POR-D04 POR IR-76 RA Parking Lots
POR County · est $4.2M
Bid dateThursday, January 28—
POR County · est $4.2M
Published by ODOTon this contract’s Proposal PDF · EDGE Goal: 6.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 97 more items below.
| Item | Quantity | R1Karvo Companies INC | R2Catts Construction INC | R3Shelly & Sands INC | R4Marucci & Gaffney Excavating CO | R5A P O'horo Company | R6Ruhlin Company | R7Tri-mor CORP | R8Perk Company INC | R9Great Lakes Construction CO | R10Lockhart Concrete CO | % of bid |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 451E14020 9" REINFORCED CONCRETE PAVEMENT, CLASS QC 1P WITH | 18,596 SY | $61.35 | $60.72 | $66.00 | $69.50 | $74.00 | $71.25 | $65.00 | $70.75 | $64.00 | $78.00 | 47% |
| Item | Quantity | R1Karvo Companies INC | R2Catts Construction INC | R3Shelly & Sands INC | R4Marucci & Gaffney Excavating CO | R5A P O'horo Company | R6Ruhlin Company | R7Tri-mor CORP | R8Perk Company INC | R9Great Lakes Construction CO | R10Lockhart Concrete CO |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $28,000 | $20,000 | $15,000 | $25,000 | $70,000 | $25,000 | $35,000 | $20,000 | $85,000 | $45,000 |
| 202E30000 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 4,069 CY |
| $50.50 |
| $54.75 |
| $49.00 |
| $49.00 |
| $50.00 |
| $60.00 |
| $64.00 |
| $60.00 |
| $55.00 |
| $55.00 |
| 8% |
| 203E10000 EXCAVATION | 8,268 CY | $14.00 | $15.50 | $11.00 | $13.00 | $18.00 | $9.00 | $13.00 | $8.00 | $12.50 | $12.00 | 5% |
| 204E30020 GRANULAR MATERIAL, TYPE C | 3,255 CY | $32.00 | $8.00 | $30.00 | $35.00 | $43.00 | $44.25 | $50.00 | $55.00 | $45.00 | $38.00 | 4% |
| 202E23000 PAVEMENT REMOVED | 11,425 SY | $7.00 | $5.25 | $6.00 | $9.94 | $4.00 | $7.50 | $6.00 | $6.00 | $5.00 | $9.00 | 3% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 660 CY | $120 | $158 | $160 | $120 | $121 | $121 | $152 | $136 | $138 | $127 | 3% |
| 442E10001 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 382 CY | $188 | $211 | $231 | $188 | $212 | $212 | $200 | $200 | $180 | $212 | 3% |
| 609E28000 CURB, TYPE 7 | 4,513 FT | $14.35 | $17.00 | $20.00 | $18.00 | $14.05 | $13.00 | $14.00 | $17.15 | $20.00 | $27.00 | 3% |
| 625E10490 LIGHT POLE, CONVENTIONAL, DESIGN AT6B40 | 24 EACH | $2,550 | $2,500 | $2,645 | $2,500 | $2,550 | $1,975 | $2,395 | $1,975 | $2,550 | $1,975 | 3% |
| 625E13500 LIGHT TOWER, MISC.: LIGHT TOWER, BBBB45 | 4 EACH | $15,000 | $16,259 | $15,800 | $15,000 | $15,000 | $13,100 | $15,600 | $13,225 | $15,000 | $13,225 | 2% |
