ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 7 more items below.
| Item | Quantity | R1Scioto Valley Paving | R2Wai Construction Group LLC | R3Distel Construction INC | R4Skeens Excavating INC | R5Axis Civil Construction LLC | R6Fillmore Construction | R7Eclipse CO LLC | R8Sc Construction & Materials LLC | R9R C Construction Company And Son | R10INC Sunesis Construction CO | % of bid |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 611E07201 18" CONDUIT, TYPE A, AS PER PLAN ,707.33 | 860 FT | $48.00 | $56.50 | $74.50 | $50.00 | $80.00 | $100 | $74.00 | $18.00 | $150 | $97.82 | 31% |
| Item | Quantity | R1Scioto Valley Paving | R2Wai Construction Group LLC | R3Distel Construction INC | R4Skeens Excavating INC | R5Axis Civil Construction LLC | R6Fillmore Construction | R7Eclipse CO LLC | R8Sc Construction & Materials LLC | R9R C Construction Company And Son | R10INC Sunesis Construction CO |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 203E35000 GRANULAR EMBANKMENT | 22 CY | $20.00 | $57.27 | $55.00 | $100 | $100 | $100 | $112 | $300 | $100 | $1,112 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 602E20001 CONCRETE MASONRY, AS PER PLAN | 35 CY | $950 | $1,153 | $1,250 | $900 | $1,450 | $1,500 | $2,579 | $1,000 | $1,750 | $2,312 | 25% |
| 624E10000 MOBILIZATION | 1 LS | $18,000 | $6,300 | $6,760 | $14,500 | $18,000 | $7,500 | $44,484 | $100,000 | $12,500 | $108,541 | 14% |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 90 CY | $70.00 | $90.41 | $100 | $150 | $125 | $200 | $82.50 | $250 | $100 | $308 | 5% |
| 832E30000 EROSION CONTROL | 5,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 4% |
| 304E20000 AGGREGATE BASE | 47 CY | $70.00 | $78.28 | $55.00 | $120 | $150 | $100 | $140 | $75.00 | $100 | $344 | 2% |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 811 FT | $4.00 | $3.28 | $3.00 | $10.00 | $15.00 | $20.00 | $12.50 | $10.00 | $25.00 | $22.67 | 2% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $3,000 | $5,650 | $3,000 | $6,000 | $5,500 | $5,500 | $6,075 | $1,000 | $12,500 | $3,988 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $2,500 | $3,007 | $3,912 | $2,000 | $3,000 | $3,500 | $4,065 | $10,000 | $10,000 | $0.01 | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $2,500 | $5,650 | $3,500 | $5,000 | $6,500 | $4,500 | $7,072 | $5,000 | $25,000 | $19,081 | 2% |
| 611E10201 24" CONDUIT, TYPE A, AS PER PLAN ,707.33 | 40 FT | $60.00 | $70.08 | $85.00 | $100 | $80.00 | $200 | $75.50 | $25.00 | $175 | $215 | 2% |
| 619E16000 FIELD OFFICE, TYPE A | 2 MNTH | $1,200 | $226 | $2,250 | $50.00 | $1,300 | $1,000 | $683 | $4,000 | $100 | $1,666 | 2% |
| 503E21104 UNCLASSIFIED EXCAVATION, INCLUDING ROCK | 37 CY | $50.00 | $81.97 | $100 | $10.00 | $55.00 | $500 | $146 | $140 | $100 | $550 | 1% |
| 659E10000 SEEDING AND MULCHING | 960 SY | $1.75 | $1.93 | $4.00 | $10.00 | $3.00 | $5.00 | $3.50 | $1.25 | $25.00 | $17.90 | 1% |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 504 FT | $2.00 | $4.02 | $5.00 | $40.00 | $5.00 | $5.00 | $3.00 | $30.00 | $20.00 | $7.94 | 1% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $1,000 | $1,589 | $5,000 | $2,500 | $3,500 | $7,500 | $8,323 | $42,000 | $20,000 | $8,188 | 1% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 4 CY | $250 | $565 | $1,000 | $1,200 | $600 | $1,000 | $525 | $1,000 | $2,000 | $2,885 | 1% |
| 620E00500 DELINEATOR, POST GROUND MOUNTED ,TYPE C | 32 EACH | $30.00 | $37.29 | $75.00 | $200 | $68.00 | $30.00 | $114 | $100 | $250 | $67.70 | 1% |
| 202E23000 PAVEMENT REMOVED | 81 SY | $6.00 | $9.04 | $10.00 | $50.00 | $12.00 | $10.00 | $14.00 | $150 | $20.00 | $235 | 0% |
| 202E20010 HEADWALL REMOVED | 32 EACH | $15.00 | $20.06 | $250 | $200 | $450 | $350 | $123 | $350 | $500 | $346 | 0% |
| 204E10000 SUBGRADE COMPACTION |
| 168 SY |
| $1.00 |
| $3.39 |
| $5.00 |
| $15.00 |
| $2.00 |
| $10.00 |
| $6.50 |
| $59.52 |
| $2.00 |
| $50.12 |
| 659E14000 REPAIR SEEDING AND MULCHING | 96 SY | $2.00 | $1.69 | $5.00 | $2.00 | $0.50 | $5.00 | $1.00 | $50.00 | $0.20 | $8.08 |
| 659E20000 COMMERCIAL FERTILIZER | 0.13 TON | $650 | $678 | $600 | $400 | $300 | $1,000 | $604 | $1,000 | $1,200 | $505 |
| 659E31000 LIME | 0.2 ACRE | $650 | $339 | $200 | $400 | $250 | $1,000 | $242 | $800 | $800 | $101 |
| 659E35000 WATER | 5.2 MGAL | $1.00 | $1.09 | $10.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $20.21 |
| 408E10000 PRIME COAT | 7 GAL | $1.00 | $7.91 | $100 | $3.00 | $10.00 | $50.00 | $5.50 | $30.00 | $50.00 | $2.99 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 611E07201 18" CONDUIT, TYPE A, AS PER PLAN ,707.33 | 860 FT | $48 | $41k | 31% |
| 602E20001 CONCRETE MASONRY, AS PER PLAN | 35 CY | $950 | $33k | 25% |
| 624E10000 MOBILIZATION | 1 LS | $18,000 | $18k | 14% |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 90 CY | $70 | $6k | 5% |
| 832E30000 EROSION CONTROL | 5,000 EACH | $1 | $5k | 4% |
| 304E20000 AGGREGATE BASE | 47 CY | $70 | $3k | 2% |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 811 FT | $4 | $3k | 2% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $3,000 | $3k | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $2,500 | $3k | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $2,500 | $3k | 2% |