BUT-SR 129-00.00
BUT County · est $2.2M
Bid dateThursday, March 11—
BUT County · est $2.2M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 7%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 25 more items below.
| Item | Quantity | R1Barrett Paving Materials INC | R2John R Jurgensen Company | % of bid |
|---|---|---|---|---|
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (5759 CY | $135 | $149 | 37% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 4,298 CY | $145 | $162 | 30% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 3" | 118,468 SY | $1.50 | $2.20 | 8% |
| 624E10000 MOBILIZATION | 1 LS | $81,250 | $100,000 | 4% |
| 253E02000 PAVEMENT REPAIR | 300 CY | $250 | $353 | 4% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, NCHRP 350/MASH 2016 | 23 EACH | $2,320 | $2,425 | 3% |
| 407E20000 NON-TRACKING TACK COAT | 17,771 GAL | $3.00 | $3.50 | 3% |
| 644E00104 EDGE LINE, 6" |
| Item | Quantity | R1Barrett Paving Materials INC | R2John R Jurgensen Company |
|---|---|---|---|
| 202E38000 GUARDRAIL REMOVED | 1,688 FT | $1.50 | $5.00 |
| 202E42000 ANCHOR ASSEMBLY REMOVED, TYPE A | 18 EACH | $265 | $525 |
| 202E42010 ANCHOR ASSEMBLY REMOVED, TYPE E | 5 EACH | $135 | $275 |
| 202E42040 ANCHOR ASSEMBLY REMOVED, TYPE T | 2 EACH | $95.00 | $315 |
| 202E47000 BRIDGE TERMINAL ASSEMBLY REMOVED | 4 EACH | $75.00 | $325 |
| 203E20000 EMBANKMENT | 5 CY | $79.00 | $388 |
| 606E17360 GUARDRAIL, TYPE MGS, LONG-SPAN | 100 FT |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 17.44 MILE |
| $2,628 |
| $2,628 |
| 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $35,000 | $42,619 | 2% |
| 644E00300 CENTER LINE | 8.74 MILE | $3,875 | $3,875 | 2% |
| 617E10100 COMPACTED AGGREGATE | 524 CY | $60.00 | $55.80 | 1% |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 1,238 FT | $19.20 | $21.25 | 1% |
| 209E72050 PREPARING SUBGRADE FOR SHOULDER PAVING | 18 MILE | $883 | $809 | 1% |
| 621E00100 RPM | 626 EACH | $23.05 | $23.05 | 1% |
| 614E22110 WORK ZONE EDGE LINE, CLASS I, 6", 642 PAINT | 17.52 MILE | $650 | $650 | 1% |
| 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT | 8.76 MILE | $1,288 | $1,288 | 1% |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 8.76 MILE | $1,275 | $1,275 | 1% |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 17.52 MILE | $635 | $635 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $8,500 | $8,514 | 0% |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 626 EACH | $9.00 | $19.90 | 0% |
| $22.00 |
| $22.50 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 2 EACH | $970 | $1,100 |
| 606E35141 BRIDGE TERMINAL ASSEMBLY, TYPE 4, AS PER PLAN | 5 EACH | $895 | $1,875 |
| 254E01600 PATCHING PLANED SURFACE | 1,187 SY | $1.50 | $3.85 |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 1 EACH | $1,000 | $467 |
| 617E25000 WATER | 10.49 MGAL | $65.00 | $66.57 |
| 623E39500 MONUMENT BOX ADJUSTED TO GRADE | 3 EACH | $120 | $458 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, BIDIRECTIONAL | 32 EACH | $7.45 | $12.50 |
| 644E00500 STOP LINE | 35 FT | $35.00 | $35.00 |
| 644E01000 RAILROAD SYMBOL MARKING | 2 EACH | $1,001 | $1,001 |
| 646E10010 EDGE LINE, 6" | 0.08 MILE | $51,342 | $51,342 |
| 646E10200 CENTER LINE | 0.02 MILE | $102,550 | $102,550 |
| 614E26200 WORK ZONE STOP LINE, CLASS I, 642 PAINT | 35 FT | $3.00 | $3.00 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 35 FT | $3.00 | $3.00 |
| 614E32200 WORK ZONE RAILROAD SYMBOL MARKING, CLASS I, 642 PA | 2 EACH | $225 | $225 |
| 614E32210 WORK ZONE RAILROAD SYMBOL MARKING, CLASS III, 642 | 2 EACH | $200 | $200 |
| 519E12300 PATCHING CONCRETE BRIDGE DECK - TYPE B | 5.5 SY | $750 | $750 |
| 100E00300 PREMIUM ON RAILROADS' PROTECTIVE PUBLIC LIABILITY | 1 LS | $3,750 | $2,964 |
| 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P | 1 LS | $3,200 | $2,568 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (5759 CY | $135 | $777k | 36% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 4,298 CY | $145 | $623k | 29% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 3" | 118,468 SY | $1.5 | $178k | 8% |
| 624E10000 MOBILIZATION | 1 LS | $81,250 | $81k | 4% |
| 253E02000 PAVEMENT REPAIR | 300 CY | $250 | $75k | 3% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, NCHRP 350/MASH 2016 | 23 EACH | $2,320 | $53k | 2% |
| 407E20000 NON-TRACKING TACK COAT | 17,771 GAL | $3 | $53k | 2% |
| 644E00104 EDGE LINE, 6" | 17.44 MILE | $2,628 | $46k | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $35,000 | $35k | 2% |
| 644E00300 CENTER LINE | 8.74 MILE | $3,875 | $34k | 2% |