MOT-SR 235-00.22L
MOT County · est $3.7M
Bid dateThursday, November 19—
MOT County · est $3.7M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 10.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 179 more items below.
| Item | Quantity | R1Eagle Bridge CO | R2Shelly & Sands INC | R3Ruhlin Company | R4Complete General Construction Company | R5George J Igel & CO INC | R6Miller Bros Const INC | R7Sunesis Construction CO | R8Double Z Construction Company | % of bid |
|---|---|---|---|---|---|---|---|---|---|---|
| 511E34446 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK | 287 CY | $925 | $750 | $670 | $800 | $810 | $850 | $1,001 | $835 | 13% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 1,538 CY | $110 | $115 | $130 | $110 | $110 |
| Item | Quantity | R1Eagle Bridge CO | R2Shelly & Sands INC | R3Ruhlin Company | R4Complete General Construction Company | R5George J Igel & CO INC | R6Miller Bros Const INC | R7Sunesis Construction CO | R8Double Z Construction Company |
|---|---|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $11,000 | $26,875 | $40,000 | $35,000 | $14,000 | $25,000 | $8,000 | $25,000 |
| 202E32000 CURB REMOVED | 104 FT | $1.75 | $3.50 | $6.00 | $8.00 | $6.00 | $0.75 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $110 |
| $110 |
| $110 |
| 8% |
| 509E40000 REINFORCING STEEL, MISC.: GALVANIZED COATED REINFO | 109,103 LB | $1.40 | $1.50 | $1.70 | $1.38 | $1.50 | $1.55 | $1.76 | $1.55 | 8% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $140,000 | $158,500 | $95,000 | $160,000 | $106,000 | $165,000 | $134,518 | $130,000 | 7% |
| 203E10000 EXCAVATION | 19,589 CY | $7.00 | $7.50 | $7.50 | $7.00 | $9.00 | $10.00 | $12.67 | $13.00 | 7% |
| 304E20000 AGGREGATE BASE | 2,686 CY | $47.00 | $57.00 | $55.07 | $57.00 | $52.00 | $54.00 | $53.78 | $65.00 | 6% |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 12,290 SF | $10.00 | $11.00 | $11.50 | $10.00 | $10.00 | $10.50 | $11.80 | $10.00 | 6% |
| 204E21001 GRANULAR EMBANKMENT, AS PER PLAN | 2,619 CY | $40.00 | $37.00 | $47.50 | $35.00 | $40.00 | $37.25 | $51.16 | $45.00 | 5% |
| 203E20000 EMBANKMENT | 20,625 CY | $5.00 | $6.50 | $4.50 | $5.00 | $5.00 | $10.00 | $6.86 | $9.00 | 5% |
| 452E12010 8" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 1,450 SY | $70.00 | $65.00 | $83.00 | $67.00 | $72.00 | $78.00 | $82.60 | $78.00 | 5% |
| 624E10000 MOBILIZATION | 1 LS | $92,000 | $100,000 | $100,000 | $100,000 | $100,000 | $100,000 | $67,600 | $200,000 | 5% |
| 441E10200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 446 (530 CY | $144 | $144 | $160 | $144 | $144 | $144 | $144 | $144 | 4% |
| 202E23000 PAVEMENT REMOVED | 12,515 SY | $6.00 | $6.75 | $6.00 | $9.00 | $10.50 | $6.25 | $6.98 | $16.00 | 4% |
| 441E10000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (446), PG | 455 CY | $128 | $130 | $180 | $128 | $128 | $128 | $128 | $128 | 3% |
| 526E25011 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1 | 190 SY | $275 | $325 | $284 | $275 | $290 | $315 | $331 | $295 | 3% |
| 516E47001 JACKING AND TEMPORARY SUPPORT OF SUPERSTRUCTURE, A | 1 LS | $50,000 | $47,000 | $30,000 | $44,500 | $80,000 | $46,000 | $51,847 | $55,000 | 3% |
| 832E30000 EROSION CONTROL | 46,500 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 2% |
