GEA-SR 166-01.08
GEA County · est $0.2M
Bid dateThursday, January 14—
GEA County · est $0.2M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 8%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 38 more items below.
| Item | Quantity | R1Platform Cement | R2Woodford Excavating LLC | R3Grade Line INC | R4Catts Construction INC | R5Eclipse CO LLC | R6Union Industrial Contractors INC | R7Jet Excavating Company | R8S E T INC | R9Marucci & Gaffney Excavating CO | R10Nerone & Sons INC | % of bid |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 611E99910 DRAINAGE STRUCTURE, MISC.:, 9' X 4' CONDUIT, TYPE | 42 FT | $475 | $990 | $830 | $959 | $1,049 | $1,154 | $1,125 | $1,133 | $950 | $1,000 | 13% |
| 832E30000 |
| Item | Quantity | R1Platform Cement | R2Woodford Excavating LLC | R3Grade Line INC | R4Catts Construction INC | R5Eclipse CO LLC | R6Union Industrial Contractors INC | R7Jet Excavating Company | R8S E T INC | R9Marucci & Gaffney Excavating CO | R10Nerone & Sons INC |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 203E20000 EMBANKMENT | 75 CY | $35.00 | $10.00 | $23.50 | $39.85 | $34.00 | $50.00 | $35.00 | $20.00 | $25.00 | $58.00 |
| 606E15350 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 19,739 EACH |
| $1.00 |
| $1.00 |
| $1.00 |
| $1.00 |
| $1.00 |
| $1.00 |
| $1.00 |
| $1.00 |
| $1.00 |
| $1.00 |
| 13% |
| 511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 7.1 CY | $2,000 | $1,800 | $1,600 | $1,975 | $2,006 | $1,750 | $1,650 | $2,218 | $1,500 | $1,620 | 9% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, MASH 2016 | 3 EACH | $4,200 | $2,600 | $2,450 | $2,812 | $2,548 | $2,450 | $2,500 | $2,705 | $2,600 | $2,520 | 8% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 23 CY | $500 | $300 | $770 | $676 | $661 | $558 | $650 | $1,045 | $600 | $1,170 | 8% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 32 CY | $311 | $235 | $214 | $333 | $216 | $214 | $275 | $235 | $280 | $283 | 7% |
| 630E97800 SIGNING, MISC.: ADDITIONAL SIGNS, GROUND MOUNTED, | 300 SF | $25.00 | $10.00 | $15.00 | $1.00 | $9.00 | $8.50 | $10.00 | $16.50 | $27.00 | $9.00 | 5% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 20 CY | $370 | $444 | $404 | $500 | $406 | $404 | $500 | $444 | $350 | $343 | 5% |
| 202E11000 STRUCTURE REMOVED | 1 LS | $5,000 | $2,500 | $5,300 | $975 | $10,093 | $4,500 | $7,500 | $1,500 | $7,500 | $3,400 | 3% |
| 503E21301 UNCLASSIFIED EXCAVATION, AS PER PLAN | 1 LS | $5,000 | $4,550 | $2,325 | $20,575 | $9,985 | $17,500 | $7,500 | $5,165 | $7,500 | $26,000 | 3% |
| 619E16000 FIELD OFFICE, TYPE A | 2 MNTH | $2,500 | $250 | $2,000 | $250 | $420 | $1,250 | $500 | $1,624 | $850 | $2,100 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $5,000 | $7,200 | $6,500 | $3,700 | $14,440 | $10,000 | $18,000 | $19,123 | $10,000 | $28,000 | 3% |
| 659E00300 TOPSOIL | 82 CY | $52.00 | $40.00 | $48.00 | $53.00 | $71.00 | $66.00 | $45.00 | $67.25 | $25.00 | $71.00 | 3% |
| 203E10000 EXCAVATION | 157 CY | $25.00 | $10.00 | $22.50 | $23.00 | $24.00 | $34.00 | $30.00 | $20.00 | $15.00 | $43.00 | 3% |
| 512E33000 TYPE 2 WATERPROOFING | 129 SY | $30.00 | $15.80 | $15.00 | $19.00 | $19.00 | $25.00 | $22.00 | $17.35 | $25.00 | $28.00 | 3% |
