MAD-US 62-02.79
MAD County · est $2.3M
Bid dateThursday, December 3—
MAD County · est $2.3M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 10.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 77 more items below.
| Item | Quantity | R1Complete General Construction Company | R2Shelly & Sands INC | R3Ruhlin Company | R4Sunesis Construction CO | R5J D Williamson Construction CO INC | R6Eagle Bridge CO | R7Heavy Highway Construction Company | R8LLC Rietschlin Construction INC | R9Miller Bros Const INC | R10Double Z Construction Company | % of bid |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 515E15080 DRAPED STRAND PRESTRESSED CONCRETE BRIDGE I-BEAM M | 12 EACH | $41,000 | $40,000 | $44,450 | $46,308 | $42,350 | $39,000 | $37,600 | $42,660 | $46,000 | $42,200 |
| Item | Quantity | R1Complete General Construction Company | R2Shelly & Sands INC | R3Ruhlin Company | R4Sunesis Construction CO | R5J D Williamson Construction CO INC | R6Eagle Bridge CO | R7Heavy Highway Construction Company | R8LLC Rietschlin Construction INC | R9Miller Bros Const INC | R10Double Z Construction Company |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 202E23000 PAVEMENT REMOVED | 549 SY | $8.00 | $7.67 | $8.00 | $7.38 | $8.50 | $10.00 | $11.00 | $8.00 | $10.00 | $16.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 26% |
| 511E21522 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE | 301 CY | $675 | $700 | $725 | $797 | $660 | $850 | $725 | $680 | $685 | $750 | 11% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $120,000 | $100,000 | $211,500 | $196,972 | $110,000 | $245,000 | $272,000 | $350,000 | $200,000 | $77,500 | 6% |
| 202E11003 STRUCTURE REMOVED, OVER 20 FOOT SPAN, AS PER PLAN | 1 LS | $110,000 | $100,000 | $28,000 | $78,894 | $225,000 | $80,000 | $110,000 | $130,000 | $175,000 | $295,815 | 6% |
| 511E40512 CLASS QC1 CONCRETE WITH QC/QA, PIER ABOVE FOOTINGS | 174 CY | $605 | $810 | $515 | $714 | $640 | $775 | $525 | $400 | $585 | $725 | 6% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 107,043 LB | $0.95 | $1.00 | $1.00 | $1.06 | $0.95 | $1.00 | $1.00 | $1.00 | $1.10 | $1.00 | 5% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $100,000 | $100,000 | $56,350 | $100,000 | $100,000 | $75,000 | $100,000 | $100,000 | $100,000 | 5% |
| 517E70000 RAILING (TWIN STEEL TUBE) | 579 FT | $147 | $125 | $155 | $144 | $155 | $140 | $140 | $151 | $140 | $158 | 4% |
| 507E00750 16" CAST-IN-PLACE REINFORCED CONCRETE PILES, FURNI | 1,200 FT | $70.00 | $50.00 | $75.50 | $67.91 | $56.50 | $87.00 | $49.75 | $81.50 | $80.00 | $82.50 | 4% |
| 511E43512 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT INCLUDING | 145 CY | $500 | $625 | $525 | $524 | $465 | $450 | $540 | $390 | $450 | $500 | 4% |
| 515E20000 INTERMEDIATE DIAPHRAGMS | 27 EACH | $2,300 | $3,000 | $1,125 | $2,122 | $1,100 | $2,250 | $1,700 | $1,920 | $2,350 | $1,400 | 3% |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 3,350 FT | $16.00 | $16.00 | $17.10 | $16.00 | $17.00 | $16.00 | $16.00 | $17.50 | $16.00 | $17.10 | 3% |
