BUT-SR 4-13.90
BUT County · est $0.7M
Bid dateThursday, April 1—
BUT County · est $0.7M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 8.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 116 more items below.
| Item | Quantity | R1Rack & Ballauer Excavating CO INC | R2Eagle Bridge CO | R3Barrett Paving Materials INC | R4Eclipse CO LLC | R5John R Jurgensen Company | R6Complete General Construction Company | R7Ford Development CORP | % of bid |
|---|---|---|---|---|---|---|---|---|---|
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 216 CY | $190 | $197 | $220 | $215 | $197 | $197 | $220 | 11% |
| 611E10400 24" CONDUIT, TYPE B | 378 FT | $92.00 | $110 | $125 | $87.50 | $99.87 | $220 | $250 | 9% |
| 809E69101 |
| Item | Quantity | R1Rack & Ballauer Excavating CO INC | R2Eagle Bridge CO | R3Barrett Paving Materials INC | R4Eclipse CO LLC | R5John R Jurgensen Company | R6Complete General Construction Company | R7Ford Development CORP |
|---|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $9,500 | $3,500 | $2,500 | $4,000 | $990 | $5,000 | $5,000 |
| 202E32000 CURB REMOVED | 53 FT | $11.00 | $20.00 | $8.00 | $10.00 | $18.04 | $7.00 | $8.00 |
| 202E98100 REMOVAL MISC.:BOLLARD REMOVED |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 4 EACH |
| $7,695 |
| $7,339 |
| $7,339 |
| $7,911 |
| $7,339 |
| $6,900 |
| $8,100 |
| 8% |
| 809E69001 ADVANCE RADAR DETECTION, AS PER PLAN | 3 EACH | $8,015 | $7,684 | $7,684 | $8,283 | $7,684 | $7,000 | $8,435 | 6% |
| 615E25000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS B | 450 SY | $52.50 | $80.00 | $65.00 | $107 | $85.00 | $40.00 | $100 | 6% |
| 609E26000 CURB, TYPE 6 | 833 FT | $26.00 | $25.00 | $28.15 | $25.50 | $23.47 | $30.00 | $30.00 | 6% |
| 632E64010 SIGNAL SUPPORT FOUNDATION | 4 EACH | $5,300 | $5,091 | $5,091 | $5,488 | $5,091 | $10,850 | $5,700 | 5% |
| 624E10000 MOBILIZATION | 1 LS | $21,000 | $20,000 | $15,500 | $63,087 | $20,000 | $20,000 | $20,000 | 5% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 106 CY | $195 | $265 | $235 | $270 | $265 | $265 | $290 | 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $20,000 | $40,000 | $25,000 | $18,539 | $79,555 | $57,000 | $22,500 | 5% |
| 625E25908 CONDUIT, JACKED OR DRILLED, 725.052, 4" | 327 FT | $53.00 | $48.93 | $48.93 | $52.50 | $48.93 | $51.00 | $55.00 | 4% |
| 832E30000 EROSION CONTROL | 15,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 4% |
| 615E10000 ROADS FOR MAINTAINING TRAFFIC | 1 LS | $15,000 | $20,000 | $30,000 | $7,531 | $20,422 | $15,000 | $20,000 | 4% |
| 202E23000 PAVEMENT REMOVED | 1,072 SY | $13.50 | $18.00 | $13.00 | $13.50 | $15.73 | $15.00 | $10.00 | 4% |
| 633E65521 CABINET, TYPE 332, AS PER PLAN | 1 EACH | $12,775 | $12,140 | $12,140 | $13,086 | $12,140 | $12,850 | $13,340 | 3% |