| 624E10000 MOBILIZATION | 1 LS | $58,500 | $29,000 | $100,000 | $100,000 | $100,000 | $100,000 | $35,000 | $66,000 | $116,000 | $44,290 | 2% |
| 625E15100 LIGHT TOWER FOUNDATION, 36" X 20' DEEP | 7 EACH | $7,500 | $12,621 | $7,600 | $7,250 | $7,500 | $7,140 | $12,000 | $7,300 | $7,500 | $7,300 | 2% |
| 611E04400 12" CONDUIT, TYPE B | 756 FT | $68.00 | $64.50 | $65.00 | $70.00 | $48.00 | $68.00 | $74.00 | $57.50 | $85.00 | $62.00 | 2% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $48,980 | $19,000 | $38,500 | $40,000 | $35,000 | $25,150 | $20,500 | $18,600 | $65,000 | $37,950 | 2% |
| 625E13500 LIGHT TOWER, MISC.: LIGHT TOWER, BB45 | 3 EACH | $15,000 | $16,129 | $15,800 | $15,000 | $15,000 | $13,000 | $15,500 | $13,125 | $15,000 | $13,125 | 2% |
| 611E05900 15" CONDUIT, TYPE B | 604 FT | $74.00 | $68.00 | $72.00 | $84.00 | $61.00 | $63.00 | $94.00 | $94.00 | $108 | $65.00 | 2% |
| 204E13000 EXCAVATION OF SUBGRADE, 16" DEPTH | 3,255 CY | $13.25 | $6.00 | $6.00 | $19.00 | $12.50 | $17.00 | $16.00 | $17.00 | $23.50 | $12.00 | 2% |
| 659E00300 TOPSOIL | 1,424 CY | $30.00 | $49.00 | $25.00 | $24.00 | $15.00 | $27.59 | $28.00 | $40.00 | $30.00 | $38.75 | 2% |
| 832E30000 EROSION CONTROL | 40,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 2% |
| 619E16010 FIELD OFFICE, TYPE B | 14 MNTH | $2,500 | $1,388 | $2,500 | $1,200 | $1,500 | $2,076 | $1,400 | $1,500 | $2,000 | $1,500 | 1% |
| 586 SF |
| $1.05 |
| $1.00 |
| $0.70 |
| $1.00 |
| $2.00 |
| $1.10 |
| $2.00 |
| $2.00 |
| $2.00 |
| $1.50 |
| 202E32000 CURB REMOVED | 2,988 FT | $3.50 | $1.00 | $0.80 | $1.00 | $3.00 | $5.12 | $4.00 | $4.15 | $2.00 | $2.00 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 872 FT | $21.00 | $8.00 | $9.00 | $9.00 | $15.00 | $5.00 | $16.00 | $16.90 | $29.00 | $5.00 |
| 202E35101 PIPE REMOVED, 24" AND UNDER, AS PER PLAN | 103 FT | $38.00 | $8.00 | $21.00 | $9.00 | $18.00 | $14.00 | $22.00 | $22.75 | $58.00 | $10.00 |
| 202E38700 GUARDRAIL POST REMOVED | 16 EACH | $40.00 | $45.00 | $25.00 | $10.00 | $50.00 | $20.00 | $28.00 | $120 | $80.00 | $20.00 |
| 202E58000 MANHOLE REMOVED | 2 EACH | $600 | $350 | $590 | $50.00 | $250 | $250 | $365 | $650 | $800 | $1,000 |
| 202E58100 CATCH BASIN REMOVED | 5 EACH | $200 | $250 | $290 | $50.00 | $200 | $350 | $365 | $650 | $300 | $500 |
| 202E70110 SPECIAL - PIPE CLEANOUT, 24" AND UNDER | 397 FT | $7.56 | $13.00 | $23.00 | $20.00 | $21.00 | $7.50 | $5.00 | $16.75 | $30.00 | $5.00 |
| 202E75000 FENCE REMOVED | 73 FT | $7.40 | $8.25 | $11.00 | $5.00 | $2.00 | $18.00 | $2.00 | $5.00 | $10.00 | $10.00 |
