.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 530 FT | $7.05 | $11.00 | $11.50 | $7.05 | $7.00 | $8.00 | $7.00 | $7.75 | $7.00 |
| 630E08510 STREET NAME SIGN SUPPORT, NO. 2 POST | 40 FT | $9.25 | $9.00 | $12.50 | $9.25 | $8.00 | $9.00 | $8.00 | $11.00 | $8.00 |
| 630E08600 SIGN POST REFLECTOR | 33 EACH | $51.15 | $48.00 | $46.50 | $51.15 | $20.00 | $22.00 | $20.00 | $56.00 | $20.00 |
| 630E80100 SIGN, FLAT SHEET | 329 SF | $17.90 | $16.00 | $15.50 | $17.90 | $12.00 | $13.00 | $12.00 | $20.00 | $12.00 |
| 630E80500 SIGN, DOUBLE FACED, STREET NAME | 3 EACH | $190 | $240 | $254 | $190 | $145 | $160 | $145 | $208 | $145 |
| 630E80600 SIGN, DOUBLE FACED, MILE MARKER | 1 EACH | $170 | $175 | $171 | $170 | $75.00 | $80.00 | $75.00 | $185 | $75.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 49 EACH | $29.25 | $11.00 | $10.25 | $29.25 | $25.00 | $27.00 | $25.00 | $32.00 | $25.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 9 EACH | $70.20 | $90.00 | $88.00 | $70.20 | $45.00 | $48.00 | $45.00 | $77.00 | $45.00 |
| 630E85201 REMOVAL OF GROUND MOUNTED SIGN AND DELIVERY, AS PE | 4 EACH | $100 | $27.00 | $26.00 | $100 | $30.00 | $32.00 | $30.00 | $110 | $30.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 40 EACH | $43.50 | $16.00 | $20.75 | $43.50 | $30.00 | $32.00 | $30.00 | $48.00 | $30.00 |
| 630E87500 REMOVAL OF POLE MOUNTED SIGN AND DISPOSAL | 4 EACH | $42.45 | $16.00 | $15.50 | $42.45 | $15.00 | $16.00 | $15.00 | $47.00 | $15.00 |
| 646E10010 EDGE LINE, 6" | 2.78 MILE | $3,300 | $3,500 | $3,411 | $3,300 | $2,400 | $3,600 | $2,400 | $2,625 | $2,400 |
| 646E10200 CENTER LINE | 1.39 MILE | $3,900 | $4,000 | $3,837 | $3,900 | $4,800 | $4,000 | $4,800 | $5,245 | $4,800 |
| 646E10300 CHANNELIZING LINE, 8" | 250 FT | $1.76 | $1.00 | $1.50 | $1.76 | $1.90 | $2.00 | $1.90 | $3.00 | $1.90 |
| 646E10400 STOP LINE | 64 FT | $14.00 | $12.00 | $10.75 | $14.00 | $12.00 | $11.00 | $12.00 | $13.00 | $12.00 |
| 646E10600 TRANSVERSE/DIAGONAL LINE | 137 FT | $12.00 | $9.00 | $8.75 | $12.00 | $8.00 | $9.00 | $8.00 | $9.00 | $8.00 |
| 646E20300 LANE ARROW | 6 EACH | $180 | $270 | $254 | $180 | $165 | $265 | $165 | $181 | $165 |
| 690E98400 SPECIAL - INVENTORY EXISTING PAVEMENT MARKINGS | 1 LS | $1,322 | $1,300 | $2,538 | $400 | $850 | $2,700 | $850 | $929 | $850 |
| 202E11201 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN | 1 LS | $7,500 | $7,000 | $14,500 | $6,285 | $7,500 | $5,100 | $5,700 | $42,000 | $11,000 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $30,000 | $7,000 | $23,000 | $75,000 | $7,500 | $13,850 | $35,000 | $105,000 | $54,065 |
| 503E21100 UNCLASSIFIED EXCAVATION | 45 CY | $150 | $70.00 | $54.25 | $125 | $30.00 | $55.00 | $50.00 | $325 | $86.10 |
| 509E10000 EPOXY COATED REINFORCING STEEL | 6,017 LB | $1.70 | $2.00 | $2.50 | $1.25 | $1.70 | $2.25 | $2.00 | $1.50 | $1.60 |
| 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT | 120 EACH | $30.00 | $50.00 | $1.25 | $50.00 | $20.00 | $24.00 | $20.00 | $12.00 | $37.80 |
| 511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 12 CY | $1,200 | $1,000 | $1,409 | $1,000 | $940 | $1,415 | $1,400 | $990 | $1,535 |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 18 CY | $700 | $500 | $630 | $1,000 | $378 | $900 | $500 | $390 | $831 |
| 511E46610 CLASS QC1 CONCRETE, HEADWALL | 2 CY | $1,200 | $1,000 | $1,244 | $1,000 | $1,140 | $1,200 | $3,900 | $1,330 | $1,540 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 73 SY | $30.00 | $20.00 | $27.50 | $40.00 | $28.00 | $50.00 | $15.00 | $26.00 | $45.55 |
| 512E33000 TYPE 2 WATERPROOFING | 14 SY | $25.00 | $30.00 | $25.25 | $50.00 | $26.00 | $40.00 | $35.00 | $40.00 | $55.75 |
