DEL-SR 61-04.71 (at Wilson Rd)
DEL County · est $1.9M
Bid dateThursday, March 11—
DEL County · est $1.9M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 8%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 101 more items below.
| Item | Quantity | R1Trucco Construction CO INC | R2Complete General Construction Company | R3Shelly & Sands INC | R4Double Z Construction Company | R5Shelly Company | R6Strawser Paving CO INC | R7Rietschlin Construction INC | % of bid |
|---|---|---|---|---|---|---|---|---|---|
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 2,507 CY | $114 | $111 | $134 | $111 | $111 | $145 | $123 | 22% |
| 304E20000 AGGREGATE BASE | 2,533 CY | $53.95 | $42.00 | $48.50 | $60.00 | $44.75 | $49.34 | $58.25 | 11% |
| Item | Quantity | R1Trucco Construction CO INC | R2Complete General Construction Company | R3Shelly & Sands INC | R4Double Z Construction Company | R5Shelly Company | R6Strawser Paving CO INC | R7Rietschlin Construction INC |
|---|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $8,500 | $17,000 | $23,700 | $30,000 | $15,000 | $5,184 | $65,000 |
| 202E11000 STRUCTURE REMOVED | 1 LS | $1,314 | $800 | $3,000 | $2,000 | $7,500 | $5,537 | $15,000 |
| 202E23000 PAVEMENT REMOVED |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 659E00300 TOPSOIL | 2,409 CY | $56.35 | $15.00 | $10.00 | $30.00 | $17.00 | $23.72 | $15.75 | 11% |
| 441E10200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 446 (479 CY | $139 | $140 | $142 | $140 | $140 | $174 | $150 | 5% |
| 609E12000 COMBINATION CURB AND GUTTER, TYPE 2 | 3,389 FT | $19.10 | $21.00 | $26.00 | $23.00 | $18.25 | $20.78 | $21.25 | 5% |
| 832E30000 EROSION CONTROL | 62,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 5% |
| 203E10000 EXCAVATION | 15,710 CY | $3.85 | $9.00 | $8.50 | $15.50 | $17.50 | $10.60 | $13.00 | 5% |
| 441E10000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (446), PG | 345 CY | $165 | $154 | $150 | $154 | $154 | $198 | $178 | 4% |
| 611E53200 48" X 76" CONDUIT, TYPE A, 706.04 | 92 FT | $572 | $475 | $450 | $450 | $495 | $523 | $725 | 4% |
| 204E30010 GRANULAR MATERIAL, TYPE B | 1,230 CY | $39.00 | $44.00 | $38.00 | $35.00 | $38.75 | $30.15 | $46.00 | 4% |
| 605E14000 6" BASE PIPE UNDERDRAINS | 3,969 FT | $10.75 | $8.00 | $7.50 | $7.00 | $11.42 | $7.30 | $10.75 | 3% |
| 452E12010 8" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 900 SY | $46.65 | $60.00 | $60.00 | $50.00 | $60.00 | $53.59 | $58.50 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $38,085 | $40,000 | $40,000 | $40,000 | $30,000 | $50,000 | $65,000 | 3% |
| 611E20700 48" CONDUIT, TYPE A, 706.02 | 136 FT | $263 | $240 | $201 | $220 | $243 | $214 | $281 | 3% |
| 609E70000 4" CONCRETE MEDIAN | 926 SY | $34.30 | $30.00 | $36.00 | $40.00 | $39.00 | $30.86 | $42.25 | 2% |
| 609E24510 CURB, TYPE 4-C | 2,052 FT | $12.85 | $25.00 | $31.00 | $17.00 | $12.00 | $19.13 | $13.00 | 2% |
| 625E10490 LIGHT POLE, CONVENTIONAL, AT12B40 | 10 EACH | $2,316 | $2,200 | $2,316 | $2,316 | $2,300 | $2,369 | $2,595 | 2% |
