HAM-US 50-22.30/22.38
HAM County · est $2.1M
Bid dateThursday, December 17—
HAM County · est $2.1M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 7.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 72 more items below.
| Item | Quantity | R1Complete General Construction Company | R2Prus Construction Company | R3Sunesis Construction CO | R4Great Lakes Construction CO | R5Becdir Construction Company | % of bid |
|---|---|---|---|---|---|---|---|
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 19,193 SF | $8.00 | $8.00 | $9.09 | $8.00 | $8.00 | 12% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 1,000 HOUR | $85.00 | $80.00 | $71.97 | $73.00 | $62.00 | 7% |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 10,414 SF | $8.00 | $8.00 | $11.36 | $8.00 | $7.00 |
| Item | Quantity | R1Complete General Construction Company | R2Prus Construction Company | R3Sunesis Construction CO | R4Great Lakes Construction CO | R5Becdir Construction Company |
|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $25,000 | $15,000 | $14,650 | $65,000 | $27,500 |
| 203E10000 EXCAVATION | 497 CY | $30.00 | $37.00 | $52.87 | $30.00 | $45.00 |
| 203E20000 EMBANKMENT | 49 CY | $35.00 | $20.00 | $15.31 | $50.00 | $40.00 |
| 690E98400 SPECIAL - MISC.: CONSULTANT FOR CONCRETE QUALITY C |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 7% |
| 844E10001 CONCRETE PATCHING WITH GALVANIC ANODE PROTECTION, | 458 SF | $175 | $170 | $200 | $125 | $200 | 6% |
| 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION | 1,132 SY | $69.00 | $63.00 | $50.65 | $55.00 | $92.00 | 6% |
| 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME | 19,193 SF | $4.00 | $4.00 | $2.84 | $4.00 | $3.00 | 6% |
| 516E11210 STRUCTURAL EXPANSION JOINT INCLUDING ELASTOMERIC S | 139 FT | $550 | $670 | $951 | $645 | $700 | 6% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $65,000 | $142,000 | $45,102 | $133,000 | $125,000 | 5% |
| AA2 514E00067 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT, AS P | 10,819 SF | $6.00 | $6.00 | $13.63 | $14.00 | $10.00 | 5% |
| 513E95030 STRUCTURAL STEEL, MISC.: LATERAL BRACING AND GUSSE | 8 EACH | $7,450 | $4,700 | $5,531 | $9,500 | $7,250 | 5% |
| 513E95030 STRUCTURAL STEEL, MISC.: WELD REMOVAL | 72 EACH | $800 | $75.00 | $41.18 | $80.00 | $89.00 | 5% |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 19,193 SF | $3.00 | $3.00 | $3.41 | $3.00 | $2.00 | 5% |
| 601E32305 ROCK CHANNEL PROTECTION, TYPE D WITH GEOTEXTILE FA | 654 CY | $70.00 | $120 | $233 | $200 | $125 | 4% |
| 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME | 10,414 SF | $4.00 | $4.00 | $4.54 | $4.00 | $3.00 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $40,000 | $49,630 | $100,000 | $100,000 | 3% |
| 848E10001 MICRO SILICA MODIFIED CONCRETE OVERLAY USING HYDRO | 1,132 SY | $35.00 | $63.50 | $60.87 | $56.00 | $88.00 | 3% |
| 511E34444 CLASS QC2 CONCRETE, BRIDGE DECK | 14 CY | $2,600 | $3,600 | $5,012 | $4,000 | $1,950 | 3% |
| 519E00100 SPECIAL - COMPOSITE FIBER WRAP SYSTEM | 933 SF | $38.77 | $31.50 | $29.41 | $65.00 | $21.00 | 3% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $35,000 | $30,000 | $46,980 | $80,000 | $100,000 | 3% |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 10,819 SF | $3.00 | $3.00 | $4.54 | $3.00 | $2.00 | 3% |
| 1 LS |
| $12,000 |
| $5,350 |
| $5,981 |
| $20,000 |
| $10,500 |
| 601E21051 TIED CONCRETE BLOCK MAT WITH TYPE 1 UNDERLAYMENT, | 6 SY | $250 | $182 | $118 | $300 | $210 |
| 659E00300 TOPSOIL | 112 CY | $25.00 | $70.00 | $24.96 | $60.00 | $55.00 |
| 659E10000 SEEDING AND MULCHING | 1,011 SY | $3.95 | $2.70 | $5.98 | $2.75 | $3.10 |