| 512E33010 TYPE 3 WATERPROOFING | 19 SY | $50.00 | $30.00 | $66.25 | $50.00 | $38.00 | $60.00 | $55.00 | $90.00 | $74.80 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 27 SF | $10.00 | $20.00 | $8.50 | $1.00 | $8.00 | $10.00 | $7.00 | $2.00 | $9.90 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 8 CY | $100 | $200 | $93.00 | $400 | $50.00 | $200 | $99.00 | $575 | $154 |
| 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER | 44 CY | $130 | $150 | $93.00 | $250 | $125 | $140 | $200 | $125 | $89.10 |
| 611E96486 20' X 7' CONDUIT, TYPE A, 706.05 | 5 FT | $6,000 | $5,000 | $5,376 | $1,500 | $7,545 | $4,500 | $3,900 | $3,745 | $5,852 |
| 410E12000 TRAFFIC COMPACTED SURFACE, TYPE A OR B | 200 CY | $75.00 | $80.00 | $36.50 | $40.00 | $50.00 | $55.00 | $55.00 | $57.75 | $30.00 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 40 HOUR | $65.00 | $70.00 | $66.00 | $65.00 | $68.00 | $75.00 | $60.00 | $75.00 | $75.00 |
| 614E11630 INCREASED BARRIER DELINEATION | 120 FT | $1.00 | $2.00 | $10.25 | $5.00 | $3.50 | $3.00 | $1.00 | $1.10 | $3.50 |
| 614E12384 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,120 | $2,300 | $1,990 | $2,120 | $2,120 | $2,000 | $1,700 | $2,339 | $1,900 |
| 614E12421 DETOUR SIGNING, AS PER PLAN | 1 LS | $13,000 | $500 | $9,500 | $15,000 | $9,600 | $5,000 | $26,000 | $63,200 | $9,600 |
| 614E12460 WORK ZONE MARKING SIGN | 8 EACH | $120 | $130 | $127 | $120 | $150 | $140 | $275 | $131 | $150 |
| 614E12500 REPLACEMENT SIGN | 5 EACH | $120 | $160 | $152 | $120 | $150 | $160 | $200 | $131 | $150 |
| 614E13310 BARRIER REFLECTOR, TYPE 1 (BIDIRECTIONAL) | 4 EACH | $20.00 | $15.00 | $10.25 | $20.00 | $12.00 | $12.00 | $25.00 | $22.00 | $12.00 |
| 614E13360 OBJECT MARKER, TWO WAY | 4 EACH | $30.00 | $20.00 | $10.25 | $30.00 | $15.00 | $16.00 | $24.00 | $33.00 | $15.00 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 24 SNMT | $650 | $850 | $650 | $650 | $500 | $600 | $500 | $710 | $950 |
| 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT | 2.93 MILE | $2,150 | $1,900 | $1,269 | $2,150 | $900 | $1,850 | $900 | $2,350 | $900 |
| 614E22100 WORK ZONE EDGE LINE, CLASS I, 4", 642 PAINT | 5.85 MILE | $1,075 | $715 | $685 | $1,075 | $600 | $1,500 | $600 | $1,175 | $600 |
| 616E10000 WATER | 54 MGAL | $1.00 | $10.00 | $25.50 | $5.00 | $10.00 | $215 | $80.00 | $0.50 | $10.00 |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 200 FT | $25.00 | $26.00 | $23.75 | $22.00 | $20.00 | $127 | $15.00 | $44.00 | $25.25 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $55,000 | $60,000 | $125,000 | $75,000 | $57,500 | $280,000 | $55,000 | $123,320 | $170,000 |
| 619E16010 FIELD OFFICE, TYPE B | 20 MNTH | $1,300 | $2,600 | $2,000 | $2,000 | $2,850 | $1,200 | $4,400 | $1,275 | $3,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $140,000 | $55,000 | $174,000 | $110,000 | $240,000 | $200,000 | $110,000 | $251,000 | $100,000 |
| 108E10000 CPM PROGRESS SCHEDULE | 1 LS | $15,000 | $4,000 | $28,000 | $18,500 | $30,000 | $27,000 | $5,000 | $30,000 | $16,600 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 5,958 CY | $128 | $763k | 7% |
| 832E30000 EROSION CONTROL | 470,000 EACH | $1 | $470k | 4% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (3201 CY | $130 | $416k | 4% |
| 624E10000 MOBILIZATION | 1 LS | $400,000 | $400k | 3% |
| 203E10000 EXCAVATION | 28,135 CY | $14 | $394k | 3% |
| 631E93241 SCHOOL SPEED LIMIT SIGN ASSEMBLY, SOLAR-POWERED, A | 99 EACH | $3,500 | $347k | 3% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 1,970 CY | $151 | $297k | 3% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 2,187 CY | $117 | $256k | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $225,000 | $225k | 2% |
| 203E10000 EXCAVATION | 13,434 CY | $16 | $215k | 2% |