| 659E10000 SEEDING AND MULCHING | 738 SY | $5.00 | $8.60 | $2.00 | $2.00 | $2.50 | $1.00 | $2.00 | $4.95 | $2.00 | $3.00 | 2% |
| 614E12420 DETOUR SIGNING | 1 LS | $3,500 | $2,595 | $2,125 | $1,911 | $2,496 | $2,400 | $2,500 | $5,198 | $10,000 | $2,500 | 2% |
| 606E15050 GUARDRAIL, TYPE MGS | 150 FT | $21.00 | $17.00 | $15.80 | $24.00 | $16.50 | $15.80 | $22.00 | $18.38 | $22.00 | $17.00 | 2% |
| 304E20000 AGGREGATE BASE | 48 CY | $65.00 | $75.00 | $68.40 | $70.00 | $76.50 | $100 | $85.00 | $74.30 | $80.00 | $91.00 | 2% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $3,000 | $1,450 | $500 | $6,295 | $4,134 | $4,500 | $1,500 | $5,000 | $7,500 | $900 | 2% |
| 6.5 FT |
| $210 |
| $135 |
| $120 |
| $230 |
| $125 |
| $120 |
| $130 |
| $133 |
| $210 |
| $130 |
| 606E17360 GUARDRAIL, TYPE MGS, LONG-SPAN | 37.5 FT | $26.00 | $19.00 | $16.95 | $29.60 | $17.50 | $16.95 | $18.00 | $19.65 | $27.00 | $18.00 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 1 EACH | $950 | $1,000 | $925 | $1,176 | $962 | $925 | $975 | $1,028 | $1,060 | $950 |
| 623E38500 MONUMENT ASSEMBLY | 5 EACH | $400 | $500 | $1,455 | $1,322 | $1,177 | $750 | $1,100 | $324 | $900 | $1,410 |
| 690E50000 SPECIAL - MAILBOX SUPPORT | 1 EACH | $215 | $250 | $240 | $82.25 | $123 | $250 | $250 | $215 | $250 | $220 |
| 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER | 5.6 CY | $75.00 | $250 | $165 | $302 | $119 | $200 | $195 | $232 | $250 | $236 |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 15.5 CY | $70.00 | $180 | $165 | $222 | $116 | $220 | $135 | $104 | $150 | $210 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $50.00 | $150 | $20.00 | $50.00 | $208 | $100 | $25.00 | $165 | $50.00 | $103 |
| 659E14000 REPAIR SEEDING AND MULCHING | 37 SY | $1.50 | $2.00 | $0.50 | $0.01 | $2.50 | $5.00 | $1.00 | $0.44 | $0.80 | $3.00 |
| 659E15000 INTER-SEEDING | 37 SY | $1.50 | $2.00 | $0.50 | $0.01 | $2.50 | $1.00 | $1.00 | $0.11 | $0.50 | $3.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.17 TON | $1,500 | $1,750 | $400 | $900 | $1,872 | $800 | $750 | $275 | $275 | $1,850 |
| 659E31000 LIME | 0.15 ACRE | $300 | $300 | $80.00 | $1,100 | $1,479 | $1.00 | $500 | $293 | $110 | $1,460 |
| 659E35000 WATER | 2 MGAL | $100 | $150 | $50.00 | $8.00 | $187 | $1.00 | $1.00 | $51.25 | $1.00 | $185 |
| 605E31100 AGGREGATE DRAINS | 22 FT | $12.50 | $35.00 | $10.00 | $16.00 | $15.00 | $50.00 | $30.00 | $19.85 | $35.00 | $17.00 |
| 204E10000 SUBGRADE COMPACTION | 180 SY | $2.00 | $8.00 | $2.00 | $1.00 | $3.50 | $3.00 | $3.00 | $2.00 | $5.00 | $2.50 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 3" | 80 SY | $36.00 | $24.50 | $22.00 | $52.00 | $23.00 | $22.00 | $26.00 | $24.20 | $31.50 | $32.00 |
| 407E10000 TACK COAT | 25 GAL | $5.00 | $5.00 | $2.50 | $3.50 | $2.50 | $2.50 | $2.50 | $2.75 | $10.50 | $6.00 |
| 441E50400 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448) | — | $400 | $444 | $404 | $500 | $406 | $404 | $425 | $444 | $420 | $395 |
| 617E10100 COMPACTED AGGREGATE | 5 CY | $200 | $100 | $236 | $98.00 | $154 | $250 | $200 | $156 | $100 | $222 |
| 617E20000 SHOULDER PREPARATION | 54 SY | $13.00 | $20.00 | $16.30 | $12.00 | $11.00 | $30.00 | $25.00 | $21.11 | $15.00 | $20.00 |
