BEL-SR 647-02.70
BEL County · est $0.3M
Bid dateThursday, May 21—
BEL County · est $0.3M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 39 more items below.
| Item | Quantity | R1Nls Paving, INC | R2Tucson INC | R3Ohio-west Virginia Excavating CO | R4Buds INC | R5Shelly & Sands INC | R6R C Construction Company And Son INC | % of bid |
|---|---|---|---|---|---|---|---|---|
| 611E08900 21" CONDUIT, TYPE B | 780 FT | $65.00 | $80.00 | $106 | $93.00 | $100 | $195 | 22% |
| 606E15201 GUARDRAIL, TYPE MGS HALF POST SPACING WITH LONG PO | 837.5 FT | $30.00 | $30.00 | $33.20 | $28.75 | $28.50 | $45.00 | 11% |
| 609E12001 COMBINATION CURB AND GUTTER, TYPE 2, AS PER PLAN | 934 FT | $24.00 | $21.00 | $25.50 | $27.50 |
| Item | Quantity | R1Nls Paving, INC | R2Tucson INC | R3Ohio-west Virginia Excavating CO | R4Buds INC | R5Shelly & Sands INC | R6R C Construction Company And Son INC |
|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $1,300 | $7,500 | $3,450 | $1,000 | $8,950 | $3,500 |
| 202E32000 CURB REMOVED | 934 FT | $1.65 | $1.00 | $4.00 | $9.00 | $3.25 | $10.00 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 42 FT | $61.00 | $16.00 | $53.00 | $19.00 | $4.00 | $50.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $28.25 |
| $55.00 |
| 10% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 80 CY | $225 | $260 | $190 | $250 | $298 | $495 | 8% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 102 CY | $175 | $216 | $188 | $205 | $229 | $425 | 8% |
| 624E10000 MOBILIZATION | 1 LS | $12,000 | $16,000 | $15,150 | $10,000 | $10,000 | $15,000 | 5% |
| 304E20000 AGGREGATE BASE | 134 CY | $80.00 | $105 | $85.00 | $121 | $105 | $175 | 5% |
| 203E10000 EXCAVATION | 306 CY | $35.00 | $35.00 | $19.00 | $23.00 | $31.00 | $40.00 | 5% |
| 611E99574 MANHOLE, NO. 3 | 4 EACH | $2,425 | $2,100 | $3,400 | $2,250 | $2,995 | $6,500 | 4% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (33 CY | $240 | $265 | $192 | $260 | $258 | $495 | 3% |
| 611E98180 CATCH BASIN, NO. 3A | 3 EACH | $2,250 | $2,500 | $3,445 | $2,750 | $3,000 | $4,500 | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $6,000 | $6,500 | $8,200 | $4,500 | $3,000 | $45,000 | 3% |
| 614E12420 DETOUR SIGNING | 1 LS | $5,500 | $2,450 | $5,580 | $6,000 | $2,500 | $15,000 | 2% |
| 642E00300 CENTER LINE, TYPE 1 | 3.6 MILE | $1,450 | $1,850 | $1,465 | $1,400 | $1,375 | $1,875 | 2% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1 1/4" | 1,538 SY | $3.30 | $6.50 | $3.50 | $6.00 | $6.00 | $30.00 | 2% |
| 611E04400 12" CONDUIT, TYPE B | 27 FT | $180 | $60.00 | $123 | $90.00 | $125 | $185 | 2% |
| 611E98510 CATCH BASIN, NO. 2-3 | 2 EACH | $2,400 | $2,100 | $3,075 | $2,250 | $2,850 | $5,500 | 2% |
| 202E23010 PAVEMENT REMOVED, ASPHALT | 622 SY | $6.45 | $10.00 | $7.50 | $17.00 | $8.00 | $20.00 | 2% |
| 659E00300 TOPSOIL | 69 CY | $45.00 | $60.00 | $35.00 | $35.00 | $48.00 | $50.00 | 1% |
| 621E00100 RPM | 12 EACH | $250 | $351 | $250 | $325 | $325 | $650 | 1% |
| 202E38000 GUARDRAIL REMOVED | 838 FT | $3.25 | $5.50 | $2.00 | $4.50 | $5.00 | $5.00 |
| 202E42000 ANCHOR ASSEMBLY REMOVED, TYPE A | 1 EACH | $755 | $350 | $260 | $300 | $300 | $500 |
| 202E58100 CATCH BASIN REMOVED | 2 EACH | $875 | $500 | $1,090 | $500 | $220 | $500 |
| 202E70000 SPECIAL - FILL AND PLUG EXISTING CONDUIT | 37 FT | $32.00 | $80.00 | $109 | $76.00 | $83.00 | $195 |
| 202E98200 REMOVAL MISC.: RETAINING WALL | 8 FT | $110 | $90.00 | $109 | $100 | $166 | $850 |
| 203E20000 EMBANKMENT | 3 CY | $215 | $30.00 | $252 | $100 | $50.00 | $20.00 |
| 204E10000 SUBGRADE COMPACTION | 718 SY | $0.50 | $1.00 | $2.00 | $3.00 | $2.00 | $2.00 |