| 605E11110 6" SHALLOW PIPE UNDERDRAINS WITH GEOTEXTILE FABRIC | 5,013 FT | $8.00 | $12.00 | $13.00 | $9.00 | $10.00 | $10.00 | $9.00 | $10.00 | 2% |
| 849E10700 STRAIGHTENING DAMAGED MEMBERS | 1 LS | $40,000 | $38,000 | $34,000 | $35,800 | $31,000 | $35,800 | $36,628 | $35,800 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $40,000 | $21,000 | $27,500 | $25,000 | $18,000 | $20,000 | $18,714 | $30,000 | 2% |
| $3.18 |
| $7.00 |
| 202E34900 PIPE REMOVED | 165 FT | $7.00 | $22.50 | $19.00 | $20.00 | $25.00 | $28.00 | $15.84 | $15.00 |
| 202E38000 GUARDRAIL REMOVED | 2,498 FT | $1.40 | $2.00 | $1.40 | $1.80 | $2.50 | $4.75 | $1.40 | $4.75 |
| 202E58100 CATCH BASIN REMOVED | 1 EACH | $175 | $150 | $640 | $380 | $400 | $300 | $169 | $700 |
| 202E75000 FENCE REMOVED | 160 FT | $4.00 | $2.40 | $2.30 | $2.25 | $5.00 | $10.00 | $5.00 | $10.00 |
| 204E10000 SUBGRADE COMPACTION | 13,432 SY | $1.50 | $2.00 | $2.00 | $1.65 | $3.00 | $1.00 | $1.50 | $2.25 |
| 204E13000 EXCAVATION OF SUBGRADE | 2,619 CY | $7.00 | $15.00 | $19.00 | $14.00 | $16.00 | $15.00 | $29.65 | $15.00 |
| 204E45000 PROOF ROLLING | 7 HOUR | $175 | $650 | $500 | $225 | $90.00 | $85.00 | $203 | $190 |
| 204E50000 GEOTEXTILE FABRIC | 3,152 SY | $1.00 | $0.39 | $1.40 | $1.45 | $1.00 | $0.70 | $1.43 | $1.25 |
| 606E15050 GUARDRAIL, TYPE MGS | 2,261 FT | $15.45 | $15.20 | $15.45 | $15.20 | $16.00 | $19.75 | $15.45 | $19.75 |
| 606E20050 ROUNDED END SECTION | 3 EACH | $45.00 | $58.00 | $45.00 | $55.00 | $40.00 | $50.00 | $45.00 | $50.00 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (MASH 2016) | 3 EACH | $2,375 | $2,450 | $2,375 | $2,320 | $2,200 | $2,400 | $2,375 | $2,400 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 9 EACH | $925 | $1,000 | $925 | $960 | $950 | $1,000 | $925 | $1,000 |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 4 EACH | $2,250 | $2,150 | $2,250 | $2,025 | $1,980 | $2,050 | $2,250 | $2,050 |
| 607E15000 FENCE, TYPE 47 | 92 FT | $25.00 | $21.50 | $25.00 | $20.25 | $25.00 | $45.00 | $25.00 | $45.00 |
| 607E23000 FENCE, TYPE CLT | 64 FT | $32.00 | $42.00 | $32.00 | $39.50 | $50.00 | $52.00 | $32.00 | $52.00 |
| 601E20010 CRUSHED AGGREGATE SLOPE PROTECTION | 137 CY | $70.00 | $75.00 | $100 | $96.00 | $85.00 | $80.00 | $57.70 | $110 |
| 601E21050 TIED CONCRETE BLOCK MAT WITH TYPE 1 UNDERLAYMENT | 18 SY | $100 | $85.00 | $190 | $110 | $120 | $210 | $81.57 | $160 |
| 601E21060 TIED CONCRETE BLOCK MAT WITH TYPE 2 UNDERLAYMENT | 214 SY | $50.00 | $48.00 | $80.00 | $72.00 | $50.00 | $46.00 | $89.34 | $90.00 |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 15 CY | $65.00 | $177 | $160 | $115 | $100 | $255 | $94.84 | $155 |
| 659E00100 SOIL ANALYSIS TEST | 1 EACH | $275 | $105 | $100 | $100 | $100 | $100 | $100 | $100 |
| 659E00300 TOPSOIL | 5,080 CY | $5.00 | $6.00 | $10.00 | $16.00 | $3.00 | $30.00 | $26.02 | $21.00 |
| 659E10000 SEEDING AND MULCHING | 39,189 SY | $1.00 | $0.60 | $0.58 | $0.67 | $1.15 | $0.58 | $0.89 | $0.58 |
| 659E14000 REPAIR SEEDING AND MULCHING | 1,959 SY | $1.00 | $0.50 | $0.50 | $2.00 | $0.50 | $0.50 | $0.50 | $0.50 |
| 659E15000 INTER-SEEDING | 1,959 SY | $1.00 | $0.02 | $0.50 | $2.00 | $0.01 | $0.01 | $0.01 | $0.50 |