| 601E32110 ROCK CHANNEL PROTECTION, TYPE B WITH AGGREGATE FIL | 645 CY | $68.00 | $68.00 | $65.00 | $92.47 | $100 | $70.00 | $80.00 | $70.00 | $85.00 | $70.00 | 2% |
| 511E33418 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE | 73 CY | $600 | $1,000 | $510 | $501 | $575 | $850 | $535 | $600 | $650 | $580 | 2% |
| 526E25000 REINFORCED CONCRETE APPROACH SLABS (T=15") | 178 SY | $245 | $225 | $240 | $260 | $250 | $250 | $245 | $208 | $265 | $260 | 2% |
| 507E00550 12" CAST-IN-PLACE REINFORCED CONCRETE PILES, FURNI | 960 FT | $45.00 | $30.00 | $53.50 | $40.03 | $31.25 | $56.00 | $29.00 | $52.00 | $52.00 | $45.00 | 2% |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $40,000 | $20,000 | $22,245 | $41,819 | $35,000 | $55,000 | $50,000 | $57,000 | $45,000 | $70,000 | 2% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 260 CY | $150 | $175 | $175 | $204 | $200 | $175 | $190 | $206 | $175 | $190 | 2% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $30,000 | $24,500 | $22,250 | $18,989 | $35,500 | $35,000 | $250,000 | $31,500 | $50,000 | $20,000 | 2% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 88 CY | $330 | $620 | $375 | $466 | $450 | $400 | $330 | $305 | $350 | $350 | 2% |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 90 FT | $12.00 | $12.00 | $8.25 | $4.02 | $5.50 | $10.00 | $12.00 | $32.00 | $21.00 | $12.00 |
| 202E38000 GUARDRAIL REMOVED | 3,812 FT | $1.60 | $2.00 | $1.60 | $1.80 | $2.00 | $1.80 | $1.50 | $3.00 | $1.80 | $1.60 |
| 202E98100 REMOVAL MISC.:ELECTRIC GATE REMOVED | 1 EACH | $235 | $200 | $1,644 | $27.00 | $215 | $200 | $175 | $216 | $200 | $630 |
| 202E98200 REMOVAL MISC.:ELECTRIC FENCE REMOVED | 331 FT | $5.00 | $3.00 | $8.73 | $5.43 | $3.25 | $3.00 | $2.00 | $3.25 | $3.00 | $11.42 |
| 203E10000 EXCAVATION | 1,946 CY | $13.00 | $12.50 | $10.15 | $13.52 | $23.00 | $14.00 | $12.00 | $17.00 | $17.50 | $23.00 |
| 203E20000 EMBANKMENT | 1,563 CY | $15.00 | $12.50 | $13.25 | $9.50 | $22.50 | $14.00 | $13.00 | $14.00 | $17.50 | $10.00 |
| 204E10000 SUBGRADE COMPACTION | 455 SY | $2.50 | $4.00 | $4.25 | $1.90 | $2.50 | $7.00 | $2.25 | $2.50 | $2.00 | $8.00 |
| 204E13000 EXCAVATION OF SUBGRADE | 203 CY | $30.00 | $19.00 | $17.75 | $21.00 | $20.00 | $25.00 | $18.00 | $24.00 | $20.00 | $18.00 |
| 204E30010 GRANULAR MATERIAL, TYPE B | 203 CY | $55.00 | $50.00 | $48.50 | $53.66 | $45.00 | $50.00 | $65.00 | $50.00 | $65.00 | $45.00 |
| 204E45000 PROOF ROLLING | 1 HOUR | $125 | $200 | $325 | $189 | $300 | $125 | $205 | $216 | $85.00 | $180 |
| 204E50000 GEOTEXTILE FABRIC | 455 SY | $2.25 | $1.00 | $0.75 | $0.85 | $2.25 | $1.00 | $2.00 | $1.75 | $0.85 | $1.80 |
| 209E72000 PREPARING SUBGRADE FOR SHOULDER PAVING | 32 STA | $250 | $250 | $450 | $223 | $37.00 | $150 | $22.85 | $104 | $325 | $109 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (NCHRP 350) | 2 EACH | $2,120 | $2,150 | $2,360 | $2,150 | $2,275 | $2,150 | $2,150 | $2,322 | $2,150 | $2,360 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 2 EACH | $935 | $950 | $925 | $950 | $1,000 | $950 | $950 | $1,026 | $950 | $925 |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 4 EACH | $1,965 | $1,950 | $2,075 | $1,950 | $2,050 | $1,950 | $1,950 | $2,106 | $1,950 | $2,075 |
