BUT-IR 75-00.00
BUT County · est $7.2M
Bid dateThursday, November 19—
BUT County · est $7.2M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 7.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 20 more items below.
| Item | Quantity | R1John R Jurgensen Company | R2Barrett Paving Materials INC | % of bid |
|---|---|---|---|---|
| 442E10300 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 25,021 CY | $167 | $155 | 53% |
| 255E10500 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT, | 980 SY | $956 | $600 | 12% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 2" | 450,365 SY | $1.56 | $2.00 | 9% |
| 253E02000 PAVEMENT REPAIR (B) LONGITUDINAL JOINTS | 2,157 CY | $264 | $325 | 7% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $406,211 | $822,000 | 5% |
| 624E10000 MOBILIZATION | 1 LS | $200,000 | $50,000 | 3% |
| 256E10200 BONDED PATCHING OF PORTLAND CEMENT CONCRETE PAVEME | 2,240 SF | $65.00 | $65.00 | 2% |
| 407E20000 |
| Item | Quantity | R1John R Jurgensen Company | R2Barrett Paving Materials INC |
|---|---|---|---|
| 255E20000 FULL DEPTH PAVEMENT SAWING | 2,944 FT | $5.03 | $6.00 |
| 618E40600 RUMBLE STRIPS, SHOULDER (ASPHALT CONCRETE) | 16.2 MILE | $785 | $788 |
| 642E00114 EDGE LINE, 6", TYPE 1A | 25.5 MILE | $350 | $350 |
| 642E00214 LANE LINE, 6", TYPE 1A | 34.48 MILE | $230 | $230 |
| 642E00414 CHANNELIZING LINE, 12", TYPE 1A | 6,050 FT | $0.55 | $0.55 |
| 642E01516 DOTTED LINE, 6", TYPE 1A | 6,392 FT | $0.45 | $0.45 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 40,533 GAL |
| $3.50 |
| $3.25 |
| 2% |
| 442E00100 ANTI-SEGREGATION EQUIPMENT | 17,825 CY | $6.53 | $16.00 | 1% |
| 258E10000 RETROFIT DOWEL BAR | 702 EACH | $165 | $168 | 1% |
| 257E10000 DIAMOND GRINDING PORTLAND CEMENT CONCRETE PAVEMENT | 24,800 SY | $4.13 | $5.55 | 1% |
| 253E02000 PAVEMENT REPAIR (A) | 200 CY | $394 | $600 | 1% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 600 HOUR | $98.00 | $100 | 1% |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 30.83 MILE | $1,105 | $1,635 | 0% |
| 621E00100 RPM | 1,596 EACH | $20.75 | $20.75 | 0% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $28,003 | $25,000 | 0% |
| 614E20560 WORK ZONE LANE LINE, CLASS III, 6", 642 PAINT | 24.16 MILE | $935 | $1,460 | 0% |
| 254E01600 PATCHING PLANED SURFACE | 4,514 SY | $4.84 | $3.00 | 0% |
| 614E20110 WORK ZONE LANE LINE, CLASS I, 6", 642 PAINT | 11 MILE | $1,945 | $3,775 | 0% |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 1,596 EACH | $12.82 | $8.00 | 0% |
| 2,230 FT |
| $0.50 |
| $0.50 |
| 644E00500 STOP LINE | 110 FT | $4.65 | $4.65 |
| 644E00720 CHEVRON MARKING | 332 FT | $4.50 | $4.50 |
| 644E01300 LANE ARROW | 20 EACH | $75.00 | $75.00 |
| 644E40000 SPEED MEASUREMENT MARKING | 27 EACH | $431 | $150 |
| 814E00010 INTERSTATE ELONGATED ROUTE SHIELD SYMBOL MARKING, | 4 EACH | $3,100 | $3,100 |
| 814E00016 CARDINAL DIRECTION (NORTH, SOUTH, WEST & EAST) MAR | 4 EACH | $1,100 | $1,100 |
| 614E23690 WORK ZONE CHANNELIZING LINE, CLASS III, 12", 642 P | 6,050 FT | $0.75 | $0.75 |
| 614E24610 WORK ZONE DOTTED LINE, CLASS III, 4", 642 PAINT, 1 | 1,935 FT | $0.70 | $0.70 |
| 614E24610 WORK ZONE DOTTED LINE, CLASS III, 4", 642 PAINT, 6 | 5,970 FT | $0.65 | $0.65 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 110 FT | $2.50 | $2.50 |
| 614E30650 WORK ZONE ARROW, CLASS III, 642 PAINT | 20 EACH | $55.00 | $55.00 |
| 808E18700 DIGITAL SPEED LIMIT (DSL) SIGN ASSEMBLY | 12 SNMT | $875 | $875 |
| 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P | 1 LS | $11,259 | $25,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 442E10300 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 25,021 CY | $166.55 | $4.17M | 52% |
| 255E10500 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT, | 980 SY | $955.81 | $937k | 12% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 2" | 450,365 SY | $1.56 | $703k | 9% |
| 253E02000 PAVEMENT REPAIR (B) LONGITUDINAL JOINTS | 2,157 CY | $264.04 | $570k | 7% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $406,211 | $406k | 5% |
| 624E10000 MOBILIZATION | 1 LS | $200,000 | $200k | 2% |
| 256E10200 BONDED PATCHING OF PORTLAND CEMENT CONCRETE PAVEME | 2,240 SF | $65 | $146k | 2% |
| 407E20000 NON-TRACKING TACK COAT | 40,533 GAL | $3.5 | $142k | 2% |
| 442E00100 ANTI-SEGREGATION EQUIPMENT | 17,825 CY | $6.53 | $116k | 1% |
| 258E10000 RETROFIT DOWEL BAR | 702 EACH | $165.23 | $116k | 1% |