| 659E20000 COMMERCIAL FERTILIZER | 5.29 TON | $1,250 | $530 | $610 | $450 | $500 | $500 | $500 | $610 |
| 659E31000 LIME | 8.1 ACRE | $10.00 | $1.00 | $80.00 | $10.00 | $1.00 | $1.00 | $1.00 | $80.00 |
| 659E35000 WATER | 212 MGAL | $10.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 659E40000 MOWING | 88 MSF | $10.00 | $1.00 | $2.00 | $7.50 | $1.00 | $1.00 | $1.00 | $20.00 |
| 670E00500 SLOPE EROSION PROTECTION | 3,483 SY | $2.50 | $2.00 | $2.00 | $2.00 | $1.95 | $1.95 | $1.95 | $2.00 |
| 670E00700 DITCH EROSION PROTECTION | 336 SY | $2.50 | $2.00 | $2.00 | $1.85 | $1.95 | $1.95 | $1.95 | $2.00 |
| 670E00710 DITCH EROSION PROTECTION MAT, TYPE A | 163 SY | $2.50 | $2.00 | $2.00 | $2.00 | $1.95 | $1.95 | $1.95 | $2.00 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $1,500 | $1,350 | $2,500 | $1,285 | $1,500 | $1,500 | $1,285 | $2,500 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $13,500 | $7,200 | $11,808 | $6,120 | $5,000 | $5,000 | $5,440 | $11,800 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $5,500 | $9,800 | $9,500 | $9,535 | $8,600 | $10,000 | $13,483 | $13,000 |
| 836E10000 SEEDING AND EROSION CONTROL WITH TURF REINFORCING | 86 SY | $5.00 | $5.00 | $8.00 | $5.00 | $5.00 | $5.00 | $5.00 | $8.00 |
| 602E20000 CONCRETE MASONRY | 2 CY | $1,500 | $1,900 | $2,600 | $2,700 | $2,200 | $3,800 | $2,623 | $2,500 |
| 605E13410 6" UNCLASSIFIED PIPE UNDERDRAINS WITH GEOTEXTILE F | 579 FT | $8.00 | $13.00 | $13.00 | $13.00 | $12.00 | $15.00 | $9.78 | $16.00 |
| 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS | 146 FT | $9.00 | $24.00 | $25.00 | $24.00 | $16.00 | $38.00 | $14.94 | $16.00 |
| 611E00900 6" CONDUIT, TYPE B | 659 FT | $5.00 | $15.00 | $11.50 | $38.00 | $17.50 | $12.50 | $22.15 | $16.00 |
| 611E01400 6" CONDUIT, TYPE E | 500 FT | $3.00 | $11.00 | $7.00 | $11.00 | $6.00 | $8.00 | $9.83 | $7.00 |
| 611E01500 6" CONDUIT, TYPE F | 530 FT | $3.00 | $13.00 | $15.00 | $12.00 | $6.00 | $8.00 | $10.67 | $8.00 |
| 611E07200 18" CONDUIT, TYPE A | 16 FT | $100 | $100 | $163 | $120 | $180 | $100 | $134 | $175 |
| 611E07900 18" CONDUIT, TYPE D | 80 FT | $45.00 | $45.00 | $98.00 | $63.00 | $60.00 | $75.00 | $67.49 | $75.00 |
| 611E10200 24" CONDUIT, TYPE A | 40 FT | $125 | $145 | $195 | $180 | $250 | $125 | $197 | $180 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 11 EACH | $150 | $240 | $250 | $300 | $240 | $185 | $243 | $350 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 248 FT | $1.90 | $1.60 | $2.00 | $2.50 | $3.00 | $3.00 | $3.00 | $5.00 |
| 407E20000 NON-TRACKING TACK COAT | 873 GAL | $2.00 | $2.00 | $3.00 | $2.00 | $2.00 | $2.00 | $2.00 | $2.00 |
| 422E11000 AGGREGATE, SINGLE CHIP SEAL, TYPE A | 1,215 SY | $7.60 | $7.50 | $15.00 | $11.00 | $45.00 | $5.00 | $5.00 | $11.00 |
| 422E25000 EMULSION, CHIP SEAL | 486 GAL | $4.50 | $6.00 | $15.00 | $8.00 | $2.50 | $28.50 | $28.50 | $15.00 |
| 452E10010 6" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P ( | 9 SY | $120 | $150 | $190 | $189 | $155 | $130 | $94.57 | $125 |
| 452E12010 8" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P ( | 27 SY | $100 | $125 | $183 | $128 | $130 | $95.00 | $91.03 | $125 |
| 609E14000 CURB, TYPE 2-A | 332 FT | $12.00 | $24.00 | $23.00 | $16.00 | $8.00 | $10.00 | $7.00 | $30.00 |