| 203E20000 EMBANKMENT | 7,498 CY | $2.90 | $5.00 | $8.00 | $4.00 | $7.25 | $8.42 | $9.25 | 2% |
| 614E12420 DETOUR SIGNING | 1 LS | $21,079 | $25,000 | $12,000 | $26,000 | $24,170 | $26,643 | $21,300 | 2% |
| 878E25000 INSPECTION AND COMPACTION TESTING OF UNBOUND MATER | 1 LS | $20,000 | $10,000 | $7,900 | $8,000 | $17,500 | $10,368 | $17,500 | 2% |
| 7,918 SY |
| $1.89 |
| $4.00 |
| $3.00 |
| $3.00 |
| $3.50 |
| $6.54 |
| $4.75 |
| 202E30204 STEPS REMOVED | 1 LS | $68.00 | $350 | $75.00 | $100 | $275 | $308 | $450 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 610 FT | $6.00 | $12.00 | $10.00 | $9.00 | $38.75 | $12.34 | $21.75 |
| 202E35200 PIPE REMOVED, OVER 24" | 57 FT | $35.58 | $28.00 | $12.00 | $10.00 | $55.75 | $31.55 | $78.25 |
| 202E53100 MAILBOX REMOVED | 3 EACH | $52.00 | $200 | $30.00 | $25.00 | $48.00 | $51.30 | $120 |
| 202E58100 CATCH BASIN REMOVED | 3 EACH | $596 | $500 | $100 | $300 | $575 | $291 | $570 |
| 202E60010 MONUMENT ASSEMBLY REMOVED | 1 EACH | $52.00 | $200 | $90.00 | $25.00 | $575 | $154 | $350 |
| 202E98000 REMOVAL MISC.: STONE GARAGE AND STONE WALL | 1 LS | $2,384 | $2,200 | $1,000 | $1,000 | $6,500 | $923 | $4,500 |
| 202E98100 REMOVAL MISC.: WATER WELL ABANDONED | 1 EACH | $1,303 | $1,800 | $1,000 | $200 | $500 | $1,620 | $2,800 |
| 204E10000 SUBGRADE COMPACTION | 12,052 SY | $1.20 | $1.75 | $1.25 | $2.00 | $1.25 | $1.15 | $1.25 |
| 204E13000 EXCAVATION OF SUBGRADE | 1,230 CY | $12.40 | $14.00 | $8.50 | $15.00 | $21.00 | $12.84 | $8.50 |
| 204E45000 PROOF ROLLING | 5 HOUR | $200 | $300 | $180 | $150 | $185 | $95.04 | $200 |
| 204E50000 GEOTEXTILE FABRIC | 2,950 SY | $2.10 | $2.00 | $0.65 | $1.00 | $0.49 | $2.17 | $1.00 |
| 204E51000 GEOGRID | 738 SY | $2.40 | $4.00 | $2.00 | $2.00 | $1.15 | $2.59 | $3.50 |
| 608E10000 4" CONCRETE WALK | 1,343 SF | $6.00 | $5.00 | $11.50 | $7.00 | $10.30 | $5.15 | $8.75 |
| 608E53020 DETECTABLE WARNING | 163 SF | $27.35 | $15.00 | $29.00 | $18.00 | $22.00 | $9.18 | $27.00 |
| 623E38500 MONUMENT ASSEMBLY | 1 EACH | $1,193 | $1,000 | $1,300 | $1,000 | $1,243 | $621 | $1,100 |
| 690E50100 SPECIAL - MAILBOX SUPPORT SYSTEM, SINGLE | 3 EACH | $550 | $485 | $155 | $150 | $145 | $162 | $167 |
| 601E11000 RIPRAP, TYPE D | 5 SY | $527 | $150 | $600 | $300 | $470 | $590 | $540 |
| 601E11001 RIPRAP, TYPE D, AS PER PLAN | 6 SY | $532 | $230 | $750 | $300 | $760 | $521 | $560 |
| 601E21050 TIED CONCRETE BLOCK MAT WITH TYPE 1 UNDERLAYMENT | 12 SY | $143 | $90.00 | $100 | $150 | $165 | $240 | $78.00 |
| 601E32104 ROCK CHANNEL PROTECTION, TYPE B WITH GEOTEXTILE FA | 24 CY | $133 | $172 | $136 | $100 | $205 | $191 | $103 |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 5 CY | $150 | $221 | $140 | $130 | $315 | $275 | $300 |
| 659E10000 SEEDING AND MULCHING | 20,169 SY | $0.72 | $0.72 | $0.68 | $0.72 | $0.65 | $0.52 | $0.75 |
| 659E14000 REPAIR SEEDING AND MULCHING | 1,008 SY | $0.72 | $0.72 | $0.69 | $0.72 | $2.00 | $1.61 | $0.75 |