| 659E14000 REPAIR SEEDING AND MULCHING | 51 SY | $0.80 | $1.07 | $5.02 | $1.00 | $0.50 |
| 659E20000 COMMERCIAL FERTILIZER | 0.14 TON | $545 | $1,070 | $846 | $500 | $800 |
| 659E31000 LIME | 0.21 ACRE | $45.00 | $110 | $106 | $200 | $95.00 |
| 659E35000 WATER | 5 MGAL | $1.00 | $26.75 | $10.57 | $1.00 | $15.00 |
| 832E30000 EROSION CONTROL | 1,400 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 621E00100 RPM | 22 EACH | $144 | $154 | $144 | $144 | $150 |
| 626E00102 BARRIER REFLECTOR, TYPE 1, ONE WAY | 26 EACH | $12.00 | $13.00 | $12.00 | $12.00 | $12.60 |
| 630E08004 ONE WAY SUPPORT, NO. 3 POST | 14.1 FT | $20.00 | $16.00 | $15.00 | $20.00 | $16.00 |
| 630E79500 SIGN SUPPORT ASSEMBLY, POLE MOUNTED | 10 EACH | $125 | $139 | $130 | $125 | $135 |
| 630E79604 SIGN SUPPORT ASSEMBLY, BRIDGE MOUNTED, TYPE 2 | 3 EACH | $1,995 | $1,875 | $1,750 | $1,995 | $1,850 |
| 630E80100 SIGN, FLAT SHEET | 94.5 SF | $25.00 | $29.00 | $27.00 | $25.00 | $28.50 |
| 630E87500 REMOVAL OF POLE MOUNTED SIGN AND DISPOSAL | 4 EACH | $30.00 | $21.50 | $20.00 | $30.00 | $21.00 |
| 646E10010 EDGE LINE, 6" | 0.25 MILE | $12,600 | $13,500 | $12,600 | $12,600 | $13,250 |
| 646E20320 WRONG WAY ARROW | 1 EACH | $2,150 | $2,300 | $2,150 | $2,150 | $2,260 |
| 614E12384 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $1,900 | $2,034 | $1,900 | $1,900 | $2,000 |
| 614E12420 DETOUR SIGNING | 1 LS | $13,660 | $12,050 | $18,825 | $11,260 | $15,000 |
| 614E13310 BARRIER REFLECTOR, TYPE 1, ONE-WAY | 28 EACH | $10.00 | $10.75 | $10.00 | $10.00 | $10.50 |
| 614E13350 OBJECT MARKER, ONE WAY | 28 EACH | $13.00 | $14.00 | $13.00 | $13.00 | $14.00 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 6 SNMT | $900 | $963 | $1,368 | $900 | $1,000 |
| 614E22210 WORK ZONE EDGE LINE, CLASS I, 6", 740.06, TYPE I | 1.4 MILE | $8,100 | $8,670 | $8,100 | $8,100 | $8,500 |
| 614E24402 WORK ZONE DOTTED LINE, CLASS I, 6", 740.06, TYPE I | 2,085 FT | $2.00 | $2.15 | $2.00 | $2.00 | $2.10 |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 1,180 FT | $14.00 | $15.00 | $17.23 | $14.00 | $14.75 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.45 MILE | $1,515 | $1,620 | $1,515 | $1,515 | $1,600 |
| 642E00204 LANE LINE, 6", TYPE 1 | 1.33 MILE | $1,165 | $1,250 | $1,165 | $1,165 | $1,225 |
| 642E00300 CENTER LINE, TYPE 1 | 0.57 MILE | $1,685 | $1,800 | $1,685 | $1,685 | $1,770 |
| 642E00400 CHANNELIZING LINE, 8", TYPE 1 | 620 FT | $0.55 | $0.60 | $0.55 | $0.55 | $0.58 |
| 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR | 200 LB | $7.50 | $4.75 | $6.86 | $9.00 | $3.50 |
| 511E34448 CLASS QC2 CONCRETE, BRIDGE DECK (PARAPET) | 6 CY | $2,000 | $7,200 | $3,191 | $5,000 | $2,700 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 1,074 SY | $22.50 | $33.00 | $22.50 | $25.00 | $22.00 |
| 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE | 1,041 SY | $30.00 | $28.75 | $30.00 | $20.00 | $39.00 |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 19,193 SF | $1.50 | $1.50 | $2.84 | $1.50 | $1.00 |
| 514E00504 GRINDING FINS, TEARS, SLIVERS ON EXISTING STRUCTUR | 34 MNHR | $150 | $161 | $170 | $150 | $160 |
| 514E10000 FINAL INSPECTION REPAIR | 20 EACH | $250 | $268 | $568 | $250 | $265 |
| 516E01301 ELASTOMERIC STRIP SEAL WITHOUT STEEL EXTRUSIONS, A | 26 FT | $185 | $85.00 | $95.90 | $180 | $100 |
| 516E47001 JACKING AND TEMPORARY SUPPORT OF SUPERSTRUCTURE, A | 1 LS | $25,000 | $30,000 | $87,571 | $30,000 | $40,000 |
| 518E63300 STRUCTURE DRAINAGE, MISC.:CLEANING BRIDGE DRAINAGE | 1 LS | $15,000 | $10,130 | $3,456 | $5,000 | $3,000 |
| 607E39900 VANDAL PROTECTION FENCE, 6' STRAIGHT, COATED FABRI | 306 FT | $82.50 | $136 | $144 | $82.50 | $134 |