| 609E24510 CURB, TYPE 4-C | 25 FT | $40.00 | $60.00 | $60.00 | $64.00 | $50.00 | $54.00 | $30.00 | $60.00 |
| 609E72000 CONCRETE MEDIAN | 37 SY | $75.00 | $150 | $132 | $74.00 | $50.00 | $80.00 | $88.09 | $150 |
| 625E00450 CONNECTION, FUSED PULL APART | 2 EACH | $100 | $97.00 | $100 | $100 | $92.50 | $92.50 | $101 | $92.50 |
| 625E00460 CONNECTION, UNFUSED PULL APART | 2 EACH | $100 | $110 | $100 | $105 | $109 | $109 | $101 | $109 |
| 625E23302 NO. 6 AWG 2400 VOLT DISTRIBUTION CABLE | 678 FT | $2.90 | $3.00 | $2.90 | $2.00 | $3.00 | $3.00 | $2.94 | $3.00 |
| 625E23400 NO. 10 AWG POLE AND BRACKET CABLE | 348 FT | $1.20 | $2.00 | $1.20 | $3.00 | $1.90 | $1.90 | $1.22 | $1.90 |
| 625E25408 CONDUIT, 2", 725.051 | 81 FT | $10.00 | $7.00 | $10.00 | $10.00 | $7.15 | $7.15 | $10.14 | $7.15 |
| 625E25500 CONDUIT, 3", 725.04 | 83 FT | $26.00 | $28.00 | $26.00 | $29.50 | $27.25 | $27.25 | $26.37 | $27.25 |
| 625E26253 LUMINAIRE, CONVENTIONAL, SOLID STATE (LED), AS PER | 2 EACH | $600 | $700 | $600 | $685 | $675 | $675 | $609 | $675 |
| 625E29000 TRENCH | 164 FT | $12.50 | $12.00 | $12.50 | $9.00 | $12.20 | $12.20 | $12.68 | $12.20 |
| 625E30700 PULL BOX, 725.08, 18" | 3 EACH | $850 | $800 | $850 | $950 | $800 | $800 | $862 | $800 |
| 625E36010 UNDERGROUND WARNING/MARKING TAPE | 164 FT | $0.70 | $0.15 | $0.70 | $0.20 | $0.15 | $0.15 | $0.71 | $0.15 |
| 621E00100 RPM | 104 EACH | $36.79 | $35.00 | $38.75 | $37.00 | $38.75 | $36.79 | $38.75 | $38.75 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 30 EACH | $6.00 | $8.27 | $11.00 | $20.00 | $12.00 | $14.50 | $1.00 | $10.00 |
| 626E00112 BARRIER REFLECTOR, TYPE 3, BI-DIRECTIONAL | 34 EACH | $8.00 | $7.50 | $10.00 | $7.10 | $8.50 | $15.00 | $11.00 | $15.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 553.9 FT | $9.50 | $12.00 | $12.00 | $12.00 | $10.00 | $9.50 | $12.00 | $9.50 |
| 630E06500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W6X9 | 36.5 FT | $42.00 | $38.00 | $25.00 | $38.50 | $17.50 | $31.00 | $25.00 | $31.00 |
| 630E08004 ONE WAY SUPPORT, NO. 3 POST | 45.3 FT | $9.50 | $12.00 | $16.00 | $12.00 | $12.50 | $11.25 | $16.00 | $11.25 |
| 630E08600 SIGN POST REFLECTOR | 29 EACH | $30.00 | $45.00 | $50.00 | $45.00 | $38.00 | $54.25 | $50.00 | $54.25 |
| 630E80100 SIGN, FLAT SHEET | 388.7 SF | $14.00 | $13.50 | $25.00 | $13.50 | $15.00 | $14.55 | $25.00 | $14.55 |
| 630E80200 SIGN, GROUND MOUNTED EXTRUSHEET | 27 SF | $25.00 | $24.75 | $20.00 | $24.70 | $20.00 | $35.55 | $20.00 | $35.55 |
| 630E84500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT FOUNDATION | 2 EACH | $975 | $825 | $850 | $825 | $750 | $975 | $850 | $975 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 61 EACH | $10.00 | $10.00 | $20.00 | $10.00 | $20.00 | $15.00 | $20.00 | $15.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 33 EACH | $15.00 | $16.00 | $25.00 | $15.00 | $20.00 | $30.00 | $25.00 | $30.00 |
| 630E86102 REMOVAL OF GROUND MOUNTED STRUCTURAL BEAM SUPPORT | 2 EACH | $125 | $245 | $225 | $245 | $300 | $300 | $225 | $300 |
| 630E86310 REMOVAL OF STRUCTURE MOUNTED SIGN AND DISPOSAL | 2 EACH | $20.00 | $225 | $125 | $225 | $20.00 | $450 | $125 | $450 |
| 630E87500 REMOVAL OF POLE MOUNTED SIGN AND DISPOSAL | 1 EACH | $10.00 | $65.00 | $25.00 | $65.00 | $20.00 | $30.00 | $25.00 | $30.00 |
