WYA-SRTS Carey
WYA County · est $0.3M
Bid dateThursday, March 11—
WYA County · est $0.3M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 5.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 45 more items below.
| Item | Quantity | R1Smith Paving & Excavating INC | R2Great Lakes Demolition Company | R3Rietschlin Construction INC | % of bid |
|---|---|---|---|---|---|
| 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (78 CY | $425 | $250 | $301 | 16% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 65 CY | $425 | $305 | $356 | 14% |
| 304E20000 AGGREGATE BASE | 311 CY | $53.00 | $65.00 | $54.00 | 8% |
| 203E10000 EXCAVATION | 736 CY | $20.50 | $25.00 | $25.25 | 7% |
| 202E23000 PAVEMENT REMOVED (ASPHALT) | 1,123 SY | $13.25 | $9.00 |
| Item | Quantity | R1Smith Paving & Excavating INC | R2Great Lakes Demolition Company | R3Rietschlin Construction INC |
|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $2,100 | $5,000 | $5,700 |
| 202E23000 PAVEMENT REMOVED | 60 SY | $16.00 | $9.00 | $29.00 |
| 202E30000 WALK REMOVED | 393 SF | $2.10 | $3.00 | $4.00 |
| 202E32000 CURB REMOVED | 23 FT | $11.85 | $7.00 | $16.00 |
| 608E13000 6" CONCRETE WALK | 321 SF | $6.30 | $10.00 | $13.50 |
| 608E53020 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $8.75 |
| 7% |
| 832E30000 EROSION CONTROL | 13,500 EACH | $1.00 | $1.00 | $1.00 | 7% |
| 608E12000 5" CONCRETE WALK | 1,810 SF | $5.40 | $7.00 | $8.25 | 5% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 22 CY | $400 | $395 | $265 | 4% |
| 659E00300 TOPSOIL | 175 CY | $45.00 | $55.00 | $37.00 | 4% |
| 619E16010 FIELD OFFICE, TYPE B | 3 MNTH | $2,500 | $450 | $1,700 | 4% |
| 644E00600 CROSSWALK LINE | 1,034 FT | $6.00 | $6.00 | $6.50 | 3% |
| 609E26000 CURB, TYPE 6 | 285 FT | $21.75 | $24.00 | $39.00 | 3% |
| 608E12000 5" CONCRETE WALK (A1) | 1,072 SF | $5.50 | $7.00 | $8.50 | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $5,000 | $6,500 | $8,100 | 2% |
| 624E10000 MOBILIZATION | 1 LS | $5,000 | $15,000 | $17,000 | 2% |
| 644E30000 REMOVAL OF PAVEMENT MARKING | 1,087 FT | $4.50 | $4.50 | $5.00 | 2% |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $4,000 | $2,500 | $6,600 | 2% |
| 608E52000 CURB RAMP | 440 SF | $8.20 | $8.00 | $19.00 | 2% |
| 203E20000 EMBANKMENT | 178 CY | $16.50 | $25.00 | $16.00 | 1% |
| 204E10000 SUBGRADE COMPACTION | 2,181 SY | $1.30 | $3.00 | $2.00 | 1% |
| 44 SF |
| $25.00 |
| $40.00 |
| $33.00 |
| 690E50600 SPECIAL - BOLLARD | 2 EACH | $950 | $500 | $1,350 |
| 659E00500 SEEDING AND MULCHING, CLASS 1 | 1,137 SY | $1.25 | $4.00 | $3.50 |
| 659E35000 WATER | 6.44 MGAL | $15.00 | $40.00 | $10.00 |
| 670E00500 SLOPE EROSION PROTECTION | 417 SY | $4.95 | $6.50 | $4.00 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $1,700 | $4,000 | $1,525 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $485 | $2,000 | $3,240 |
| 407E10000 TACK COAT | 203 GAL | $5.00 | $5.00 | $3.25 |
| 452E10010 6" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 32 SY | $56.70 | $90.00 | $100 |
