ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 11 more items below.
| Item | Quantity | R1Parker Corporation | R2Amaazz Construction Ohio LLC | R3Skeens Excavating INC | R4Shelly & Sands INC | R5Alan Stone CO INC | % of bid |
|---|---|---|---|---|---|---|---|
| 601E26001 DUMPED ROCK FILL, TYPE B, AS PER PLAN | 874 CY | $75.00 | $68.00 | $80.00 | $104 | $92.00 | 53% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $10,000 | $8,900 | $22,000 | $35,100 | $48,400 | 8% |
| 253E02001 PAVEMENT REPAIR, AS PER PLAN | 20 CY | $300 | $430 | $450 | $782 | $830 | 5% |
| 203E35121 GRANULAR MATERIAL, TYPE C, AS PER PLAN | 85 CY | $70.00 | $82.00 | $100 | $85.00 | $77.00 | 5% |
| 203E10000 EXCAVATION | 219 CY | $20.00 | $10.75 | $40.00 | $23.00 | $23.00 | 4% |
| 606E15050 GUARDRAIL, TYPE MGS | 112.5 FT |
| Item | Quantity | R1Parker Corporation | R2Amaazz Construction Ohio LLC | R3Skeens Excavating INC | R4Shelly & Sands INC | R5Alan Stone CO INC |
|---|---|---|---|---|---|---|
| 202E32600 GUTTER REMOVED | 30 FT | $10.00 | $20.00 | $70.00 | $19.00 | $15.00 |
| 202E38000 GUARDRAIL REMOVED | 112.5 FT | $2.00 | $2.50 | $3.00 | $6.00 | $17.00 |
| 690E50350 SPECIAL - MAILBOX REMOVED AND RESET | 1 EACH | $100 | $270 | $200 | $235 | $250 |
| 659E10000 SEEDING AND MULCHING | 169 SY | $1.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $35.00 |
| $32.50 |
| $50.00 |
| $31.20 |
| $33.00 |
| 3% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $3,000 | $15,000 | $10,000 | $6,500 | $1,500 | 2% |
| 832E30000 EROSION CONTROL | 3,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 2% |
| 614E12338 WORK ZONE IMPACT ATTENUATOR (BIDIRECTIONAL) | 2 EACH | $1,500 | $2,850 | $2,100 | $2,685 | $2,900 | 2% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $3,000 | $4,100 | $4,000 | $5,500 | $4,800 | 2% |
| 624E10000 MOBILIZATION | 1 LS | $3,000 | $12,997 | $12,000 | $10,000 | $25,000 | 2% |
| 203E20000 EMBANKMENT | 143 CY | $20.00 | $21.50 | $50.00 | $25.00 | $10.00 | 2% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 230 FT | $10.00 | $22.50 | $30.00 | $34.00 | $22.00 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $2,000 | $1,105 | $3,000 | $1,200 | $4,500 | 2% |
| 611E05701 15" CONDUIT, TYPE A, AS PER PLAN-706.02 | 17 FT | $103 | $148 | $700 | $204 | $260 | 1% |
| 304E20000 AGGREGATE BASE | 10 CY | $100 | $230 | $100 | $114 | $120 | 1% |
| 601E26000 DUMPED ROCK FILL, TYPE B | 11 CY | $75.00 | $107 | $100 | $150 | $170 | 1% |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.02 MILE | $30,000 | $43,500 | $80,000 | $42,575 | $44,700 | 0% |
| 614E21000 WORK ZONE CENTER LINE, CLASS I | 0.2 MILE | $3,000 | $4,100 | $10,000 | $4,012 | $4,300 | 0% |
| 614E22010 WORK ZONE EDGE LINE, CLASS I, 6" | 0.08 MILE | $7,500 | $9,250 | $15,000 | $8,500 | $9,000 | 0% |
| $15.00 |
| $3.00 |
| $14.00 |
| $7.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.02 TON | $12,500 | $650 | $500 | $605 | $730 |
| 659E31000 LIME | 0.04 ACRE | $6,250 | $80.00 | $500 | $75.00 | $840 |
| 659E35000 WATER | 1 MGAL | $0.50 | $1.00 | $10.00 | $1.00 | $21.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (BIDIRECTIONAL) | 3 EACH | $10.00 | $11.00 | $20.00 | $10.00 | $11.00 |
| 614E13310 BARRIER REFLECTOR, TYPE 1 (BIDIRECTIONAL) | 6 EACH | $10.00 | $35.00 | $20.00 | $11.00 | $40.00 |
| 614E13360 OBJECT MARKER, TWO WAY | 6 EACH | $10.00 | $60.00 | $20.00 | $17.00 | $42.00 |
| 614E26000 WORK ZONE STOP LINE, CLASS I | 24 FT | $10.00 | $17.00 | $25.00 | $16.00 | $17.00 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 601E26001 DUMPED ROCK FILL, TYPE B, AS PER PLAN | 874 CY | $75 | $66k | 52% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $10,000 | $10k | 8% |
| 253E02001 PAVEMENT REPAIR, AS PER PLAN | 20 CY | $300 | $6k | 5% |
| 203E35121 GRANULAR MATERIAL, TYPE C, AS PER PLAN | 85 CY | $70 | $6k | 5% |
| 203E10000 EXCAVATION | 219 CY | $20 | $4k | 4% |
| 606E15050 GUARDRAIL, TYPE MGS | 112.5 FT | $35 | $4k | 3% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $3,000 | $3k | 2% |
| 832E30000 EROSION CONTROL | 3,000 EACH | $1 | $3k | 2% |
| 614E12338 WORK ZONE IMPACT ATTENUATOR (BIDIRECTIONAL) | 2 EACH | $1,500 | $3k | 2% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $3,000 | $3k | 2% |