HAR-SR 37/SR 53-00.00/01.34
HAR County · est $2.1M
Bid dateThursday, December 17—
HAR County · est $2.1M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 6.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 27 more items below.
| Item | Quantity | R1Kokosing Construction Company INC | R2Shelly Company | R3Bluffton Paving INC | R4Shelly & Sands INC | % of bid |
|---|---|---|---|---|---|---|
| 441E10000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (446), PG | 9,098 CY | $132 | $127 | $146 | $130 | 63% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $112,731 | $75,000 | $124,900 | $216,500 | 6% |
| 253E02000 PAVEMENT REPAIR | 403 CY | $260 | $230 | $236 | $275 | 6% |
| 897E01010 PAVEMENT PLANING, ASPHALT CONCRETE, CLASS A, 0.5" | 167,096 SY | $0.48 | $0.77 | $1.08 | $0.90 | 4% |
| Item | Quantity | R1Kokosing Construction Company INC | R2Shelly Company | R3Bluffton Paving INC | R4Shelly & Sands INC |
|---|---|---|---|---|---|
| 202E32000 CURB REMOVED | 157 FT | $8.65 | $8.65 | $15.00 | $8.65 |
| 203E20000 EMBANKMENT | 1 CY | $100 | $100 | $500 | $100 |
| 209E72050 PREPARING SUBGRADE FOR SHOULDER PAVING | 26.02 MILE | $250 | $300 | $800 | $1,800 |
| 608E13000 6" CONCRETE WALK | 72 SF | $8.90 | $8.85 | $9.00 | $8.85 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 337 CY | $200 | $270 | $146 | $375 | 4% |
| 617E10100 COMPACTED AGGREGATE | 1,697 CY | $35.00 | $42.00 | $51.70 | $60.00 | 3% |
| 407E20000 NON-TRACKING TACK COAT | 18,833 GAL | $2.70 | $2.00 | $1.40 | $2.65 | 3% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.5" DEPTH | 45,276 SY | $0.98 | $1.10 | $1.75 | $1.50 | 2% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $25,000 | $40,000 | $100,000 | 2% |
| 202E23500 WEARING COURSE REMOVED | 10,570 SY | $2.00 | $5.00 | $5.50 | $7.00 | 1% |
| 621E00100 RPM | 786 EACH | $24.00 | $24.00 | $24.00 | $24.00 | 1% |
| 642E00104 EDGE LINE, 6", TYPE 1 | 26.13 MILE | $650 | $716 | $700 | $669 | 1% |
| 608E10000 4" CONCRETE WALK | 1,752 SF | $9.00 | $8.85 | $7.00 | $8.85 | 1% |
| 614E21400 WORK ZONE CENTER LINE, CLASS II | 26.84 MILE | $574 | $400 | $800 | $650 | 1% |
| 614E21000 WORK ZONE CENTER LINE, CLASS I | 13.42 MILE | $800 | $900 | $600 | $800 | 1% |
| 608E52001 CURB RAMP, AS PER PLAN | 994 SF | $9.50 | $8.85 | $12.00 | $8.85 | 0% |
| 642E00300 CENTER LINE, TYPE 1 | 13.42 MILE | $675 | $555 | $650 | $643 | 0% |
| 608E53020 DETECTABLE WARNING | 301 SF | $26.10 | $26.10 | $35.00 | $26.10 | 0% |
| 202E30000 WALK REMOVED | 2,190 SF | $3.50 | $2.95 | $5.00 | $2.95 | 0% |
| 875E10000 LONGITUDINAL JOINT ADHESIVE | 17,649 LB | $0.40 | $0.75 | $0.75 | $1.25 | 0% |
| 609E26000 CURB, TYPE 6 | 163 FT | $19.50 | $19.50 | $25.00 | $19.50 |
| 623E39500 MONUMENT BOX ADJUSTED TO GRADE | 6 EACH | $750 | $200 | $750 | $1,200 |
| 202E30001 WALK REMOVED, AS PER PLAN | 194 SF | $4.50 | $4.50 | $5.00 | $4.50 |
| 659E00300 TOPSOIL | 1 CY | $120 | $120 | $500 | $120 |
| 659E10000 SEEDING AND MULCHING | 30 SY | $8.00 | $8.00 | $15.00 | $8.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.15 TON | $500 | $500 | $2,000 | $500 |
| 659E35000 WATER | 4 MGAL | $2.00 | $5.00 | $10.00 | $50.00 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 |
| 611E04600 12" CONDUIT, TYPE C | 15 FT | $45.00 | $45.00 | $155 | $45.00 |
| 611E98700 INLET, SIDE DITCH | 1 EACH | $1,500 | $1,500 | $1,500 | $1,500 |
| 254E01600 PATCHING PLANED SURFACE | 906 SY | $1.25 | $4.00 | $3.00 | $3.00 |
| 304E20000 AGGREGATE BASE | 85 CY | $40.00 | $50.00 | $20.00 | $100 |
| 618E41000 RUMBLE STRIPES, EDGE LINE (ASPHALT CONCRETE) | 0.49 MILE | $12,000 | $11,250 | $15,000 | $13,000 |
| 897E02000 PATCHING PLANED SURFACE | 3,342 SY | $1.25 | $4.00 | $5.00 | $4.00 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 786 EACH | $4.00 | $6.00 | $8.00 | $3.00 |
| 643E00500 STOP LINE | 156 FT | $6.50 | $6.60 | $11.00 | $11.00 |
| 643E00600 CROSSWALK LINE | 468 FT | $3.25 | $3.30 | $6.00 | $5.60 |
| 643E00800 CURB MARKING | 496 FT | $3.50 | $3.60 | $8.00 | $7.55 |
| 643E01000 RAILROAD SYMBOL MARKING | 2 EACH | $800 | $530 | $800 | $795 |
| 643E01200 PARKING LOT STALL MARKING | 668 FT | $3.75 | $3.75 | $4.00 | $3.25 |
| 614E12460 WORK ZONE MARKING SIGN | 82 EACH | $55.01 | $80.00 | $80.00 | $80.00 |
| 100E00300 PREMIUM ON RAILROADS' PROTECTIVE PUBLIC LIABILITY | 1 LS | $3,200 | $10,000 | $5,000 | $7,500 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $6,000 | $10,000 | $12,500 | $15,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 441E10000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (446), PG | 9,098 CY | $132 | $1.20M | 61% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $112,731 | $113k | 6% |
| 253E02000 PAVEMENT REPAIR | 403 CY | $260 | $105k | 5% |
| 897E01010 PAVEMENT PLANING, ASPHALT CONCRETE, CLASS A, 0.5" | 167,096 SY | $0.48 | $80k | 4% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 337 CY | $200 | $67k | 3% |
| 617E10100 COMPACTED AGGREGATE | 1,697 CY | $35 | $59k | 3% |
| 407E20000 NON-TRACKING TACK COAT | 18,833 GAL | $2.7 | $51k | 3% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.5" DEPTH | 45,276 SY | $0.98 | $44k | 2% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $40k | 2% |
| 202E23500 WEARING COURSE REMOVED | 10,570 SY | $2 | $21k | 1% |