| 623E40520 RIGHT-OF-WAY MONUMENT | 6 EACH | $800 | $250 | $140 | $18.96 | $95.00 | $400 | $350 | $162 | $250 | $750 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $100 | $88.00 | $88.00 | $50.00 | $100 | $275 | $200 | $95.00 | $100 | $100 |
| 659E00300 TOPSOIL | 185 CY | $35.00 | $25.00 | $2.21 | $21.34 | $40.00 | $10.00 | $28.00 | $41.00 | $25.00 | $45.00 |
| 659E10000 SEEDING AND MULCHING | 1,670 SY | $2.10 | $1.70 | $1.70 | $2.48 | $1.85 | $2.50 | $1.10 | $1.90 | $2.10 | $3.34 |
| 659E14000 REPAIR SEEDING AND MULCHING | 84 SY | $2.10 | $0.70 | $0.68 | $1.00 | $1.00 | $2.00 | $0.90 | $0.75 | $2.10 | $2.10 |
| 659E15000 INTER-SEEDING | 84 SY | $2.10 | $0.70 | $0.68 | $0.01 | $1.00 | $2.00 | $0.50 | $0.75 | $2.10 | $2.10 |
| 659E20000 COMMERCIAL FERTILIZER | 0.23 TON | $610 | $600 | $655 | $500 | $550 | $1,250 | $592 | $710 | $610 | $610 |
| 659E31000 LIME | 0.35 ACRE | $80.00 | $150 | $152 | $200 | $200 | $10.00 | $98.00 | $164 | $80.00 | $80.00 |
| 659E35000 WATER | 9 MGAL | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $15.00 | $2.20 | $1.00 | $1.00 | $1.00 |
| 659E40000 MOWING | 4 MSF | $100 | $10.00 | $2.00 | $1.00 | $1.00 | $40.00 | $1,000 | $33.00 | $10.00 | $20.00 |
| 670E00500 SLOPE EROSION PROTECTION | 1,550 SY | $2.00 | $1.50 | $1.32 | $2.35 | $2.50 | $2.50 | $1.90 | $1.50 | $2.00 | $2.00 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $1,300 | $1,300 | $1,295 | $1,295 | $4,500 | $1,750 | $2,500 | $3,780 | $2,500 | $1,295 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $6,200 | $5,000 | $6,120 | $4,760 | $10,000 | $12,500 | $5,000 | $4,320 | $11,800 | $5,440 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $10,000 | $10,000 | $12,065 | $13,507 | $11,000 | $5,500 | $5,000 | $9,720 | $10,000 | $10,000 |
| 832E30000 EROSION CONTROL | 25,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 605E31100 AGGREGATE DRAINS | 649 FT | $16.00 | $15.00 | $14.25 | $7.01 | $15.00 | $8.50 | $11.00 | $11.50 | $9.00 | $12.00 |
| 611E04900 12" CONDUIT, TYPE D | 93 FT | $134 | $50.00 | $23.00 | $39.56 | $30.00 | $38.00 | $51.00 | $43.00 | $40.00 | $45.00 |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 74 CY | $235 | $235 | $235 | $233 | $305 | $235 | $290 | $314 | $235 | $290 |
| 304E20000 AGGREGATE BASE | 74 CY | $87.00 | $75.00 | $70.00 | $59.69 | $50.00 | $90.00 | $55.00 | $90.00 | $95.00 | $85.00 |
| 407E20000 NON-TRACKING TACK COAT | 64 GAL | $3.25 | $3.25 | $3.25 | $4.25 | $3.50 | $3.25 | $3.25 | $3.50 | $3.25 | $3.25 |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 20 CY | $375 | $375 | $375 | $300 | $335 | $375 | $320 | $346 | $375 | $320 |
| 617E10100 COMPACTED AGGREGATE | 437 CY | $65.00 | $50.00 | $47.00 | $77.15 | $62.00 | $45.00 | $51.00 | $70.00 | $64.00 | $105 |