| 204E30020 GRANULAR MATERIAL, TYPE C | 348 CY | $35.00 | $50.00 | $65.50 | $59.00 | $63.29 | $50.00 | $60.00 | 3% |
| 659E00300 TOPSOIL | 216 CY | $56.00 | $20.00 | $52.00 | $67.50 | $3.50 | $35.00 | $50.00 | 3% |
| 605E06000 4" BASE PIPE UNDERDRAINS | 1,215 FT | $9.00 | $10.00 | $18.00 | $10.50 | $20.84 | $20.00 | $10.00 | 3% |
| 611E99574 MANHOLE, NO. 3 | 3 EACH | $3,500 | $3,750 | $4,500 | $4,603 | $4,002 | $4,000 | $4,000 | 3% |
| 304E20000 AGGREGATE BASE | 182 CY | $57.00 | $75.00 | $100 | $66.00 | $146 | $60.00 | $60.00 | 3% |
| 11 EACH |
| $45.00 |
| $60.00 |
| $80.00 |
| $100 |
| $174 |
| $125 |
| $15.00 |
| 203E10000 EXCAVATION | 349 CY | $21.00 | $40.00 | $45.00 | $24.50 | $50.22 | $45.00 | $50.00 |
| 203E20000 EMBANKMENT | 140 CY | $21.00 | $40.00 | $37.50 | $21.00 | $43.26 | $13.00 | $20.00 |
| 204E10000 SUBGRADE COMPACTION | 1,020 SY | $3.30 | $3.00 | $2.50 | $2.50 | $3.15 | $3.00 | $2.00 |
| 204E13000 EXCAVATION OF SUBGRADE | 348 CY | $21.00 | $25.00 | $38.00 | $30.00 | $53.53 | $31.00 | $50.00 |
| 204E45000 PROOF ROLLING | 1 HOUR | $180 | $125 | $200 | $226 | $191 | $288 | $100 |
| 204E50000 GEOTEXTILE FABRIC | 1,020 SY | $1.30 | $1.50 | $2.70 | $1.50 | $6.36 | $3.00 | $1.00 |
| 608E10000 4" CONCRETE WALK | 87 SF | $12.00 | $12.00 | $12.50 | $36.50 | $12.28 | $10.00 | $15.00 |
| 608E52000 CURB RAMP | 337 SF | $22.00 | $20.00 | $22.50 | $40.00 | $19.80 | $15.00 | $30.00 |
| 690E50100 SPECIAL - MAILBOX SUPPORT SYSTEM, SINGLE | 1 EACH | $215 | $200 | $500 | $123 | $486 | $500 | $200 |
| 878E25000 INSPECTION AND COMPACTION TESTING OF UNBOUND MATER | 1 LS | $5,000 | $7,500 | $1,000 | $8,614 | $11,481 | $14,000 | $5,000 |
| 638E20824 SPECIAL - INSTALL 1" COPPER WATER SERVICE CONNECTI | 90 FT | $70.00 | $35.00 | $70.00 | $33.50 | $86.08 | $72.00 | $50.00 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $150 | $275 | $125 | $200 | $125 | $125 | $50.00 |
| 659E10000 SEEDING AND MULCHING | 1,949 SY | $1.00 | $4.00 | $1.60 | $1.50 | $1.60 | $1.60 | $2.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 97 SY | $0.45 | $2.50 | $1.60 | $0.50 | $1.60 | $1.60 | $1.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.27 TON | $1,200 | $1,250 | $1,000 | $1,598 | $1,000 | $1,000 | $1,000 |
| 659E31000 LIME | 0.4 ACRE | $250 | $5.00 | $150 | $333 | $150 | $150 | $100 |
| 659E35000 WATER | 11 MGAL | $50.00 | $20.00 | $1.00 | $66.50 | $1.00 | $1.00 | $1.00 |
| 601E21050 TIED CONCRETE BLOCK MAT WITH TYPE 1 UNDERLAYMENT | 30 SY | $87.00 | $70.00 | $135 | $65.00 | $106 | $80.00 | $100 |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 1.8 CY | $180 | $135 | $420 | $201 | $524 | $265 | $200 |
| 602E20000 CONCRETE MASONRY | 0.43 CY | $1,210 | $1,750 | $1,800 | $2,418 | $1,932 | $2,500 | $1,000 |