| 659E15000 INTER-SEEDING | 1,008 SY | $0.72 | $0.72 | $0.69 | $0.72 | $2.00 | $1.61 | $0.75 |
| 659E20000 COMMERCIAL FERTILIZER | 2.72 TON | $605 | $605 | $669 | $605 | $400 | $322 | $725 |
| 659E31000 LIME | 4.17 ACRE | $80.00 | $80.00 | $153 | $80.00 | $10.00 | $8.05 | $200 |
| 659E35000 WATER | 109 MGAL | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $0.80 | $10.00 |
| 670E00700 DITCH EROSION PROTECTION | 1,248 SY | $2.00 | $2.00 | $1.34 | $2.00 | $1.90 | $1.53 | $1.50 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $1,500 | $1,500 | $2,200 | $1,500 | $2,125 | $2,295 | $2,600 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $2,452 | $4,650 | $5,700 | $4,250 | $720 | $2,938 | $3,250 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $8,549 | $8,549 | $9,000 | $10,000 | $6,189 | $9,233 | $9,400 |
| 602E20000 CONCRETE MASONRY | 6 CY | $2,522 | $1,500 | $1,500 | $1,500 | $2,200 | $2,047 | $2,160 |
| 605E13300 6" UNCLASSIFIED PIPE UNDERDRAINS | 735 FT | $12.90 | $24.00 | $9.00 | $6.00 | $11.25 | $7.53 | $13.90 |
| 611E00410 4" CONDUIT, TYPE F FOR UNDERDRAIN OUTLET | 105 FT | $21.35 | $9.00 | $15.00 | $7.00 | $31.75 | $10.14 | $13.25 |
| 611E01500 6" CONDUIT, TYPE F | 10 FT | $22.95 | $23.00 | $40.00 | $7.00 | $56.25 | $8.02 | $25.00 |
| 611E01500 6" CONDUIT, TYPE F, FOR DRAINAGE CONNECTION | 50 FT | $17.00 | $20.00 | $15.00 | $7.00 | $19.75 | $8.19 | $17.50 |
| 611E01800 8" CONDUIT, TYPE B | 50 FT | $17.00 | $30.00 | $15.00 | $7.00 | $34.00 | $10.26 | $26.00 |
| 611E02500 8" CONDUIT, TYPE E, FOR DRAINAGE CONNECTION | 50 FT | $14.00 | $17.00 | $15.00 | $7.00 | $27.00 | $10.25 | $34.00 |
| 611E03600 10" CONDUIT, TYPE E | 50 FT | $19.00 | $9.00 | $15.00 | $8.00 | $27.50 | $11.74 | $23.00 |
| 611E04400 12" CONDUIT, TYPE B | 242 FT | $62.30 | $76.00 | $60.00 | $60.00 | $54.00 | $89.26 | $66.00 |
| 611E04600 12" CONDUIT, TYPE C | 32 FT | $53.05 | $63.00 | $70.00 | $60.00 | $47.25 | $60.30 | $50.00 |
| 611E04600 12" CONDUIT, TYPE C, FOR DRAINAGE CONNECTION | 50 FT | $53.05 | $62.00 | $32.00 | $30.00 | $51.50 | $54.32 | $32.00 |
| 611E04900 12" CONDUIT, TYPE D, 706.01 OR 706.02 | 332 FT | $60.15 | $48.00 | $75.00 | $50.00 | $68.50 | $71.33 | $56.00 |
| 611E04900 12" CONDUIT, TYPE D, 706.02 | 42 FT | $57.95 | $50.00 | $50.00 | $50.00 | $59.00 | $71.57 | $77.00 |
| 611E05200 12" CONDUIT, TYPE F | 50 FT | $49.00 | $44.00 | $30.00 | $25.00 | $41.50 | $54.32 | $30.00 |
| 611E06100 15" CONDUIT, TYPE C | 28 FT | $55.00 | $67.00 | $75.00 | $30.00 | $53.75 | $75.01 | $60.00 |
| 611E98150 CATCH BASIN, NO. 3 | 4 EACH | $3,312 | $3,000 | $3,000 | $3,000 | $2,675 | $2,971 | $3,470 |
| 611E98180 CATCH BASIN, NO. 3A | 5 EACH | $2,352 | $2,700 | $2,500 | $3,000 | $2,050 | $2,326 | $2,590 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 6 EACH | $238 | $230 | $200 | $400 | $225 | $344 | $375 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 3.0" | 16 SY | $1.50 | $20.00 | $20.00 | $20.00 | $20.00 | $7.63 | $2.00 |