| 202E98100 REMOVAL MISC.: EXISTING TRASH RECEPTACLES REMOVED | 5 EACH | $130 | $60.00 | $30.00 | $10.00 | $150 | $130 | $60.00 | $190 | $50.00 | $200 |
| 203E20000 EMBANKMENT | 5,395 CY | $5.00 | $9.00 | $8.00 | $14.00 | $10.00 | $4.00 | $13.00 | $3.00 | $8.30 | $5.00 |
| 204E10000 SUBGRADE COMPACTION | 17,087 SY | $0.95 | $1.00 | $0.85 | $1.25 | $1.50 | $1.25 | $1.00 | $1.25 | $1.55 | $2.00 |
| 204E13000 EXCAVATION OF SUBGRADE, 36" DEPTH | 2,441 CY | $11.75 | $6.00 | $6.00 | $16.00 | $10.00 | $17.00 | $16.00 | $15.00 | $20.75 | $12.00 |
| 204E45000 PROOF ROLLING | 9 HOUR | $150 | $168 | $150 | $200 | $300 | $170 | $107 | $200 | $320 | $150 |
| 204E50000 GEOTEXTILE FABRIC | 7,323 SY | $0.62 | $0.75 | $0.50 | $1.00 | $0.85 | $1.00 | $0.75 | $2.50 | $1.20 | $2.75 |
| 608E10000 4" CONCRETE WALK | 228 SF | $5.80 | $10.00 | $8.00 | $8.50 | $6.00 | $5.50 | $7.00 | $10.30 | $21.00 | $5.30 |
| 625E31511 PULL BOX REMOVED, AS PER PLAN | 21 EACH | $135 | $23.00 | $10.50 | $50.00 | $120 | $150 | $86.00 | $120 | $350 | $150 |
| 690E50600 SPECIAL - BOLLARD | 4 EACH | $600 | $306 | $132 | $585 | $585 | $225 | $500 | $500 | $1,100 | $635 |
| 601E21060 TIED CONCRETE BLOCK MAT WITH TYPE 2 UNDERLAYMENT | 17 SY | $38.00 | $203 | $100 | $100 | $125 | $82.00 | $110 | $75.00 | $150 | $60.00 |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 8 CY | $340 | $285 | $270 | $120 | $125 | $155 | $105 | $300 | $200 | $155 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $50.00 | $86.00 | $100 | $5.00 | $25.00 | $100 | $200 | $250 | $50.00 | $400 |
| 659E10000 SEEDING AND MULCHING | 12,829 SY | $0.63 | $1.00 | $0.90 | $0.70 | $2.10 | $1.25 | $2.50 | $1.25 | $0.63 | $1.37 |
| 659E14000 REPAIR SEEDING AND MULCHING | 641 SY | $1.00 | $0.50 | $3.00 | $0.17 | $0.40 | $2.85 | $1.25 | $1.00 | $1.00 | $0.50 |
| 659E15000 INTER-SEEDING | 641 SY | $0.10 | $0.50 | $3.00 | $0.17 | $0.10 | $2.85 | $1.25 | $1.00 | $0.10 | $0.50 |
| 659E20000 COMMERCIAL FERTILIZER | 2.89 TON | $800 | $900 | $500 | $400 | $440 | $475 | $1,750 | $800 | $800 | $800 |
| 659E31000 LIME | 2.65 ACRE | $1.00 | $1,100 | $100 | $20.00 | $100 | $100 | $1,700 | $200 | $50.00 | $197 |
| 659E35000 WATER | 73 MGAL | $0.25 | $19.00 | $1.50 | $0.10 | $1.00 | $1.50 | $58.00 | $5.00 | $1.00 | $4.11 |
| 659E40000 MOWING | 29 MSF | $0.25 | $3.00 | $4.00 | $0.50 | $4.10 | $18.00 | $50.00 | $100 | $10.00 | $25.00 |