| 605E05200 4" UNCLASSIFIED PIPE UNDERDRAINS | 97 FT | $15.00 | $10.00 | $18.00 | $12.50 | $30.04 | $22.00 | $10.00 |
| 611E00400 4" CONDUIT, TYPE E | 40 FT | $15.00 | $15.00 | $18.00 | $1.50 | $29.21 | $12.00 | $10.00 |
| 611E00410 4" CONDUIT, TYPE F FOR UNDERDRAIN OUTLET | 70 FT | $30.00 | $25.00 | $18.00 | $18.00 | $32.68 | $13.00 | $10.00 |
| 611E04400 12" CONDUIT, TYPE B | 24 FT | $66.00 | $70.00 | $135 | $60.00 | $103 | $115 | $200 |
| 611E04600 12" CONDUIT, TYPE C | 8 FT | $60.00 | $125 | $130 | $85.00 | $128 | $130 | $150 |
| 611E07400 18" CONDUIT, TYPE B | 35 FT | $104 | $150 | $260 | $70.00 | $128 | $120 | $220 |
| 611E10600 24" CONDUIT, TYPE C | 80 FT | $72.00 | $85.00 | $110 | $88.50 | $99.18 | $140 | $200 |
| 611E98150 CATCH BASIN, NO. 3 | 2 EACH | $3,100 | $3,750 | $4,950 | $2,936 | $2,458 | $4,000 | $5,000 |
| 611E98180 CATCH BASIN, NO. 3A | 1 EACH | $2,600 | $3,100 | $3,750 | $2,345 | $2,033 | $3,300 | $3,500 |
| 611E98470 CATCH BASIN, NO. 2-2B | 1 EACH | $1,100 | $1,550 | $2,975 | $1,801 | $1,344 | $2,500 | $2,000 |
| 611E98540 CATCH BASIN, NO. 2-4 | 1 EACH | $1,850 | $2,650 | $4,000 | $2,442 | $2,271 | $3,600 | $3,000 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 1 EACH | $300 | $250 | $800 | $221 | $460 | $250 | $200 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.25" | 2,207 SY | $3.00 | $5.00 | $6.50 | $5.10 | $5.00 | $5.00 | $5.50 |
| 407E20000 NON-TRACKING TACK COAT | 330 GAL | $1.00 | $5.00 | $3.25 | $5.10 | $5.00 | $5.00 | $5.50 |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (41 CY | $220 | $255 | $230 | $260 | $255 | $255 | $280 |
| 441E50400 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448) | — | $450 | $650 | $525 | $660 | $650 | $650 | $720 |
| 441E50600 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (4 CY | $385 | $500 | $400 | $510 | $500 | $500 | $550 |
| 452E09010 4" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 26 SY | $90.00 | $90.00 | $113 | $188 | $94.99 | $60.00 | $100 |
| 452E12050 8" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC MS | 67 SY | $110 | $95.00 | $119 | $95.50 | $100 | $80.00 | $120 |
| 609E24510 CURB, TYPE 4-C | 87 FT | $43.00 | $45.00 | $47.50 | $46.50 | $40.47 | $45.00 | $40.00 |
| 621E00100 RPM, 1-WAY (WHITE | 7 EACH | $141 | $142 | $108 | $149 | $141 | $141 | $155 |
| 621E00100 RPM, 2-WAY (WHITE/RED) | 7 EACH | $141 | $142 | $108 | $149 | $141 | $141 | $155 |
| 621E00100 RPM, 2-WAY 9YELLOW/YELLOW) | 6 EACH | $141 | $142 | $108 | $149 | $141 | $141 | $155 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 335 FT | $12.00 | $11.50 | $11.50 | $12.00 | $11.50 | $12.00 | $13.00 |
| 630E08600 SIGN POST REFLECTOR | 22 EACH | $50.00 | $43.00 | $43.00 | $45.00 | $43.00 | $50.00 | $50.00 |