| 204E45000 PROOF ROLLING | 1 HOUR | $130 | $125 | $261 | $80.00 | $205 | $50.00 |
| 606E25550 ANCHOR ASSEMBLY, MGS TYPE A | 1 EACH | $1,250 | $1,600 | $1,300 | $1,520 | $1,500 | $1,850 |
| 601E27000 DUMPED ROCK FILL, TYPE C | 33 CY | $84.00 | $100 | $87.00 | $115 | $101 | $175 |
| 601E32104 ROCK CHANNEL PROTECTION, TYPE B WITH GEOTEXTILE FA | 2 CY | $240 | $175 | $185 | $135 | $468 | $175 |
| 659E10000 SEEDING AND MULCHING | 617 SY | $4.50 | $3.00 | $2.00 | $5.00 | $3.00 | $5.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.14 TON | $300 | $800 | $1,500 | $700 | $598 | $1,200 |
| 659E31000 LIME | 0.13 ACRE | $80.00 | $200 | $2,300 | $200 | $151 | $800 |
| 659E35000 WATER | 4 MGAL | $4.00 | $1.00 | $460 | $1.00 | $1.00 | $1.00 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 602E20000 CONCRETE MASONRY | 0.4 CY | $1,250 | $2,000 | $2,450 | $3,000 | $2,400 | $2,500 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 962 FT | $3.00 | $3.25 | $3.50 | $3.50 | $2.50 | $30.00 |
| 407E10000 TACK COAT | 198 GAL | $2.00 | $2.00 | $4.00 | $2.00 | $2.00 | $10.00 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 12 EACH | $30.00 | $25.00 | $60.00 | $10.00 | $6.00 | $50.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (BIDIRECTIONAL) | 13 EACH | $8.75 | $9.00 | $9.00 | $8.00 | $8.50 | $20.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 23 FT | $16.00 | $16.00 | $16.00 | $15.00 | $15.00 | $40.00 |
| 630E08600 SIGN POST REFLECTOR | 1 EACH | $50.00 | $54.00 | $48.00 | $50.00 | $50.00 | $150 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 3 EACH | $80.00 | $75.00 | $80.00 | $65.00 | $65.00 | $175 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 2 EACH | $16.00 | $27.00 | $16.00 | $10.00 | $25.00 | $50.00 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.36 MILE | $2,100 | $4,500 | $2,125 | $2,000 | $2,000 | $12,500 |
| 642E00300 CENTER LINE, TYPE 1 | 0.18 MILE | $4,250 | $5,900 | $4,250 | $4,000 | $4,000 | $12,500 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1 1/4" | 250 SY | $4.00 | $6.50 | $3.80 | $6.00 | $6.25 | $10.00 |
| 407E10000 TACK COAT | 12 GAL | $2.00 | $2.00 | $8.50 | $2.00 | $3.00 | $10.00 |
| 411E10000 STABILIZED CRUSHED AGGREGATE | 30 CY | $80.00 | $120 | $101 | $135 | $95.00 | $20.00 |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 10 CY | $300 | $260 | $242 | $350 | $225 | $160 |
| 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT | 0.18 MILE | $4,400 | $5,900 | $4,500 | $4,200 | $4,200 | $4,500 |
| 614E22110 WORK ZONE EDGE LINE, CLASS I, 6", 642 PAINT | 0.36 MILE | $2,300 | $4,400 | $2,400 | $2,300 | $2,250 | $4,500 |
| 616E10000 WATER | 1 MGAL | $4.00 | $1.00 | $460 | $1.00 | $70.00 | $1.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $1,000 | $5,000 | $4,730 | $4,500 | $2,000 | $20,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $1,200 | $5,000 | $1,600 | $4,500 | $4,500 | $12,500 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 611E08900 21" CONDUIT, TYPE B | 780 FT | $65 | $51k | 19% |
| 606E15201 GUARDRAIL, TYPE MGS HALF POST SPACING WITH LONG PO | 837.5 FT | $30 | $25k | 9% |
| 609E12001 COMBINATION CURB AND GUTTER, TYPE 2, AS PER PLAN | 934 FT | $24 | $22k | 8% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 80 CY | $225 | $18k | 7% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 102 CY | $175 | $18k | 7% |
| 624E10000 MOBILIZATION | 1 LS | $12,000 | $12k | 4% |
| 304E20000 AGGREGATE BASE | 134 CY | $80 | $11k | 4% |
| 203E10000 EXCAVATION | 306 CY | $35 | $11k | 4% |
| 611E99574 MANHOLE, NO. 3 | 4 EACH | $2,425 | $10k | 4% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (33 CY | $240 | $8k | 3% |