MOT-IR 675-04.11
MOT County · est $4.7M
Bid dateThursday, February 11—
MOT County · est $4.7M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 8.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 33 more items below.
| Item | Quantity | R1Barrett Paving Materials INC | R2John R Jurgensen Company | % of bid |
|---|---|---|---|---|
| 442E10301 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 14,554 CY | $164 | $207 | 57% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 2" | 261,865 SY | $1.45 | $2.05 | 9% |
| 253E01001 PAVEMENT REPAIR, AS PER PLAN (A) | 3,000 SY | $92.00 | $81.73 | 7% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $168,550 | $228,495 | 4% |
| 253E01001 PAVEMENT REPAIR, AS PER PLAN (B) | 2,000 SY | $73.00 | $50.22 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $100,000 | 2% |
| 442E00100 ANTI-SEGREGATION EQUIPMENT | 9,759 CY | $10.00 | $6.00 | 2% |
| 617E10100 COMPACTED AGGREGATE |
| Item | Quantity | R1Barrett Paving Materials INC | R2John R Jurgensen Company |
|---|---|---|---|
| 202E23000 PAVEMENT REMOVED | 12 SY | $95.00 | $189 |
| 203E10000 EXCAVATION | 38 CY | $80.00 | $57.63 |
| 204E10000 SUBGRADE COMPACTION | 110 SY | $2.50 | $8.53 |
| 606E55210 SPECIAL - CABLE BARRIER, ANCHOR RECONSTRUCTED | 2 EACH | $4,575 | $8,350 |
| 254E01601 PATCHING PLANED SURFACE, AS PER PLAN | 300 SY | $1.00 | $8.45 |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 20 CY | $225 | $426 |
| 304E20000 AGGREGATE BASE | 20 CY |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 1,093 CY |
| $75.00 |
| $70.01 |
| 2% |
| 850E10010 GROOVING FOR 6" RECESSED PAVEMENT MARKING | — | $2,600 | $2,600 | 2% |
| 809E69100 STOP LINE RADAR DETECTION | 10 EACH | $7,050 | $7,070 | 2% |
| 809E69000 ADVANCE RADAR DETECTION | 9 EACH | $7,350 | $7,400 | 2% |
| 807E14010 WET REFLECTIVE THERMOPLASTIC PAVEMENT MARKING, EDG | 17.13 MILE | $3,518 | $3,518 | 1% |
| 407E20000 NON-TRACKING TACK COAT | 19,653 GAL | $2.50 | $4.50 | 1% |
| 614E22010 WORK ZONE EDGE LINE, CLASS I, 6", 807 PAINT | 17.13 MILE | $2,826 | $2,826 | 1% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 500 HOUR | $80.00 | $101 | 1% |
| 807E14310 WET REFLECTIVE THERMOPLASTIC PAVEMENT MARKING, CHA | 7,722 FT | $4.96 | $4.96 | 1% |
| 807E14110 WET REFLECTIVE THERMOPLASTIC PAVEMENT MARKING, LAN | 13.15 MILE | $1,750 | $1,750 | 1% |
| 614E12420 DETOUR SIGNING | 1 LS | $22,350 | $22,350 | 1% |
| 850E10130 GROOVING FOR 12" RECESSED PAVEMENT MARKING | — | $2.86 | $2.86 | 1% |
| 621E00100 RPM | 891 EACH | $23.20 | $25.50 | 0% |
| $140 |
| $56.13 |
| 618E40600 RUMBLE STRIPS, SHOULDER (ASPHALT CONCRETE) | 13.04 MILE | $1,350 | $475 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 891 EACH | $8.00 | $10.15 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 66 FT | $12.00 | $19.00 |
| 630E08600 SIGN POST REFLECTOR | 4 EACH | $50.00 | $48.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 4 EACH | $100 | $60.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 4 EACH | $25.00 | $25.00 |
| 644E00404 CHANNELIZING LINE, 12" | 1,793 FT | $1.50 | $1.50 |
| 644E00500 STOP LINE | 116 FT | $7.00 | $7.00 |
| 644E00600 CROSSWALK LINE | 326 FT | $3.50 | $3.50 |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 157 FT | $7.00 | $7.00 |
| 644E01300 LANE ARROW | 28 EACH | $90.00 | $90.00 |
| 644E01360 WRONG WAY ARROW | 9 EACH | $282 | $282 |
| 807E14410 WET REFLECTIVE THERMOPLASTIC PAVEMENT MARKING, DOT | 4,537 FT | $2.50 | $2.50 |
| 850E10110 GROOVING FOR 6" RECESSED PAVEMENT MARKING | — | $2.00 | $2.00 |
| 632E90500 SIGNALIZATION, MISC.: UNLASH AND RELASH MESSENGER | 1,200 FT | $5.00 | $6.00 |
| 614E12500 REPLACEMENT SIGN | 5 EACH | $125 | $277 |
| 614E12600 REPLACEMENT DRUM | 10 EACH | $50.00 | $101 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 4 SNMT | $975 | $950 |
| 614E20010 WORK ZONE LANE LINE, CLASS I, 6", 807 PAINT | 13.15 MILE | $1,413 | $1,413 |
| 614E23010 WORK ZONE CHANNELIZING LINE, CLASS I, 12", 807 PAI | 7,722 FT | $1.50 | $1.50 |
| 614E23690 WORK ZONE CHANNELIZING LINE, CLASS III, 12", 642 P | 1,793 FT | $1.50 | $1.50 |
| 614E24000 WORK ZONE DOTTED LINE, CLASS I, 6", 807 PAINT | 4,537 FT | $1.00 | $1.00 |
| 808E18700 DIGITAL SPEED LIMIT (DSL) SIGN ASSEMBLY | 8 SNMT | $875 | $850 |
| 519E12300 PATCHING CONCRETE BRIDGE DECK - TYPE B | 12 SY | $625 | $750 |
| 519E12300 PATCHING CONCRETE BRIDGE DECK - TYPE B | 3 SY | $625 | $1,200 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $15,000 | $23,415 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 442E10301 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 14,554 CY | $164 | $2.39M | 55% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 2" | 261,865 SY | $1.45 | $380k | 9% |
| 253E01001 PAVEMENT REPAIR, AS PER PLAN (A) | 3,000 SY | $92 | $276k | 6% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $168,550 | $169k | 4% |
| 253E01001 PAVEMENT REPAIR, AS PER PLAN (B) | 2,000 SY | $73 | $146k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $100k | 2% |
| 442E00100 ANTI-SEGREGATION EQUIPMENT | 9,759 CY | $10 | $98k | 2% |
| 617E10100 COMPACTED AGGREGATE | 1,093 CY | $75 | $82k | 2% |
| 850E10010 GROOVING FOR 6" RECESSED PAVEMENT MARKING | — | $2,600 | $79k | 2% |
| 809E69100 STOP LINE RADAR DETECTION | 10 EACH | $7,050 | $71k | 2% |