| 630E79101 SIGN HANGER ASSEMBLY, MAST ARM, AS PER PLAN | 6 EACH | $425 | $298 | $298 | $313 | $298 | $425 | $350 |
| 630E79500 SIGN SUPPORT ASSEMBLY, POLE MOUNTED | 1 EACH | $125 | $145 | $145 | $153 | $145 | $125 | $150 |
| 630E80100 SIGN, FLAT SHEET | 148 SF | $25.00 | $17.50 | $17.50 | $18.50 | $17.50 | $25.00 | $23.00 |
| 630E80510 SIGN, STREET NAME | 3 EACH | $250 | $118 | $118 | $124 | $118 | $250 | $130 |
| 630E83000 COVERING OF SIGN | 57 SF | $10.00 | $22.00 | $22.00 | $16.00 | $22.00 | $10.00 | $10.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 20 EACH | $20.00 | $15.00 | $15.00 | $16.00 | $15.00 | $20.00 | $15.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 2 EACH | $75.00 | $105 | $105 | $111 | $105 | $75.00 | $110 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 20 EACH | $25.00 | $25.00 | $25.00 | $26.50 | $25.00 | $25.00 | $10.00 |
| 644E00104 EDGE LINE, 6", WHITE | 0.24 MILE | $7,390 | $7,390 | $4,331 | $7,467 | $7,390 | $7,112 | $8,200 |
| 644E00300 CENTER LINE, 4", SOLID DOUBLE YELLOW | 0.03 MILE | $8,100 | $8,100 | $11,250 | $7,973 | $8,100 | $7,594 | $8,900 |
| 644E00400 CHANNELIZING LINE, 8" | 389 FT | $2.05 | $2.05 | $2.50 | $2.00 | $2.05 | $2.05 | $2.30 |
| 644E00500 STOP LINE, 24" | 99 FT | $5.55 | $5.55 | $7.00 | $6.00 | $5.55 | $5.55 | $6.00 |
| 644E00600 CROSSWALK LINE, 12" | 440 FT | $3.55 | $3.55 | $4.00 | $3.50 | $3.55 | $3.55 | $4.00 |
| 644E00700 TRANSVERSE/DIAGONAL LINE, 24", WHITE | 20 FT | $5.40 | $5.40 | $7.00 | $5.50 | $5.40 | $5.40 | $6.00 |
| 644E01300 LANE ARROW, 6' | 4 EACH | $100 | $100 | $163 | $105 | $100 | $100 | $110 |
| 644E01500 DOTTED LINE, 4", YELLOW | 302 FT | $2.00 | $2.00 | $2.75 | $2.50 | $2.00 | $2.00 | $2.20 |
| 644E30000 REMOVAL OF PAVEMENT MARKING | 550 FT | $2.40 | $2.40 | $3.45 | $2.50 | $2.40 | $2.40 | $2.70 |
| 625E00450 CONNECTION, FUSED PULL APART | 3 EACH | $90.00 | $110 | $110 | $119 | $110 | $90.00 | $121 |
| 625E00460 CONNECTION, UNFUSED PULL APART | 3 EACH | $85.00 | $116 | $116 | $125 | $116 | $95.00 | $127 |
| 625E18600 BRACKET ARM, MISC.: 30', INSTALLATION ONLY | 2 EACH | $250 | $225 | $225 | $243 | $225 | $585 | $248 |
| 625E23000 NO. 4 AWG 600 VOLT DISTRIBUTION CABLE | 310 FT | $2.35 | $4.03 | $4.03 | $4.50 | $4.03 | $2.75 | $4.40 |
| 625E23400 NO. 10 AWG POLE AND BRACKET CABLE | 150 FT | $1.00 | $2.09 | $2.09 | $2.50 | $2.09 | $3.50 | $2.30 |
| 625E25400 CONDUIT, 2", 725.04 | 28 FT | $17.00 | $19.47 | $19.47 | $21.00 | $19.47 | $27.50 | $22.00 |
| 625E25402 CONDUIT, 2", 725.05 | 12 FT | $8.00 | $18.92 | $18.92 | $20.50 | $18.92 | $15.00 | $21.00 |
| 625E25502 CONDUIT, 3", 725.05 | 51 FT | $9.00 | $17.80 | $17.80 | $19.00 | $17.80 | $18.00 | $20.00 |