| 620E00500 DELINEATOR, POST GROUND MOUNTED | 3 EACH | $65.00 | $60.00 | $85.00 | $75.00 | $57.00 | $100 | $90.00 | $71.50 | $71.00 | $150 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, BIDIRECTIONAL | 6 EACH | $8.00 | $9.00 | $8.00 | $8.50 | $8.50 | $8.00 | $12.00 | $8.80 | $9.00 | $15.00 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 30 FT | $20.00 | $21.60 | $35.20 | $17.50 | $21.00 | $20.00 | $38.00 | $16.50 | $21.00 | $25.00 |
| 630E80100 SIGN, FLAT SHEET | 12 SF | $53.00 | $16.00 | $37.52 | $23.00 | $14.50 | $14.00 | $40.00 | $22.00 | $56.00 | $15.00 |
| 646E10010 EDGE LINE, 6" | 0.04 MILE | $50,000 | $48,600 | $53,630 | $81,207 | $104,000 | $45,000 | $55,000 | $49,500 | $105,000 | $103,000 |
| 646E10200 CENTER LINE | 0.02 MILE | $65,000 | $80,000 | $92,800 | $135,350 | $104,312 | $75,000 | $95,000 | $82,500 | $105,500 | $103,000 |
| 616E10000 WATER | 1 MGAL | $250 | $150 | $50.00 | $8.00 | $91.50 | $1.00 | $1.00 | $51.25 | $1.00 | $600 |
| 509E10000 EPOXY COATED REINFORCING STEEL | 3,375 LB | $0.50 | $1.00 | $1.50 | $1.60 | $2.00 | $2.00 | $2.50 | $1.10 | $3.60 | $2.00 |
| 511E46610 CLASS QC1 CONCRETE, HEADWALL | 1.29 CY | $1,200 | $290 | $1,070 | $796 | $1,179 | $1,250 | $750 | $716 | $750 | $640 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 53 SY | $20.00 | $60.00 | $19.00 | $21.25 | $20.50 | $50.00 | $25.00 | $55.00 | $38.00 | $53.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 32 SF | $8.00 | $10.00 | $7.50 | $2.00 | $5.00 | $10.00 | $10.00 | $11.00 | $12.00 | $10.00 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 34 CY | $50.00 | $75.00 | $104 | $232 | $99.00 | $115 | $115 | $73.35 | $85.00 | $35.00 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 112 FT | $10.50 | $12.00 | $14.00 | $6.00 | $15.00 | $17.00 | $12.00 | $13.38 | $15.00 | $10.00 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 19 FT | $10.50 | $12.00 | $14.00 | $3.40 | $27.00 | $17.00 | $20.00 | $13.32 | $20.00 | $15.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $2,200 | $2,500 | $3,230 | $2,600 | $3,889 | $2,500 | $7,000 | $3,625 | $2,500 | $2,100 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $1,500 | $1,500 | $1,645 | $3,000 | $2,784 | $2,500 | $3,500 | $1,810 | $10,000 | $3,600 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $3,000 | $2,500 | $2,000 | $2,101 | $3,400 | $5,000 | $3,500 | $7,812 | $10,000 | $6,200 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 611E99910 DRAINAGE STRUCTURE, MISC.:, 9' X 4' CONDUIT, TYPE | 42 FT | $475 | $20k | 11% |
| 832E30000 EROSION CONTROL | 19,739 EACH | $1 | $20k | 10% |
| 511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 7.1 CY | $2,000 | $14k | 8% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, MASH 2016 | 3 EACH | $4,200 | $13k | 7% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 23 CY | $500 | $12k | 6% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 32 CY | $311 | $10k | 5% |
| 630E97800 SIGNING, MISC.: ADDITIONAL SIGNS, GROUND MOUNTED, | 300 SF | $25 | $8k | 4% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 20 CY | $370 | $7k | 4% |
| 202E11000 STRUCTURE REMOVED | 1 LS | $5,000 | $5k | 3% |
| 503E21301 UNCLASSIFIED EXCAVATION, AS PER PLAN | 1 LS | $5,000 | $5k | 3% |