| 626E00102 BARRIER REFLECTOR, TYPE 1 (BI-DIRECTIONAL) | 7 EACH | $7.10 | $10.00 | $10.00 | $10.00 | $10.00 | $10.00 | $10.00 | $11.00 | $10.00 | $15.46 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (BI-DIRECTIONAL) | 36 EACH | $7.85 | $8.00 | $10.00 | $8.00 | $8.50 | $8.00 | $8.00 | $9.00 | $8.00 | $12.48 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 23 FT | $13.00 | $10.00 | $7.80 | $10.00 | $10.00 | $10.00 | $10.00 | $11.00 | $10.00 | $25.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 56 FT | $15.00 | $12.00 | $8.05 | $12.00 | $12.50 | $12.00 | $12.00 | $13.00 | $12.00 | $25.00 |
| 630E04100 GROUND MOUNTED SUPPORT, NO. 4 POST | 17.5 FT | $18.00 | $14.00 | $12.15 | $13.50 | $14.50 | $13.50 | $13.50 | $15.00 | $13.50 | $25.00 |
| 630E80100 SIGN, FLAT SHEET | 37.3 SF | $20.00 | $20.00 | $22.95 | $20.00 | $20.00 | $20.00 | $20.00 | $22.00 | $20.00 | $25.00 |
| 630E85000 REMOVAL OF GROUND MOUNTED SIGN AND STORAGE | 8 EACH | $15.00 | $20.00 | $83.35 | $20.00 | $20.00 | $20.00 | $20.00 | $22.00 | $20.00 | $50.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 7 EACH | $15.00 | $20.00 | $63.50 | $20.00 | $20.00 | $20.00 | $20.00 | $22.00 | $20.00 | $20.00 |
| 644E00104 EDGE LINE, 6" | 0.16 MILE | $13,614 | $12,500 | $16,900 | $13,614 | $12,500 | $11,845 | $12,000 | $7,800 | $7,200 | $11,845 |
| 644E00300 CENTER LINE | 0.08 MILE | $13,614 | $12,500 | $22,530 | $13,614 | $13,500 | $12,555 | $12,575 | $7,800 | $7,200 | $12,555 |
| 407E20000 NON-TRACKING TACK COAT | 530 GAL | $3.25 | $3.25 | $3.25 | $4.25 | $3.50 | $3.25 | $3.25 | $3.50 | $3.25 | $3.25 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 16 HOUR | $85.00 | $72.00 | $92.95 | $65.00 | $75.00 | $80.00 | $75.00 | $71.00 | $65.00 | $65.00 |
| 614E12420 DETOUR SIGNING | 1 LS | $20,000 | $42,000 | $24,770 | $24,382 | $40,000 | $35,000 | $24,000 | $10,800 | $24,770 | $25,000 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 41 CY | $200 | $150 | $305 | $200 | $150 | $350 | $200 | $250 | $305 | $351 |
| 616E10000 WATER | 7 MGAL | $65.00 | $50.00 | $200 | $10.33 | $10.00 | $15.00 | $49.00 | $11.00 | $115 | $50.00 |
| 617E10100 COMPACTED AGGREGATE | 150 CY | $55.00 | $65.00 | $47.00 | $89.24 | $60.00 | $60.00 | $50.00 | $73.00 | $95.00 | $95.01 |
| 617E25000 WATER | 2 MGAL | $70.00 | $40.00 | $110 | $5.07 | $10.00 | $15.00 | $48.00 | $11.00 | $115 | $50.00 |
| 642E00300 CENTER LINE, TYPE 1 | 2.12 MILE | $1,513 | $800 | $215 | $1,513 | $1,500 | $1,370 | $1,200 | $900 | $800 | $1,370 |
| 202E23500 WEARING COURSE REMOVED | 875 SY | $8.25 | $5.75 | $14.50 | $8.71 | $7.00 | $5.00 | $7.00 | $6.00 | $6.00 | $8.00 |
| 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION | 1 LS | $13,000 | $12,500 | $20,000 | $13,210 | $15,500 | $22,500 | $25,000 | $11,600 | $25,000 | $25,000 |
| 507E00500 12" CAST-IN-PLACE REINFORCED CONCRETE PILES, DRIVE | 800 FT | $15.00 | $20.00 | $20.00 | $17.09 | $26.00 | $5.00 | $17.00 | $14.50 | $10.00 | $15.00 |
| 507E00700 16" CAST-IN-PLACE REINFORCED CONCRETE PILES, DRIVE | 1,080 FT | $15.00 | $25.00 | $20.00 | $27.15 | $40.00 | $6.00 | $27.00 | $17.00 | $10.00 | $25.00 |
| 512E10050 SEALING OF CONCRETE SURFACES (NON-EPOXY) | 950 SY | $10.50 | $10.50 | $8.00 | $9.29 | $12.00 | $10.50 | $8.00 | $11.50 | $9.00 | $10.50 |
| 512E10300 SEALING CONCRETE BRIDGE DECKS WITH HMWM RESIN | 31 SY | $25.00 | $25.00 | $22.00 | $27.45 | $30.00 | $10.00 | $35.00 | $27.00 | $40.00 | $45.36 |
