MAD-SR 323-03.90
MAD County · est $0.4M
Bid dateThursday, February 13—
MAD County · est $0.4M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 15 more items below.
| Item | Quantity | R1Bcc Ohio INC | R2Bridge Specialists INC | R3Righter Company INC | R4Axis Civil Construction LLC | % of bid |
|---|---|---|---|---|---|---|
| 511E34410 CLASS QC2 CONCRETE, SUPERSTRUCTURE | 54 CY | $1,160 | $784 | $2,060 | $1,450 | 19% |
| 517E70000 RAILING (TWIN STEEL TUBE) | 263 FT | $154 | $147 | $150 | $142 | 12% |
| 202E11301 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN | 56 CY | $639 | $740 | $950 | $875 | 11% |
| 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION | 389 SY | $84.16 | $101 | $110 | $110 | 10% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 13,706 LB | $2.32 | $2.60 | $2.50 | $3.50 | 10% |
| 848E10200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY USING HYDR | 500 SY | $50.67 | $57.00 | $110 | $120 |
| Item | Quantity | R1Bcc Ohio INC | R2Bridge Specialists INC | R3Righter Company INC | R4Axis Civil Construction LLC |
|---|---|---|---|---|---|
| 202E38001 GUARDRAIL REMOVED, AS PER PLAN | 581.25 FT | $1.68 | $1.76 | $1.60 | $6.00 |
| 202E42001 ANCHOR ASSEMBLY REMOVED, TYPE A, AS PER PLAN | 4 EACH | $310 | $324 | $295 | $500 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, BIDIRECTIONAL | 12 EACH | $8.35 | $8.75 | $7.95 | $10.00 |
| 659E00530 SEEDING AND MULCHING, CLASS 3B | 750.98 SY | $3.94 | $5.00 | $3.75 | $3.75 |
| 659E20000 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 8% |
| 203E20001 EMBANKMENT, AS PER PLAN | 250.32 CY | $65.09 | $68.00 | $35.00 | $35.00 | 5% |
| 659E00300 TOPSOIL | 250.32 CY | $47.46 | $85.00 | $20.00 | $25.00 | 4% |
| 606E26100 ANCHOR ASSEMBLY, TYPE E, (NCHRP 350 OR MASH 2016) | 4 EACH | $2,389 | $2,502 | $2,275 | $2,200 | 3% |
| 511E50210 CLASS QC1 CONCRETE, SUBSTRUCTURE | 2 CY | $4,628 | $1,800 | $3,000 | $2,000 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $7,616 | $22,265 | $10,000 | $35,000 | 2% |
| 614E12420 DETOUR SIGNING | 1 LS | $6,812 | $15,050 | $10,000 | $8,650 | 2% |
| 848E50000 HAND CHIPPING | 50 SY | $132 | $70.00 | $50.00 | $70.00 | 2% |
| 848E50320 EXISTING CONCRETE OVERLAY REMOVED, 1 1/4" | 389 SY | $15.04 | $20.00 | $40.00 | $17.00 | 2% |
| 606E32160 BRIDGE TERMINAL ASSEMBLY, TYPE TST | 4 EACH | $1,386 | $1,452 | $1,320 | $2,000 | 2% |
| 606E15050 GUARDRAIL, TYPE MGS | 300 FT | $17.64 | $18.50 | $16.80 | $16.85 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $4,244 | $13,004 | $9,000 | $5,500 | 1% |
| 646E10000 EDGE LINE, 4" | 0.05 MILE | $71,400 | $62,075 | $7,800 | $7,800 | 1% |
| 646E10200 CENTER LINE | 0.02 MILE | $157,500 | $63,680 | $14,250 | $14,250 | 1% |
| 518E22300 SPECIAL - STEEL DRIP STRIP | 310 FT | $10.07 | $18.00 | $15.00 | $12.00 | 1% |
| 0.11 TON |
| $525 |
| $410 |
| $500 |
| $500 |
| 659E31000 LIME | 0.17 ACRE | $210 | $100 | $200 | $34.00 |
| 659E35000 WATER | 4 MGAL | $2.10 | $2.00 | $1.00 | $1.00 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 16 HOUR | $78.75 | $70.00 | $65.00 | $60.00 |
| 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT | 24 EACH | $21.01 | $20.00 | $40.00 | $35.00 |
| 516E31001 JOINT SEALER, AS PER PLAN | 42 FT | $33.44 | $20.00 | $20.00 | $35.00 |
| 848E30200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY (VARIABLE | 10 CY | $299 | $250 | $200 | $250 |
| 848E50100 TEST SLAB | 1 LS | $1,088 | $900 | $2,000 | $500 |
| 848E50340 REMOVAL OF DEBONDED OR DETERIORATED EXISTING VARIA | 20 SY | $28.80 | $70.00 | $50.00 | $70.00 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $1,869 | $5,440 | $5,000 | $10,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 511E34410 CLASS QC2 CONCRETE, SUPERSTRUCTURE | 54 CY | $1,160 | $63k | 18% |
| 517E70000 RAILING (TWIN STEEL TUBE) | 263 FT | $154.35 | $41k | 12% |
| 202E11301 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN | 56 CY | $639 | $36k | 10% |
| 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION | 389 SY | $84.16 | $33k | 10% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 13,706 LB | $2.32 | $32k | 9% |
| 848E10200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY USING HYDR | 500 SY | $50.67 | $25k | 7% |
| 203E20001 EMBANKMENT, AS PER PLAN | 250.32 CY | $65.09 | $16k | 5% |
| 659E00300 TOPSOIL | 250.32 CY | $47.46 | $12k | 3% |
| 606E26100 ANCHOR ASSEMBLY, TYPE E, (NCHRP 350 OR MASH 2016) | 4 EACH | $2,389 | $10k | 3% |
| 511E50210 CLASS QC1 CONCRETE, SUBSTRUCTURE | 2 CY | $4,628 | $9k | 3% |