| 671E15000 EROSION CONTROL MAT, TYPE A | 55 SY | $8.00 | $4.00 | $4.00 | $10.00 | $2.80 | $85.00 | $6.00 | $25.00 | $8.00 | $3.00 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $2,300 | $2,500 | $2,400 | $5,000 | $10,000 | $2,225 | $1,200 | $2,225 | $2,500 | $2,225 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $5,000 | $14,317 | $6,400 | $9,000 | $5,000 | $4,080 | $5,800 | $2,450 | $5,000 | $7,000 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $9,400 | $9,031 | $9,500 | $9,500 | $10,000 | $9,031 | $11,950 | $9,030 | $10,000 | $2,500 |
| 602E20000 CONCRETE MASONRY | 1.98 CY | $800 | $2,601 | $2,740 | $1,767 | $1,300 | $1,297 | $3,000 | $2,800 | $3,400 | $1,400 |
| 605E11110 6" SHALLOW PIPE UNDERDRAINS WITH GEOTEXTILE FABRIC | 2,622 FT | $8.50 | $8.20 | $11.00 | $9.00 | $8.00 | $11.00 | $10.00 | $17.00 | $10.00 | $8.50 |
| 605E13410 6" UNCLASSIFIED PIPE UNDERDRAINS WITH GEOTEXTILE F | 46 FT | $13.50 | $8.50 | $16.00 | $15.00 | $10.00 | $12.00 | $10.00 | $17.00 | $23.00 | $12.00 |
| 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS | 180 FT | $18.50 | $9.50 | $15.00 | $9.00 | $15.00 | $30.00 | $10.00 | $16.00 | $43.00 | $15.00 |
| 611E00900 6" CONDUIT, TYPE B, FOR SANITARY | 145 FT | $114 | $70.21 | $40.00 | $68.00 | $35.00 | $32.00 | $72.00 | $38.00 | $111 | $100 |
| 611E04600 12" CONDUIT, TYPE C | 305 FT | $53.00 | $48.20 | $48.00 | $50.00 | $45.00 | $59.00 | $52.00 | $45.00 | $75.00 | $42.00 |
| 611E06100 15" CONDUIT, TYPE C | 125 FT | $54.00 | $51.50 | $60.00 | $69.00 | $48.00 | $44.24 | $55.00 | $68.50 | $82.00 | $59.00 |
| 611E07400 18" CONDUIT, TYPE B | 156 FT | $48.00 | $73.00 | $80.00 | $75.00 | $74.00 | $90.00 | $102 | $91.70 | $130 | $76.00 |
| 611E07600 18" CONDUIT, TYPE C | 26 FT | $82.00 | $62.00 | $85.00 | $72.00 | $80.00 | $82.00 | $68.00 | $66.00 | $115 | $82.00 |
| 611E10400 24" CONDUIT, TYPE B | 40 FT | $85.00 | $105 | $95.00 | $100 | $101 | $120 | $120 | $105 | $120 | $88.00 |
| 611E98150 CATCH BASIN, NO. 3 | 6 EACH | $3,000 | $3,830 | $3,200 | $2,600 | $3,000 | $3,300 | $3,300 | $4,235 | $4,500 | $2,700 |
| 611E98180 CATCH BASIN, NO. 3A | 11 EACH | $2,200 | $2,418 | $2,800 | $2,000 | $2,300 | $3,500 | $2,200 | $3,220 | $2,500 | $2,315 |
| 611E98450 CATCH BASIN, NO. 2-2A | 1 EACH | $1,400 | $1,602 | $1,300 | $1,250 | $1,200 | $1,600 | $1,700 | $2,900 | $1,600 | $2,250 |
| 611E99574 MANHOLE, NO. 3 | 11 EACH | $2,400 | $3,577 | $3,400 | $3,000 | $3,000 | $3,200 | $3,000 | $4,615 | $5,000 | $2,600 |
| 611E99586 MANHOLE, NO. 3 WITH 108" BASE I.D. AND 12" WEIR | 1 EACH | $9,000 | $11,432 | $17,000 | $11,000 | $10,000 | $40,000 | $15,500 | $15,263 | $12,500 | $8,919 |
