BEL-SR 147-04.45
BEL County · est $0.2M
Bid dateThursday, February 25—
BEL County · est $0.2M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 6.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 27 more items below.
| Item | Quantity | R1Ohio-west Virginia Excavating CO | R2Shelly & Sands INC | R3Eclipse CO LLC | R4Cast & Baker Corporation | % of bid |
|---|---|---|---|---|---|---|
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $41,271 | $23,500 | $10,806 | $83,400 | 24% |
| 302E46000 ASPHALT CONCRETE BASE, PG64-22 | 73 CY | $235 | $318 | $202 | $269 | 10% |
| 203E20000 EMBANKMENT | 209 CY | $59.62 | $17.00 | $15.00 | $12.00 | 7% |
| 690E71000 SPECIAL - ASBESTOS ABATEMENT, VERMICULITE INSULATI | 1 LS | $12,254 | $10,700 | $10,735 | $35,200 | 7% |
| Item | Quantity | R1Ohio-west Virginia Excavating CO | R2Shelly & Sands INC | R3Eclipse CO LLC | R4Cast & Baker Corporation |
|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $339 | $2,000 | $3,358 | $2,600 |
| 202E23000 PAVEMENT REMOVED | 64 SY | $21.00 | $25.00 | $34.00 | $44.50 |
| 202E30000 WALK REMOVED | 1,303 SF | $1.35 | $0.50 | $1.50 | $1.00 |
| 202E32000 CURB REMOVED | 258 FT | $3.09 | $3.00 | $4.50 | $2.70 |
| 202E75000 FENCE REMOVED |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 624E10000 MOBILIZATION | 1 LS | $11,681 | $10,000 | $31,000 | $8,000 | 7% |
| 202E56001 BUILDING DEMOLISHED, AS PER PLAN, (A) | 1 LS | $9,826 | $29,500 | $16,524 | $13,150 | 6% |
| 690E70100 SPECIAL - ASBESTOS ABATEMENT, TRANSITE SIDING | 3,000 SF | $2.46 | $2.65 | $4.00 | $5.85 | 4% |
| 608E10000 4" CONCRETE WALK | 805 SF | $8.30 | $10.00 | $11.50 | $8.00 | 4% |
| 203E10000 EXCAVATION | 240 CY | $25.45 | $25.00 | $13.00 | $21.00 | 4% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 12 CY | $494 | $548 | $485 | $555 | 3% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (16 CY | $368 | $428 | $349 | $450 | 3% |
| 304E20000 AGGREGATE BASE | 59 CY | $96.73 | $125 | $95.00 | $100 | 3% |
| 609E26000 CURB, TYPE 6 | 211 FT | $26.90 | $40.00 | $41.00 | $31.00 | 3% |
| 619E16000 FIELD OFFICE, TYPE A | 3 MNTH | $1,815 | $800 | $474 | $2,700 | 3% |
| 202E56001 BUILDING DEMOLISHED, AS PER PLAN, (B) | 1 LS | $4,034 | $2,550 | $4,382 | $1,800 | 2% |
| 452E10050 6" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC MS | 23 SY | $130 | $195 | $129 | $118 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $2,687 | $1,000 | $5,000 | $2,900 | 2% |
| 608E52000 CURB RAMP | 72 SF | $33.00 | $25.00 | $25.00 | $24.00 | 1% |
| 690E70100 SPECIAL - ASBESTOS ABATEMENT, DRYWALL JOINT COMPO | 365 SF | $5.87 | $3.25 | $22.50 | $16.05 | 1% |
| 659E00300 TOPSOIL | 54 CY | $39.07 | $75.00 | $77.50 | $65.00 | 1% |
| 17 FT |
| $9.09 |
| $3.00 |
| $47.50 |
| $5.00 |
| 202E98100 REMOVAL MISC.: FENCE POST | 5 EACH | $32.32 | $75.00 | $132 | $16.00 |
| 204E10000 SUBGRADE COMPACTION | 398 SY | $2.32 | $1.00 | $3.50 | $4.50 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $56.73 | $88.00 | $211 | $105 |
| 659E10000 SEEDING AND MULCHING | 488 SY | $2.14 | $4.80 | $5.50 | $6.40 |
| 659E20000 COMMERCIAL FERTILIZER | 0.07 TON | $1,904 | $630 | $526 | $650 |
| 659E31000 LIME | 0.1 ACRE | $2,416 | $155 | $211 | $85.00 |
| 659E35000 WATER | 5 MGAL | $5.67 | $1.00 | $1.00 | $2.00 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 |
| 407E20000 NON-TRACKING TACK COAT | 54 GAL | $2.27 | $3.00 | $3.50 | $3.75 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 15.6 FT | $39.71 | $35.00 | $60.50 | $24.00 |
| 630E80100 SIGN, FLAT SHEET | 7 SF | $56.73 | $50.00 | $67.50 | $55.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 2 EACH | $170 | $50.00 | $21.00 | $152 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 1 EACH | $170 | $50.00 | $26.50 | $304 |
| 642E00300 CENTER LINE, TYPE 1 | 0.1 MILE | $7,432 | $6,550 | $6,893 | $24,800 |
| 642E00500 STOP LINE, TYPE 1 | 12 FT | $15.88 | $14.00 | $14.50 | $15.00 |
| 202E98000 REMOVAL MISC.: REMOVAL OF MISCELLANEOUS CONCRETE I | 1 LS | $1,180 | $1,200 | $2,379 | $865 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 20 HOUR | $73.75 | $65.00 | $68.50 | $70.00 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 0.14 MILE | $4,255 | $3,750 | $3,947 | $15,000 |
| 614E22210 WORK ZONE EDGE LINE, CLASS I, 6", 740.06, TYPE I | 0.07 MILE | $9,531 | $8,400 | $8,840 | $13,000 |
| 614E26400 WORK ZONE STOP LINE, CLASS I, 740.06, TYPE I | 49 FT | $14.18 | $12.50 | $13.00 | $9.00 |
| 616E10000 WATER | 10 MGAL | $56.73 | $10.00 | $13.00 | $100 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $851 | $6,000 | $7,991 | $7,500 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $41,271 | $41k | 22% |
| 302E46000 ASPHALT CONCRETE BASE, PG64-22 | 73 CY | $235.2 | $17k | 9% |
| 203E20000 EMBANKMENT | 209 CY | $59.62 | $12k | 7% |
| 690E71000 SPECIAL - ASBESTOS ABATEMENT, VERMICULITE INSULATI | 1 LS | $12,254 | $12k | 7% |
| 624E10000 MOBILIZATION | 1 LS | $11,681 | $12k | 6% |
| 202E56001 BUILDING DEMOLISHED, AS PER PLAN, (A) | 1 LS | $9,826 | $10k | 5% |
| 690E70100 SPECIAL - ASBESTOS ABATEMENT, TRANSITE SIDING | 3,000 SF | $2.46 | $7k | 4% |
| 608E10000 4" CONCRETE WALK | 805 SF | $8.3 | $7k | 4% |
| 203E10000 EXCAVATION | 240 CY | $25.45 | $6k | 3% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 12 CY | $494.36 | $6k | 3% |