| 516E13200 1/2" PREFORMED EXPANSION JOINT FILLER | 131 SF | $8.00 | $5.00 | $6.00 | $2.32 | $4.00 | $4.00 | $5.00 | $7.00 | $4.25 | $10.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 242 SF | $9.00 | $5.00 | $6.50 | $3.27 | $5.00 | $6.00 | $10.00 | $5.00 | $5.25 | $12.00 |
| 516E14014 INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 93 FT | $45.00 | $28.00 | $28.00 | $28.97 | $55.00 | $28.00 | $20.00 | $25.00 | $28.00 | $35.00 |
| 516E44101 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 24 EACH | $1,100 | $975 | $1,055 | $1,086 | $950 | $1,000 | $975 | $1,130 | $1,375 | $1,100 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 86 CY | $82.00 | $100 | $58.00 | $77.46 | $78.00 | $100 | $75.00 | $71.00 | $80.00 | $95.00 |
| 518E22300 SPECIAL - STEEL DRIP STRIP | 706 FT | $12.75 | $12.75 | $17.48 | $13.21 | $7.25 | $13.00 | $8.00 | $11.00 | $13.75 | $15.42 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 115 FT | $6.00 | $6.50 | $15.50 | $3.28 | $14.00 | $9.00 | $8.00 | $11.00 | $8.00 | $10.00 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 53 FT | $14.00 | $6.50 | $16.00 | $6.98 | $14.00 | $10.00 | $15.00 | $16.00 | $15.00 | $15.00 |
| 523E20000 DYNAMIC LOAD TESTING | 2 EACH | $4,900 | $3,100 | $7,250 | $5,532 | $4,750 | $3,500 | $3,500 | $3,150 | $3,500 | $2,900 |
| 526E90010 TYPE A INSTALLATION | 69 FT | $190 | $135 | $195 | $120 | $140 | $140 | $140 | $130 | $150 | $220 |
| 202E22900 APPROACH SLAB REMOVED | 84 SY | $50.00 | $29.50 | $35.00 | $37.66 | $25.00 | $30.00 | $50.00 | $30.00 | $35.00 | $40.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $17,000 | $13,000 | $11,660 | $13,720 | $30,500 | $25,000 | $25,001 | $24,700 | $25,000 | $24,000 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $6,000 | $5,000 | $25,000 | $5,712 | $25,500 | $6,500 | $10,000 | $37,600 | $2,500 | $10,000 |
| 619E16010 FIELD OFFICE, TYPE B | 9 MNTH | $2,000 | $2,600 | $2,550 | $1,074 | $2,100 | $1,750 | $2,000 | $1,200 | $1,800 | $1,350 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $5,000 | $20,000 | $30,000 | $7,500 | $12,500 | $12,500 | $20,000 | $10,000 | $16,850 | $15,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 515E15080 DRAPED STRAND PRESTRESSED CONCRETE BRIDGE I-BEAM M | 12 EACH | $41,000 | $492k | 21% |
| 511E21522 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE | 301 CY | $675 | $203k | 9% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $120,000 | $120k | 5% |
| 202E11003 STRUCTURE REMOVED, OVER 20 FOOT SPAN, AS PER PLAN | 1 LS | $110,000 | $110k | 5% |
| 511E40512 CLASS QC1 CONCRETE WITH QC/QA, PIER ABOVE FOOTINGS | 174 CY | $605 | $105k | 4% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 107,043 LB | $0.95 | $102k | 4% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $100k | 4% |
| 517E70000 RAILING (TWIN STEEL TUBE) | 579 FT | $146.5 | $85k | 4% |
| 507E00750 16" CAST-IN-PLACE REINFORCED CONCRETE PILES, FURNI | 1,200 FT | $70 | $84k | 4% |
| 511E43512 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT INCLUDING | 145 CY | $500 | $73k | 3% |