| 611E99660 MANHOLE RECONSTRUCTED TO GRADE | 1 EACH | $1,150 | $1,312 | $3,000 | $400 | $900 | $2,000 | $1,000 | $850 | $4,800 | $1,000 |
| 895E10040 MANUFACTURED WATER QUALITY STRUCTURE, TYPE 4 | 1 EACH | $25,000 | $30,486 | $35,000 | $42,000 | $35,000 | $55,000 | $42,000 | $33,200 | $35,000 | $29,500 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.75" DEPTH | 6,530 SY | $2.45 | $2.25 | $3.00 | $2.45 | $2.00 | $2.00 | $2.50 | $3.00 | $2.00 | $2.00 |
| 407E20000 NON-TRACKING TACK COAT | 1,110 GAL | $2.25 | $2.00 | $3.00 | $2.25 | $3.20 | $3.20 | $2.25 | $2.75 | $2.00 | $3.20 |
| 442E20100 ASPHALT CONCRETE INTERMEDIATE COURSE, 9.5 MM, TYPE | 65 CY | $170 | $210 | $229 | $170 | $186 | $186 | $185 | $200 | $165 | $186 |
| 452E10020 6" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P W | 453 SY | $48.20 | $53.00 | $59.00 | $53.00 | $50.00 | $67.00 | $66.00 | $66.10 | $95.00 | $65.00 |
| 609E26000 CURB, TYPE 6 | 1,901 FT | $11.75 | $15.00 | $20.00 | $17.50 | $15.10 | $16.00 | $12.00 | $16.50 | $16.00 | $18.00 |
| 609E70000 4" CONCRETE MEDIAN | 423 SY | $40.00 | $31.00 | $50.00 | $50.65 | $50.65 | $28.00 | $50.00 | $51.10 | $44.00 | $50.00 |
| 609E72001 CONCRETE MEDIAN, AS PER PLAN, 8" DEPTH | 28 SY | $110 | $54.00 | $77.00 | $73.80 | $73.80 | $80.00 | $70.00 | $78.60 | $100 | $70.00 |
| 625E00450 CONNECTION, FUSED PULL APART | 48 EACH | $100 | $100 | $89.00 | $85.00 | $100 | $96.00 | $96.00 | $96.00 | $100 | $96.00 |
| 625E00480 CONNECTION, UNFUSED PERMANENT | 21 EACH | $100 | $106 | $89.00 | $85.00 | $100 | $96.00 | $101 | $96.00 | $100 | $96.00 |
| 625E14100 LIGHT POLE FOUNDATION, 24" X 8' DEEP | 24 EACH | $1,250 | $1,721 | $1,260 | $1,200 | $1,250 | $1,600 | $1,650 | $1,825 | $1,250 | $1,825 |
| 625E23200 NO. 4 AWG 2400 VOLT DISTRIBUTION CABLE | 8,580 FT | $2.00 | $2.90 | $2.00 | $2.00 | $2.00 | $3.10 | $3.00 | $3.00 | $2.00 | $3.00 |
| 625E23400 NO. 10 AWG POLE AND BRACKET CABLE | 3,312 FT | $1.25 | $1.60 | $1.25 | $1.25 | $1.25 | $1.15 | $1.60 | $1.15 | $1.25 | $1.15 |
| 625E24320 1-1/2" DUCT CABLE WITH THREE NO. 4 AWG 2400 VOLT C | 5,631 FT | $5.75 | $9.20 | $5.50 | $5.50 | $5.75 | $8.00 | $8.75 | $8.00 | $5.75 | $8.00 |
| 625E25408 CONDUIT, 2", 725.051 | 1,483 FT | $3.00 | $7.15 | $3.00 | $3.00 | $3.00 | $8.00 | $7.00 | $8.00 | $3.00 | $8.00 |
| 625E25504 CONDUIT, 3", 725.051 | 1,136 FT | $5.00 | $11.00 | $5.00 | $5.00 | $5.00 | $9.50 | $11.00 | $9.50 | $5.00 | $9.50 |