| 304E20001 AGGREGATE BASE, AS PER PLAN | 11 CY | $78.00 | $71.00 | $83.00 | $100 | $113 | $74.91 | $103 |
| 407E20000 NON-TRACKING TACK COAT | 1,644 GAL | $2.81 | $3.25 | $3.00 | $3.25 | $3.25 | $4.48 | $3.25 |
| 452E10010 6" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 210 SY | $64.15 | $80.00 | $71.00 | $75.00 | $65.00 | $70.55 | $51.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 1,224 SF | $3.40 | $3.00 | $1.40 | $6.00 | $1.00 | $1.08 | $1.50 |
| 609E26000 CURB, TYPE 6 | 811 FT | $10.70 | $17.00 | $22.00 | $18.00 | $11.75 | $11.85 | $13.00 |
| 609E31000 COMBINATION CURB AND GUTTER, TYPE 9 | 810 FT | $18.25 | $20.00 | $25.00 | $20.00 | $15.00 | $14.39 | $17.50 |
| 625E00450 CONNECTION, FUSED PULL APART | 30 EACH | $66.70 | $100 | $66.75 | $66.70 | $100 | $103 | $103 |
| 625E00480 CONNECTION, UNFUSED PERMANENT | 18 EACH | $71.30 | $120 | $71.50 | $71.30 | $120 | $124 | $103 |
| 625E14100 LIGHT POLE FOUNDATION, 24" X 8' DEEP | 10 EACH | $1,026 | $1,000 | $1,026 | $1,026 | $1,100 | $1,133 | $2,106 |
| 625E23200 NO. 4 AWG 2400 VOLT DISTRIBUTION CABLE | 708 FT | $3.12 | $2.50 | $3.12 | $3.12 | $2.50 | $2.58 | $3.50 |
| 625E23400 NO. 10 AWG POLE AND BRACKET CABLE | 1,410 FT | $1.59 | $1.00 | $1.59 | $1.59 | $1.00 | $1.03 | $1.75 |
| 625E24320 1-1/2" DUCT CABLE WITH THREE NO. 4 AWG 2400 VOLT C | 1,058 FT | $7.56 | $9.00 | $7.56 | $7.56 | $9.00 | $9.27 | $10.00 |
| 625E25902 CONDUIT, JACKED OR DRILLED, 725.04, 3" | 196 FT | $62.48 | $45.00 | $62.48 | $62.48 | $44.00 | $45.33 | $50.00 |
| 625E26253 LUMINAIRE, CONVENTIONAL, SOLID STATE (LED), AS PER | 10 EACH | $612 | $500 | $612 | $612 | $500 | $515 | $486 |
| 625E29002 TRENCH, 24" DEEP | 918 FT | $7.85 | $7.00 | $7.85 | $7.85 | $7.00 | $7.21 | $12.00 |
| 625E30700 PULL BOX, 725.08, 18" | 7 EACH | $776 | $825 | $766 | $776 | $825 | $850 | $850 |
| 625E32000 GROUND ROD | 10 EACH | $329 | $250 | $329 | $329 | $250 | $258 | $287 |
| 625E34001 POWER SERVICE, AS PER PLAN | 1 EACH | $5,080 | $9,000 | $5,080 | $5,080 | $9,000 | $9,271 | $7,500 |
| 625E36010 UNDERGROUND WARNING/MARKING TAPE | 918 FT | $0.20 | $0.30 | $0.20 | $0.20 | $0.30 | $0.31 | $0.50 |
| 625E76000 ARC FLASH CALCULATIONS AND LABEL, HIGHWAY LIGHTING | 1 EACH | $146 | $1,050 | $146 | $146 | $1,050 | $1,082 | $2,300 |
| 621E00100 RPM | 31 EACH | $85.00 | $119 | $110 | $70.00 | $85.00 | $119 | $76.00 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 195 FT | $8.50 | $11.80 | $11.80 | $8.50 | $7.35 | $7.41 | $9.25 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 390 FT | $15.00 | $13.65 | $13.65 | $15.00 | $6.35 | $6.40 | $16.25 |
| 630E08600 SIGN POST REFLECTOR | 8 EACH | $45.00 | $45.00 | $45.00 | $45.00 | $43.90 | $44.25 | $49.00 |
| 630E80100 SIGN, FLAT SHEET | 252.7 SF | $18.50 | $15.00 | $15.00 | $18.50 | $16.85 | $16.98 | $20.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 18 EACH | $20.00 | $10.00 | $20.00 | $20.00 | $26.35 | $26.56 | $22.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 3 EACH | $75.00 | $55.00 | $75.00 | $75.00 | $46.05 | $46.41 | $81.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 18 EACH | $20.00 | $15.00 | $20.00 | $20.00 | $37.95 | $38.25 | $22.00 |
