BEL-SR 7-20.23
BEL County · est $0.3M
Bid dateThursday, May 7—
BEL County · est $0.3M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 10 more items below.
| Item | Quantity | R1Bog Construction INC | R2Alan Stone CO INC | R3Buds INC | R4Eclipse CO LLC | R5Rietschlin Construction INC | % of bid |
|---|---|---|---|---|---|---|---|
| 622E10161 CONCRETE BARRIER, SINGLE SLOPE, TYPE D, AS PER PLA | 508 FT | $120 | $157 | $185 | $202 | $208 | 26% |
| 622E10161 CONCRETE BARRIER, SINGLE SLOPE, TYPE D, AS PER PLA | 428 FT | $135 | $160 | $218 | $262 | $308 | 24% |
| 608E10000 4" CONCRETE WALK | 2,258 SF | $7.00 | $13.00 | $10.00 | $9.00 | $11.00 | 7% |
| 624E10000 MOBILIZATION | 1 LS | $15,000 | $28,000 | $10,000 | $30,783 | $40,000 | 6% |
| 659E10000 SEEDING AND MULCHING | 2,771 SY | $4.00 | $2.00 | $2.75 | $2.50 | $4.00 | 5% |
| 659E00300 TOPSOIL | 308 CY | $30.00 |
| Item | Quantity | R1Bog Construction INC | R2Alan Stone CO INC | R3Buds INC | R4Eclipse CO LLC | R5Rietschlin Construction INC |
|---|---|---|---|---|---|---|
| 202E35100 PIPE REMOVED, 24" AND UNDER | 25 FT | $50.00 | $31.00 | $45.00 | $16.00 | $40.00 |
| 202E58100 CATCH BASIN REMOVED | 2 EACH | $500 | $900 | $350 | $600 | $600 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $50.00 | $93.00 | $25.00 | $158 | $50.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 139 SY | $1.00 | $1.00 | $0.01 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $42.00 |
| $18.00 |
| $70.00 |
| $40.00 |
| 4% |
| 605E14020 6" BASE PIPE UNDERDRAINS WITH GEOTEXTILE FABRIC | 458 FT | $20.00 | $28.00 | $18.00 | $15.50 | $20.00 | 4% |
| 304E20000 AGGREGATE BASE | 70 CY | $130 | $140 | $97.00 | $81.50 | $270 | 4% |
| 202E30000 WALK REMOVED | 2,258 SF | $3.00 | $3.00 | $4.00 | $3.00 | $1.50 | 3% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $6,500 | $2,000 | $5,000 | $11,500 | $15,000 | 3% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $6,500 | $6,300 | $7,000 | $14,500 | $6,000 | 3% |
| 202E98000 REMOVAL MISC.: ROCK DEBRIS | 1 LS | $5,000 | $3,900 | $1,000 | $3,499 | $10,000 | 2% |
| 832E30000 EROSION CONTROL | 5,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $4,500 | $25,300 | $20,000 | $30,000 | $24,000 | 2% |
| 607E98000 FENCE, MISC.: TEMPORARY ORANGE PLASTIC CONSTRUCTIO | 1,815 FT | $2.00 | $4.00 | $7.00 | $5.00 | $8.00 | 2% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $3,500 | $2,000 | $10,000 | $9,146 | $50,000 | 1% |
| 203E10000 EXCAVATION | 153 CY | $20.00 | $45.00 | $40.00 | $34.00 | $40.00 | 1% |
| 203E20000 EMBANKMENT | 125 CY | $20.00 | $25.00 | $40.00 | $47.00 | $40.00 | 1% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 40 HOUR | $60.00 | $70.00 | $75.00 | $79.00 | $75.00 | 1% |
| 619E16000 FIELD OFFICE, TYPE A | 3 MNTH | $500 | $1,500 | $200 | $500 | $1,890 | 1% |
| $1.00 |
| $3.00 |
| 659E15000 INTER-SEEDING | 139 SY | $1.00 | $1.00 | $0.01 | $0.16 | $3.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.38 TON | $1,000 | $700 | $450 | $494 | $800 |
| 659E31000 LIME | 0.57 ACRE | $100 | $170 | $200 | $89.51 | $200 |
| 659E35000 WATER | 20 MGAL | $1.00 | $2.00 | $1.00 | $1.00 | $24.00 |
| 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS | 41 FT | $20.00 | $15.00 | $32.50 | $29.50 | $30.00 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 3 EACH | $275 | $310 | $650 | $351 | $450 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 622E10161 CONCRETE BARRIER, SINGLE SLOPE, TYPE D, AS PER PLA | 508 FT | $120 | $61k | 25% |
| 622E10161 CONCRETE BARRIER, SINGLE SLOPE, TYPE D, AS PER PLA | 428 FT | $135 | $58k | 24% |
| 608E10000 4" CONCRETE WALK | 2,258 SF | $7 | $16k | 6% |
| 624E10000 MOBILIZATION | 1 LS | $15,000 | $15k | 6% |
| 659E10000 SEEDING AND MULCHING | 2,771 SY | $4 | $11k | 5% |
| 659E00300 TOPSOIL | 308 CY | $30 | $9k | 4% |
| 605E14020 6" BASE PIPE UNDERDRAINS WITH GEOTEXTILE FABRIC | 458 FT | $20 | $9k | 4% |
| 304E20000 AGGREGATE BASE | 70 CY | $130 | $9k | 4% |
| 202E30000 WALK REMOVED | 2,258 SF | $3 | $7k | 3% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $6,500 | $7k | 3% |