| 452E12010 8" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 2 SY | $70.00 | $800 | $635 |
| 609E28000 CURB, TYPE 7 | 118 FT | $23.00 | $27.00 | $52.00 |
| 638E10900 SERVICE BOX ADJUSTED TO GRADE | 2 EACH | $160 | $550 | $380 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 132 FT | $12.00 | $12.50 | $13.00 |
| 630E80100 SIGN, FLAT SHEET | 66 SF | $24.00 | $25.00 | $26.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 1 EACH | $100 | $100 | $108 |
| 644E00100 EDGE LINE, 4" | 0.17 MILE | $8,000 | $8,000 | $8,700 |
| 644E00300 CENTER LINE | 0.07 MILE | $16,000 | $16,000 | $17,300 |
| 644E00500 STOP LINE | 86 FT | $8.00 | $8.00 | $9.00 |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 54 FT | $8.00 | $8.00 | $9.00 |
| 201E11000 CLEARING AND GRUBBING (A1) | 1 LS | $500 | $5,000 | $800 |
| 202E23000 PAVEMENT REMOVED (ASPHALT) (A1) | 2 SY | $25.00 | $9.00 | $185 |
| 202E32000 CURB REMOVED (A1) | 7 FT | $18.00 | $10.00 | $51.00 |
| 203E10000 EXCAVATION (A1) | 44 CY | $24.00 | $22.00 | $54.00 |
| 204E10000 SUBGRADE COMPACTION (A1) | 2 SY | $3.00 | $20.00 | $150 |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 (A1) | 1 CY | $800 | $500 | $265 |
| 304E20000 AGGREGATE BASE (A1) | 1 CY | $80.00 | $290 | $390 |
| 407E10000 TACK COAT (A1) | 1 GAL | $50.00 | $20.00 | $3.25 |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 1 CY | $1,000 | $900 | $366 |
| 608E52000 CURB RAMP (A1) | 62 SF | $8.30 | $10.00 | $33.00 |
| 614E11000 MAINTAINING TRAFFIC (A1) | 1 LS | $500 | $2,000 | $650 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING (A1) | 1 LS | $500 | $2,000 | $400 |
| 624E10000 MOBILIZATION (A1) | 1 LS | $500 | $5,000 | $1,000 |
| 638E10800 VALVE BOX ADJUSTED TO GRADE (A1) | 2 EACH | $160 | $500 | $380 |
| 659E00300 TOPSOIL (A1) | 27 CY | $45.00 | $55.00 | $48.00 |
| 659E00500 SEEDING AND MULCHING, CLASS 1 (A1) | 141 SY | $1.25 | $2.50 | $5.00 |
| 659E35000 WATER (A1) | 0.76 MGAL | $15.00 | $45.00 | $10.00 |
| 670E00500 SLOPE EROSION PROTECTION (A1) | 98 SY | $5.00 | $6.50 | $4.00 |
| 832E30000 EROSION CONTROL (A1) | 1,500 EACH | $1.00 | $1.00 | $1.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $2,500 | $10,000 | $2,900 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $2,500 | $2,500 | $2,800 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (78 CY | $425 | $33k | 14% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 65 CY | $425 | $28k | 11% |
| 304E20000 AGGREGATE BASE | 311 CY | $53 | $16k | 7% |
| 203E10000 EXCAVATION | 736 CY | $20.5 | $15k | 6% |
| 202E23000 PAVEMENT REMOVED (ASPHALT) | 1,123 SY | $13.25 | $15k | 6% |
| 832E30000 EROSION CONTROL | 13,500 EACH | $1 | $14k | 6% |
| 608E12000 5" CONCRETE WALK | 1,810 SF | $5.4 | $10k | 4% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 22 CY | $400 | $9k | 4% |
| 659E00300 TOPSOIL | 175 CY | $45 | $8k | 3% |
| 619E16010 FIELD OFFICE, TYPE B | 3 MNTH | $2,500 | $8k | 3% |