| 644E00100 EDGE LINE, 4" | 0.63 MILE | $2,930 | $2,900 | $8,235 | $2,930 | $2,930 | $2,930 | $2,930 | $2,930 |
| 644E00104 EDGE LINE, 6" | 0.17 MILE | $2,930 | $2,900 | $9,090 | $2,930 | $2,930 | $2,930 | $2,930 | $2,930 |
| 644E00300 CENTER LINE | 0.45 MILE | $5,860 | $5,875 | $9,800 | $5,860 | $5,860 | $5,860 | $5,860 | $5,860 |
| 644E00400 CHANNELIZING LINE, 8" | 1,097 FT | $2.00 | $2.00 | $2.40 | $2.00 | $2.00 | $2.00 | $2.00 | $2.00 |
| 644E00500 STOP LINE | 79 FT | $5.95 | $6.00 | $5.90 | $5.95 | $5.95 | $5.95 | $5.95 | $5.95 |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 198 FT | $5.95 | $6.00 | $5.75 | $5.95 | $5.95 | $5.95 | $5.95 | $5.95 |
| 644E00900 ISLAND MARKING | 52 SF | $3.00 | $3.00 | $3.75 | $3.00 | $3.00 | $3.00 | $3.00 | $3.00 |
| 644E01300 LANE ARROW | 7 EACH | $85.00 | $85.00 | $150 | $85.00 | $85.00 | $85.00 | $85.00 | $85.00 |
| 644E01360 WRONG WAY ARROW | 4 EACH | $268 | $265 | $250 | $268 | $268 | $268 | $268 | $268 |
| 646E10000 EDGE LINE, 4" | 0.14 MILE | $13,229 | $13,300 | $34,755 | $13,229 | $13,229 | $13,229 | $13,229 | $13,229 |
| 646E10010 EDGE LINE, 6" | 0.19 MILE | $19,800 | $20,000 | $35,175 | $19,800 | $19,800 | $19,800 | $19,800 | $19,800 |
| 646E10200 CENTER LINE | 0.04 MILE | $39,600 | $39,000 | $35,600 | $39,600 | $39,600 | $39,600 | $39,600 | $39,600 |
| 646E10400 STOP LINE | 45 FT | $25.00 | $25.00 | $15.00 | $25.00 | $25.00 | $25.00 | $25.00 | $25.00 |
| 611E00400 4" CONDUIT, TYPE E | 100 FT | $2.00 | $13.00 | $2.00 | $12.50 | $12.00 | $12.00 | $10.10 | $12.00 |
| 625E18511 BRACKET ARM, 30', AS PER PLAN | 2 EACH | $1,700 | $1,600 | $1,700 | $2,000 | $1,518 | $1,518 | $1,724 | $1,518 |
| 625E25400 CONDUIT, 2", 725.04 | 855 FT | $13.00 | $13.00 | $13.00 | $17.00 | $13.00 | $13.00 | $13.18 | $13.00 |
| 625E25500 CONDUIT, 3", 725.04 | 90 FT | $26.00 | $25.00 | $26.00 | $29.50 | $24.95 | $24.95 | $26.37 | $24.95 |
| 625E25600 CONDUIT, 4", 725.04 | 97 FT | $35.00 | $38.00 | $35.00 | $36.00 | $37.70 | $37.70 | $35.50 | $37.70 |
| 625E29000 TRENCH | 969 FT | $12.50 | $12.00 | $12.50 | $9.00 | $12.20 | $12.20 | $12.68 | $12.20 |
| 625E30700 PULL BOX, 725.08, 18" | 3 EACH | $850 | $800 | $850 | $950 | $800 | $800 | $862 | $800 |
| 625E30706 PULL BOX, 725.08, 24" | 2 EACH | $1,050 | $932 | $1,050 | $1,175 | $932 | $932 | $1,065 | $932 |
| 625E32000 GROUND ROD | 3 EACH | $258 | $223 | $258 | $250 | $223 | $223 | $262 | $223 |
| 625E36010 UNDERGROUND WARNING/MARKING TAPE | 969 FT | $0.70 | $0.15 | $0.70 | $0.20 | $0.15 | $0.15 | $0.71 | $0.15 |
| 632E05007 VEHICULAR SIGNAL HEAD, (LED), 3-SECTION, 12" LENS, | 4 EACH | $900 | $786 | $900 | $695 | $786 | $786 | $913 | $786 |
| 632E05087 VEHICULAR SIGNAL HEAD, (LED), 5-SECTION, 12" LENS, | 2 EACH | $1,450 | $1,200 | $1,450 | $1,125 | $1,213 | $1,213 | $1,471 | $1,213 |
| 632E25000 COVERING OF VEHICULAR SIGNAL HEAD | 6 EACH | $40.00 | $29.00 | $40.00 | $35.00 | $28.50 | $28.50 | $40.57 | $28.50 |
| 632E26500 DETECTOR LOOP | 4 EACH | $1,100 | $1,285 | $1,100 | $2,600 | $1,285 | $1,285 | $1,116 | $1,285 |
| 632E40700 SIGNAL CABLE, 7 CONDUCTOR, NO. 14 AWG | 459 FT | $2.60 | $2.50 | $2.60 | $2.50 | $2.40 | $2.40 | $2.64 | $2.40 |