| 625E25902 CONDUIT, JACKED OR DRILLED, 725.04, 3" CONDUIT | 21 FT | $35.00 | $100 | $34.00 | $32.00 | $35.00 | $38.00 | $96.00 | $38.00 | $35.00 | $38.00 |
| 625E26253 LUMINAIRE, CONVENTIONAL, SOLID STATE (LED), AS PER | 24 EACH | $400 | $600 | $422 | $400 | $400 | $350 | $575 | $500 | $400 | $500 |
| 625E26263 LUMINAIRE, HIGH MAST, SOLID STATE (LED), AS PER PL | 22 EACH | $950 | $1,004 | $1,000 | $950 | $950 | $850 | $965 | $1,000 | $950 | $1,000 |
| 625E29000 TRENCH | 7,728 FT | $4.25 | $8.00 | $4.00 | $4.00 | $4.25 | $8.00 | $7.75 | $8.00 | $4.25 | $8.00 |
| 625E30706 PULL BOX, 725.08, 24" | 8 EACH | $1,000 | $975 | $1,050 | $1,000 | $1,000 | $950 | $935 | $950 | $1,000 | $950 |
| 625E31510 PULL BOX REMOVED | 5 EACH | $100 | $373 | $100 | $100 | $100 | $150 | $360 | $150 | $100 | $150 |
| 625E32000 GROUND ROD | 38 EACH | $225 | $258 | $200 | $200 | $225 | $115 | $248 | $115 | $225 | $115 |
| 625E36010 UNDERGROUND WARNING/MARKING TAPE | 7,728 FT | $0.25 | $0.50 | $0.20 | $0.25 | $0.25 | $0.30 | $0.50 | $0.30 | $0.25 | $0.30 |
| 625E75400 LIGHT POLE REMOVED | 33 EACH | $100 | $361 | $100 | $100 | $100 | $230 | $348 | $230 | $100 | $230 |
| 625E75500 LIGHT POLE FOUNDATION REMOVED | 33 EACH | $150 | $631 | $158 | $150 | $150 | $130 | $605 | $130 | $150 | $130 |
| 625E75506 LUMINAIRE REMOVED | 39 EACH | $25.00 | $53.00 | $25.00 | $25.00 | $25.00 | $40.00 | $50.00 | $40.00 | $25.00 | $40.00 |
| 625E25408 CONDUIT, 2", 725.051 | 2,396 FT | $3.00 | $7.00 | $3.00 | $3.00 | $3.00 | $8.00 | $7.00 | $8.00 | $3.00 | $8.00 |
| 625E25902 CONDUIT, JACKED OR DRILLED, 725.04, 3" CONDUIT | 181 FT | $35.00 | $55.00 | $32.00 | $32.00 | $35.00 | $38.00 | $53.00 | $38.00 | $35.00 | $38.00 |
| 625E29000 TRENCH | 2,396 FT | $4.25 | $8.00 | $4.00 | $4.00 | $4.25 | $8.00 | $8.00 | $8.00 | $4.25 | $8.00 |
| 625E30706 PULL BOX, 725.08, 24" | 18 EACH | $1,000 | $981 | $1,000 | $1,000 | $1,000 | $950 | $942 | $950 | $1,000 | $950 |
| 625E36010 UNDERGROUND WARNING/MARKING TAPE | 2,396 FT | $0.25 | $0.50 | $0.20 | $0.25 | $0.25 | $0.30 | $0.50 | $0.30 | $0.25 | $0.30 |
| 621E00100 RPM | 22 EACH | $253 | $266 | $170 | $140 | $140 | $215 | $180 | $35.00 | $163 | $215 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 30 EACH | $1.10 | $1.00 | $15.00 | $5.00 | $14.00 | $7.00 | $25.00 | $25.00 | $9.54 | $25.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 580 FT | $13.00 | $10.00 | $8.00 | $13.00 | $13.00 | $8.50 | $8.00 | $11.00 | $7.55 | $6.85 |
| 630E08600 SIGN POST REFLECTOR | 9 EACH | $45.00 | $30.00 | $26.00 | $45.00 | $45.00 | $25.00 | $60.00 | $75.00 | $23.75 | $54.25 |