| 845E60000 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 48 SF | $400 | $428 | $454 | $400 | $300 |
| 845E61000 GRINDING FINS, TEARS, SLIVERS ON EXISTING STRUCTUR | 1 MNHR | $1.00 | $1.00 | $170 | $1.00 | $160 |
| 845E98000 FIELD METALLIZING, MISC.:METALLIZING OF EXISTING S | 48 SF | $200 | $510 | $568 | $107 | $550 |
| 848E30000 MICRO SILICA MODIFIED CONCRETE OVERLAY (VARIABLE T | 20 CY | $225 | $500 | $354 | $300 | $365 |
| 848E50000 HAND CHIPPING | 12 SY | $75.00 | $950 | $90.18 | $400 | $140 |
| 848E50100 TEST SLAB | 1 LS | $500 | $2,472 | $2,158 | $400 | $2,000 |
| 848E50200 FULL-DEPTH REPAIR | 10 CY | $500 | $1,140 | $3,253 | $220 | $1,700 |
| 511E34448 CLASS QC2 CONCRETE, BRIDGE DECK (PARAPET) | 1 CY | $3,000 | $4,915 | $3,243 | $5,000 | $1,500 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 171 SY | $22.50 | $36.00 | $22.50 | $25.00 | $24.00 |
| 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE | 169 SY | $30.00 | $28.00 | $30.00 | $20.00 | $39.00 |
| 513E95000 STRUCTURAL STEEL, MISC.: GIRDER FLASHING | 267 FT | $90.00 | $64.00 | $85.65 | $105 | $125 |
| 513E95030 STRUCTURAL STEEL, MISC.: REPLACEMENT OF DETERIORAT | 146 EACH | $102 | $59.00 | $41.60 | $105 | $112 |
| 514E00504 GRINDING FINS, TEARS, SLIVERS ON EXISTING STRUCTUR | 18 MNHR | $150 | $150 | $170 | $150 | $160 |
| 514E10000 FINAL INSPECTION REPAIR | 8 EACH | $250 | $250 | $568 | $250 | $265 |
| 516E12301 STRIP SEAL EXPANSION JOINT ANCHORED WITH ELASTOMER | 51 FT | $550 | $275 | $786 | $625 | $800 |
| 518E63300 STRUCTURE DRAINAGE, MISC.: CLEANING BRIDGE DRAINAG | 1 LS | $5,000 | $1,520 | $2,386 | $3,500 | $500 |
| 519E00100 SPECIAL - COMPOSITE FIBER WRAP SYSTEM | 788 SF | $29.41 | $31.50 | $29.41 | $65.00 | $21.00 |
| 625E98000 LIGHTING, MISC.: REMOVAL AND RE-ERECTION OF UNDERP | 1 EACH | $15,000 | $8,500 | $9,790 | $8,000 | $10,000 |
| 844E10001 CONCRETE PATCHING WITH GALVANIC ANODE PROTECTION, | 27 SF | $200 | $190 | $221 | $125 | $250 |
| 848E10001 MICRO SILICA MODIFIED CONCRETE OVERLAY USING HYDRO | 290 SY | $35.00 | $83.00 | $50.00 | $128 | $185 |
| 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION | 290 SY | $69.00 | $84.00 | $57.86 | $50.00 | $162 |
| 848E30000 MICRO SILICA MODIFIED CONCRETE OVERLAY (VARIABLE T | 8 CY | $225 | $490 | $354 | $300 | $365 |
| 848E50000 HAND CHIPPING | 3 SY | $75.00 | $627 | $90.18 | $400 | $285 |
| 848E50100 TEST SLAB | 1 LS | $500 | $1,520 | $2,158 | $400 | $2,000 |
| 848E50200 FULL-DEPTH REPAIR | 4 CY | $500 | $790 | $3,202 | $214 | $1,700 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $15,000 | $16,050 | $12,893 | $35,000 | $60,000 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $25,000 | $33,000 | $53,845 | $75,000 | $150,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $3,000 | $5,350 | $1,500 | $10,000 | $5,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 19,193 SF | $8 | $154k | 8% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 1,000 HOUR | $85 | $85k | 5% |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 10,414 SF | $8 | $83k | 5% |
| 844E10001 CONCRETE PATCHING WITH GALVANIC ANODE PROTECTION, | 458 SF | $175 | $80k | 4% |
| 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION | 1,132 SY | $69 | $78k | 4% |
| 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME | 19,193 SF | $4 | $77k | 4% |
| 516E11210 STRUCTURAL EXPANSION JOINT INCLUDING ELASTOMERIC S | 139 FT | $550 | $76k | 4% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $65,000 | $65k | 4% |
| AA2 514E00067 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT, AS P | 10,819 SF | $6 | $65k | 4% |
| 513E95030 STRUCTURAL STEEL, MISC.: LATERAL BRACING AND GUSSE | 8 EACH | $7,450 | $60k | 3% |