| 632E64010 SIGNAL SUPPORT FOUNDATION | 2 EACH | $5,400 | $3,800 | $6,500 | $5,000 | $3,648 | $3,648 | $6,592 | $3,648 |
| 632E65200 LOOP DETECTOR LEAD-IN CABLE | 1,071 FT | $1.20 | $1.90 | $1.20 | $1.80 | $1.90 | $1.90 | $1.22 | $1.90 |
| 632E69300 POWER CABLE, 3 CONDUCTOR, NO. 4 AWG | 221 FT | $5.00 | $5.60 | $5.00 | $6.50 | $5.60 | $5.60 | $5.07 | $5.60 |
| 632E70001 POWER SERVICE, AS PER PLAN | 1 EACH | $1,300 | $2,265 | $1,300 | $2,750 | $2,264 | $2,264 | $1,318 | $2,264 |
| 632E77033 COMBINATION SIGNAL SUPPORT, TYPE TC-81.21 DESIGN 4 | 1 EACH | $11,300 | $11,800 | $11,300 | $10,000 | $11,843 | $11,843 | $11,460 | $11,843 |
| 632E77233 SIGNAL SUPPORT, MECHANICAL DAMPER FOR TC-81.21 MAS | 1 EACH | $750 | $535 | $750 | $2,380 | $535 | $535 | $761 | $535 |
| 632E81071 COMBINATION SIGNAL SUPPORT, TYPE TC-81.21, DESIGN | 1 EACH | $11,850 | $11,700 | $11,850 | $11,000 | $11,712 | $11,712 | $12,018 | $11,712 |
| 632E90101 REMOVAL OF TRAFFIC SIGNAL INSTALLATION, AS PER PLA | 1 EACH | $1,400 | $4,100 | $1,400 | $3,350 | $4,100 | $4,100 | $1,420 | $4,100 |
| 632E90400 SIGNALIZATION, MISC.:TEST HOLE PERFORMED | 1 EACH | $150 | $1,325 | $150 | $2,000 | $1,326 | $1,326 | $152 | $1,326 |
| 633E65511 CABINET, TYPE TS-2, AS PER PLAN | 1 EACH | $10,200 | $11,000 | $10,200 | $11,500 | $10,792 | $10,792 | $10,345 | $10,792 |
| 633E67101 CABINET FOUNDATION, AS PER PLAN | 1 EACH | $2,700 | $1,400 | $2,700 | $2,800 | $1,410 | $1,410 | $2,738 | $1,410 |
| 633E67201 CONTROLLER WORK PAD, AS PER PLAN | 1 EACH | $500 | $588 | $500 | $890 | $588 | $588 | $507 | $588 |
| 633E75001 UNINTERRUPTIBLE POWER SUPPLY (UPS), 1000 WATT, AS | 1 EACH | $5,500 | $5,341 | $5,500 | $5,000 | $5,341 | $5,341 | $5,578 | $5,341 |
| 809E69123 ATC V6.24 CONTROLLER, AS PER PLAN | 1 EACH | $4,150 | $4,680 | $4,150 | $4,000 | $4,681 | $4,681 | $4,209 | $4,681 |
| 809E69201 EMERGENCY VEHICLE PREEMPTION, AS PER PLAN | 1 EACH | $500 | $775 | $500 | $500 | $773 | $773 | $507 | $773 |
| 809E69211 PREEMPT RECEIVING UNIT, AS PER PLAN | 1 EACH | $3,650 | $3,600 | $3,650 | $3,700 | $3,590 | $3,590 | $3,702 | $3,590 |
| 809E69220 PREEMPT DETECTOR CABLE | 59 FT | $4.92 | $4.00 | $5.00 | $3.70 | $4.00 | $4.00 | $5.07 | $4.00 |
| 809E69231 PREEMPT PHASE SELECTOR, AS PER PLAN | 1 EACH | $4,000 | $4,200 | $4,000 | $3,665 | $4,128 | $4,128 | $4,057 | $4,128 |
| 809E69241 PREEMPT CONFIRMATION LIGHT, AS PER PLAN | 3 EACH | $650 | $375 | $650 | $750 | $377 | $377 | $659 | $377 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 100 HOUR | $100 | $72.00 | $77.00 | $85.00 | $74.00 | $70.00 | $75.00 | $70.06 |
| 614E11630 INCREASED BARRIER DELINEATION | 150 FT | $2.00 | $2.50 | $2.50 | $2.50 | $2.00 | $5.00 | $2.50 | $2.50 |
| 614E12380 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $1,750 | $2,000 | $1,900 | $1,960 | $2,000 | $2,500 | $1,900 | $2,000 |
| 614E12420 DETOUR SIGNING | 1 LS | $27,500 | $50,000 | $46,955 | $50,000 | $24,500 | $25,000 | $53,356 | $80,000 |
| 614E13310 BARRIER REFLECTOR, TYPE 1 (ONE WAY) | 68 EACH | $4.00 | $6.00 | $10.00 | $8.30 | $10.00 | $7.00 | $13.59 | $15.00 |
| 614E13350 OBJECT MARKER, ONE WAY | 68 EACH | $6.00 | $16.00 | $13.00 | $13.00 | $16.00 | $12.00 | $13.00 | $18.00 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 18 SNMT | $500 | $900 | $770 | $700 | $410 | $995 | $995 | $900 |