| 630E86010 REMOVAL OF GROUND MOUNTED POST SUPPORT AND REERECT | 3 EACH | $225 | $85.00 | $225 | $225 | $68.45 | $68.99 | $243 |
| 642E00300 CENTER LINE, TYPE 1 | 0.49 MILE | $5,210 | $915 | $6,775 | $915 | $4,395 | $4,430 | $1,000 |
| 644E00104 EDGE LINE, 6" | 0.81 MILE | $6,140 | $6,000 | $5,642 | $6,000 | $4,000 | $4,031 | $6,500 |
| 644E00300 CENTER LINE | 0.33 MILE | $6,300 | $9,156 | $13,357 | $9,000 | $6,000 | $6,047 | $9,900 |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 244 FT | $7.00 | $7.65 | $7.00 | $7.65 | $6.00 | $6.05 | $8.50 |
| 644E01510 DOTTED LINE, 6" | 158 FT | $2.50 | $2.00 | $3.00 | $2.00 | $2.00 | $2.02 | $2.25 |
| 647E20960 YIELD LINE, TYPE A90 | 64 FT | $7.00 | $12.55 | $24.89 | $12.55 | $45.00 | $45.35 | $13.75 |
| 653E10000 TOPSOIL FURNISHED AND PLACED | 116 CY | $56.10 | $59.00 | $59.00 | $50.00 | $29.00 | $53.62 | $32.50 |
| 661E30070 EVERGREEN SHRUB, 2.5' HEIGHT (JUNIPERUS CHINENSIS | 6 EACH | $100 | $100 | $95.00 | $100 | $410 | $212 | $100 |
| 662E31000 LANDSCAPE WATERING | 1 GAL | $200 | $200 | $75.00 | $200 | $180 | $101 | $120 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 32 HOUR | $76.30 | $61.00 | $65.00 | $65.00 | $65.00 | $63.18 | $72.00 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 40 CY | $322 | $295 | $175 | $275 | $275 | $242 | $432 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 16 SNMT | $816 | $650 | $800 | $500 | $600 | $1,047 | $650 |
| 616E10000 WATER | 22 MGAL | $61.00 | $100 | $40.00 | $10.00 | $1.00 | $61.56 | $10.00 |
| 617E25000 WATER | 1 MGAL | $61.00 | $1,000 | $50.00 | $80.00 | $1.00 | $61.56 | $10.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $11,407 | $13,000 | $10,000 | $20,000 | $13,500 | $13,492 | $20,000 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $5,200 | $5,000 | $12,000 | $22,000 | $15,000 | $10,000 | $50,000 |
| 619E16010 FIELD OFFICE, TYPE B | 4 MNTH | $1,875 | $2,800 | $2,050 | $1,500 | $1,600 | $1,620 | $1,000 |
| 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P | 1 LS | $16,400 | $9,000 | $15,839 | $25,000 | $32,500 | $15,000 | $20,500 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 2,507 CY | $114 | $286k | 17% |
| 304E20000 AGGREGATE BASE | 2,533 CY | $53.95 | $137k | 8% |
| 659E00300 TOPSOIL | 2,409 CY | $56.35 | $136k | 8% |
| 441E10200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 446 (479 CY | $139 | $67k | 4% |
| 609E12000 COMBINATION CURB AND GUTTER, TYPE 2 | 3,389 FT | $19.1 | $65k | 4% |
| 832E30000 EROSION CONTROL | 62,000 EACH | $1 | $62k | 4% |
| 203E10000 EXCAVATION | 15,710 CY | $3.85 | $60k | 3% |
| 441E10000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (446), PG | 345 CY | $165 | $57k | 3% |
| 611E53200 48" X 76" CONDUIT, TYPE A, 706.04 | 92 FT | $571.95 | $53k | 3% |
| 204E30010 GRANULAR MATERIAL, TYPE B | 1,230 CY | $39 | $48k | 3% |