| 630E80100 SIGN, FLAT SHEET | 220 SF | $16.00 | $14.00 | $12.00 | $16.00 | $16.00 | $12.00 | $19.00 | $18.00 | $11.40 | $17.20 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 44 EACH | $10.00 | $12.00 | $10.00 | $10.00 | $10.00 | $10.00 | $36.00 | $30.00 | $9.50 | $32.60 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 48 EACH | $15.00 | $18.00 | $15.00 | $15.00 | $15.00 | $15.00 | $48.00 | $30.00 | $14.50 | $43.40 |
| 646E10010 EDGE LINE, 6" | 0.38 MILE | $2,617 | $8,606 | $3,000 | $2,617 | $2,617 | $7,500 | $8,250 | $7,500 | $2,617 | $6,500 |
| 646E10900 HANDICAP SYMBOL MARKING | 6 EACH | $393 | $201 | $550 | $393 | $393 | $175 | $194 | $175 | $393 | $175 |
| 646E20200 PARKING LOT STALL MARKING | 5,906 FT | $2.18 | $3.50 | $2.00 | $2.18 | $2.18 | $3.00 | $3.50 | $5.00 | $2.45 | $3.00 |
| 690E50500 SPECIAL - CONCRETE PARKING BLOCK | 6 EACH | $200 | $150 | $98.00 | $300 | $200 | $100 | $150 | $250 | $193 | $450 |
| 807E12010 WET REFLECTIVE EPOXY PAVEMENT MARKING, EDGE LINE, | 0.59 MILE | $3,942 | $14,347 | $4,500 | $3,942 | $3,942 | $12,500 | $13,800 | $12,500 | $3,942 | $11,100 |
| 850E10010 GROOVING FOR 6" RECESSED PAVEMENT MARKING | — | $11,692 | $9,641 | $10,000 | $11,692 | $11,692 | $8,400 | $9,250 | $8,500 | $11,692 | $11,100 |
| 616E10000 WATER | 20.5 MGAL | $10.00 | $133 | $87.00 | $1.00 | $30.00 | $86.00 | $57.00 | $50.00 | $60.00 | $50.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $25,000 | $33,675 | $18,000 | $29,000 | $49,142 | $10,000 | $50,000 | $40,000 | $42,200 | $40,000 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $11,240 | $12,265 | $400 | $13,000 | $25,000 | $20,000 | $20,000 | $40,000 | $8,000 | $4,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 451E14020 9" REINFORCED CONCRETE PAVEMENT, CLASS QC 1P WITH | 18,596 SY | $61.35 | $1.14M | 35% |
| 304E20001 AGGREGATE BASE, AS PER PLAN | 4,069 CY | $50.5 | $205k | 6% |
| 203E10000 EXCAVATION | 8,268 CY | $14 | $116k | 4% |
| 204E30020 GRANULAR MATERIAL, TYPE C | 3,255 CY | $32 | $104k | 3% |
| 202E23000 PAVEMENT REMOVED | 11,425 SY | $7 | $80k | 2% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 660 CY | $120 | $79k | 2% |
| 442E10001 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 382 CY | $188 | $72k | 2% |
| 609E28000 CURB, TYPE 7 | 4,513 FT | $14.35 | $65k | 2% |
| 625E10490 LIGHT POLE, CONVENTIONAL, DESIGN AT6B40 | 24 EACH | $2,550 | $61k | 2% |
| 625E13500 LIGHT TOWER, MISC.: LIGHT TOWER, BBBB45 | 4 EACH | $15,000 | $60k | 2% |