| 616E10000 WATER | 110 MGAL | $10.00 | $30.00 | $35.00 | $80.00 | $40.00 | $55.00 | $5.09 | $15.00 |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 2,720 FT | $6.00 | $13.00 | $15.00 | $16.00 | $15.00 | $23.00 | $17.77 | $20.00 |
| 202E11501 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN (MAIN M | 1 EACH | $17,500 | $15,000 | $8,000 | $13,200 | $18,000 | $15,000 | $14,031 | $20,000 |
| 513E10261 STRUCTURAL STEEL MEMBERS, LEVEL 3, AS PER PLAN | 16,270 LB | $2.10 | $2.25 | $1.90 | $3.10 | $2.30 | $2.55 | $2.57 | $3.00 |
| 513E90000 STRUCTURAL STEEL, MISC.: REPAIR OF DAMAGED SECONDA | 1,041 LB | $7.50 | $6.15 | $6.50 | $6.20 | $7.50 | $7.30 | $7.37 | $7.00 |
| 513E90000 STRUCTURAL STEEL, MISC.:REPAIR OF DAMAGED SECONDAR | 297 LB | $10.00 | $6.77 | $6.50 | $6.50 | $10.00 | $8.25 | $8.49 | $7.00 |
| 849E10001 DAMAGE ASSESSMENT, AS PER PLAN | 1 LS | $2,750 | $1,800 | $1,000 | $1,800 | $3,100 | $1,800 | $1,842 | $1,800 |
| 849E10500 SURFACE PREPARATION | 1 LS | $2,500 | $1,500 | $5,000 | $1,500 | $7,000 | $1,500 | $1,535 | $2,500 |
| 849E10600 REPAIRING DAMAGED MEMBERS BY GRINDING | 6 HOUR | $135 | $100 | $400 | $95.00 | $450 | $95.00 | $97.20 | $95.00 |
| 202E22900 APPROACH SLAB REMOVED | 134 SY | $30.00 | $23.00 | $22.00 | $40.00 | $35.00 | $40.00 | $30.99 | $45.00 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $1.00 | $7,500 | $1.00 | $400 | $100 | $1.00 | $200 | $1,000 |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $12,000 | $12,500 | $14,000 | $14,000 | $23,000 | $12,500 | $987 | $15,000 |
| 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR | 100 LB | $1.00 | $1.75 | $4.50 | $2.00 | $1.20 | $2.00 | $3.55 | $4.00 |
| 509E30030 NO. 5 GFRP DEFORMED BARS | 1,752 FT | $1.80 | $2.00 | $2.20 | $2.10 | $2.00 | $2.00 | $2.46 | $2.50 |
| 509E30040 NO. 6 GFRP DEFORMED BARS | 6,527 FT | $2.40 | $2.60 | $2.80 | $2.50 | $2.50 | $2.40 | $3.05 | $3.00 |
| 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT | 286 EACH | $15.00 | $24.00 | $20.00 | $13.00 | $22.00 | $21.00 | $13.79 | $25.00 |
| 511E34450 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK (PARAPE | 73 CY | $525 | $425 | $530 | $525 | $600 | $550 | $533 | $600 |
| 511E41010 CLASS QC1 CONCRETE, PIER ABOVE FOOTINGS | 53 CY | $750 | $1,200 | $980 | $1,000 | $1,300 | $1,125 | $1,265 | $1,200 |
| 511E43510 CLASS QC1 CONCRETE, ABUTMENT INCLUDING FOOTING | 31 CY | $800 | $980 | $780 | $870 | $720 | $825 | $699 | $1,200 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 853 SY | $19.95 | $22.00 | $19.95 | $21.00 | $21.00 | $25.00 | $21.00 | $20.47 |
| 513E10220 STRUCTURAL STEEL MEMBERS, LEVEL 1 | 1,665 LB | $8.50 | $8.25 | $7.90 | $8.06 | $14.00 | $9.30 | $8.84 | $10.00 |
| 513E20000 WELDED STUD SHEAR CONNECTORS | 4,575 EACH | $3.40 | $3.40 | $3.30 | $3.40 | $3.50 | $4.34 | $4.23 | $4.00 |
| 513E90000 STRUCTURAL STEEL, MISC.: NEW CROSSFRAME ASSEMBLIES | 1,183 LB | $6.75 | $6.15 | $6.95 | $6.19 | $8.00 | $7.85 | $7.37 | $7.00 |
| 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME | 12,290 SF | $1.75 | $1.50 | $2.00 | $4.00 | $4.00 | $2.50 | $2.95 | $1.75 |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 12,490 SF | $1.75 | $1.50 | $1.00 | $3.00 | $3.00 | $2.50 | $2.95 | $1.75 |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 12,490 SF | $1.50 | $1.30 | $1.00 | $2.25 | $2.25 | $2.50 | $2.95 | $1.50 |
| 514E00504 GRINDING FINS, TEARS, SLIVERS ON EXISTING STRUCTUR | 20 MNHR | $75.00 | $80.00 | $85.00 | $150 | $150 | $100 | $70.82 | $75.00 |
| 514E10000 FINAL INSPECTION REPAIR | 13 EACH | $300 | $320 | $100 | $200 | $200 | $100 | $413 | $300 |
| 516E10010 ARMORLESS PREFORMED JOINT SEAL | 67 FT | $50.00 | $76.00 | $50.00 | $72.00 | $60.00 | $65.00 | $72.00 | $45.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 5 SF | $7.00 | $20.00 | $18.00 | $17.00 | $20.00 | $14.00 | $5.79 | $19.00 |
| 516E13900 2" PREFORMED EXPANSION JOINT FILLER | 34 SF | $11.00 | $8.50 | $9.00 | $12.00 | $20.00 | $8.00 | $6.73 | $20.00 |
| 516E14020 SEMI-INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 93 FT | $28.00 | $34.00 | $33.00 | $32.00 | $32.00 | $28.00 | $45.00 | $28.00 |
| 516E44101 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 15 EACH | $1,000 | $950 | $1,200 | $926 | $830 | $1,125 | $1,026 | $1,000 |
| 516E44201 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 10 EACH | $1,100 | $1,100 | $1,100 | $850 | $1,100 | $1,250 | $1,177 | $950 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 43 CY | $95.00 | $125 | $105 | $100 | $115 | $95.00 | $80.03 | $110 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 100 FT | $10.00 | $7.50 | $22.00 | $9.00 | $7.00 | $8.00 | $2.52 | $10.00 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 60 FT | $12.00 | $5.00 | $25.00 | $14.00 | $7.00 | $14.00 | $14.33 | $14.00 |
| 526E90031 TYPE C INSTALLATION, AS PER PLAN | 67 FT | $275 | $214 | $200 | $225 | $210 | $215 | $220 | $210 |
| 607E39900 VANDAL PROTECTION FENCE, 6' STRAIGHT, COATED FABRI | 434 FT | $87.00 | $70.00 | $87.00 | $79.25 | $74.50 | $106 | $87.00 | $122 |
| 202E23500 WEARING COURSE REMOVED | 1,096 SY | $4.00 | $10.50 | $1.25 | $8.00 | $3.30 | $4.00 | $10.00 | $6.00 |
| 108E10000 CPM PROGRESS SCHEDULE | 1 LS | $1,000 | $2,500 | $2,500 | $3,500 | $2,000 | $2,000 | $9,033 | $3,500 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $32,500 | $55,000 | $55,000 | $37,000 | $37,000 | $70,000 | $14,701 | $75,000 |
| 619E16010 FIELD OFFICE, TYPE B | 8 MNTH | $1,500 | $2,830 | $2,500 | $3,000 | $2,800 | $2,000 | $1,091 | $1,800 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $15,000 | $47,000 | $51,000 | $9,000 | $20,000 | $18,000 | $17,550 | $40,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 511E34446 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK | 287 CY | $925 | $265k | 9% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 1,538 CY | $110 | $169k | 6% |
| 509E40000 REINFORCING STEEL, MISC.: GALVANIZED COATED REINFO | 109,103 LB | $1.4 | $153k | 5% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $140,000 | $140k | 5% |
| 203E10000 EXCAVATION | 19,589 CY | $7 | $137k | 4% |
| 304E20000 AGGREGATE BASE | 2,686 CY | $47 | $126k | 4% |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 12,290 SF | $10 | $123k | 4% |
| 204E21001 GRANULAR EMBANKMENT, AS PER PLAN | 2,619 CY | $40 | $105k | 3% |
| 203E20000 EMBANKMENT | 20,625 CY | $5 | $103k | 3% |
| 452E12010 8" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 1,450 SY | $70 | $102k | 3% |