| 625E25602 CONDUIT, 4", 725.05 | 90 FT | $14.00 | $17.15 | $17.15 | $18.50 | $17.15 | $21.00 | $19.00 |
| 625E26252 LUMINAIRE, CONVENTIONAL, SOLID STATE (LED), TYPE I | 2 EACH | $670 | $242 | $242 | $261 | $242 | $525 | $265 |
| 625E29000 TRENCH | 153 FT | $13.00 | $12.39 | $12.39 | $13.50 | $12.39 | $11.00 | $14.00 |
| 625E30706 PULL BOX, 725.08, 24" | 4 EACH | $1,080 | $852 | $852 | $919 | $852 | $1,200 | $930 |
| 625E31510 PULL BOX REMOVED | 4 EACH | $215 | $208 | $208 | $224 | $208 | $150 | $230 |
| 625E32000 GROUND ROD | 6 EACH | $290 | $242 | $242 | $261 | $242 | $265 | $265 |
| 625E36010 UNDERGROUND WARNING/MARKING TAPE | 153 FT | $1.00 | $1.81 | $1.81 | $2.00 | $1.81 | $1.10 | $2.00 |
| 625E75400 LIGHT POLE REMOVED | 2 EACH | $1,365 | $202 | $202 | $218 | $202 | $350 | $222 |
| 632E05007 VEHICULAR SIGNAL HEAD, (LED), 3-SECTION, 12" LENS, | 9 EACH | $990 | $858 | $858 | $925 | $858 | $700 | $940 |
| 632E05087 VEHICULAR SIGNAL HEAD, (LED), 5-SECTION, 12" LENS, | 3 EACH | $1,545 | $1,298 | $1,298 | $1,399 | $1,298 | $1,150 | $1,420 |
| 632E20731 PEDESTRIAN SIGNAL HEAD (LED), TYPE D2, COUNTDOWN, | 6 EACH | $650 | $680 | $680 | $733 | $680 | $600 | $750 |
| 632E25000 COVERING OF VEHICULAR SIGNAL HEAD | 12 EACH | $5.00 | $36.00 | $36.00 | $39.00 | $36.00 | $37.00 | $40.00 |
| 632E25010 COVERING OF PEDESTRIAN SIGNAL HEAD | 6 EACH | $5.00 | $36.00 | $36.00 | $39.00 | $36.00 | $30.00 | $40.00 |
| 632E26000 PEDESTRIAN PUSHBUTTON | 2 EACH | $235 | $250 | $250 | $270 | $250 | $300 | $275 |
| 632E40500 SIGNAL CABLE, 5 CONDUCTOR, NO. 14 AWG | 1,580 FT | $2.70 | $2.77 | $2.77 | $3.00 | $2.77 | $2.50 | $3.00 |
| 632E40700 SIGNAL CABLE, 7 CONDUCTOR, NO. 14 AWG | 1,580 FT | $2.90 | $3.13 | $3.13 | $3.50 | $3.13 | $3.00 | $3.50 |
| 632E64020 PEDESTAL FOUNDATION | 1 EACH | $725 | $1,072 | $1,072 | $1,155 | $1,072 | $1,700 | $1,200 |
| 632E68200 POWER CABLE, 2 CONDUCTOR, NO. 6 AWG | 45 FT | $3.85 | $4.61 | $4.61 | $5.00 | $4.61 | $4.25 | $5.00 |
| 632E70001 POWER SERVICE, AS PER PLAN | 1 EACH | $3,600 | $3,293 | $3,293 | $3,550 | $3,293 | $2,500 | $3,600 |
| 632E80700 SIGNAL SUPPORT, MISC.: SIGNAL SUPPORT, INSTALLATIO | 4 EACH | $2,100 | $2,339 | $2,339 | $2,521 | $2,339 | $2,300 | $2,600 |
| 632E90010 PEDESTAL, MISC.: PEDESTAL, TRANSFORMER BASE, INSTA | 1 EACH | $220 | $415 | $415 | $448 | $415 | $335 | $456 |
| 632E90100 REMOVAL OF TRAFFIC SIGNAL INSTALLATION | 1 EACH | $6,690 | $5,718 | $5,718 | $6,164 | $5,718 | $3,600 | $6,300 |
| 632E90208 REUSE OF STRAIN POLE | 1 EACH | $800 | $588 | $588 | $634 | $588 | $510 | $634 |
| 633E67101 CABINET FOUNDATION, AS PER PLAN | 1 EACH | $1,970 | $1,694 | $1,694 | $1,826 | $1,694 | $2,750 | $1,900 |
| 633E67200 CONTROLLER WORK PAD | 1 EACH | $1,340 | $565 | $565 | $609 | $565 | $1,200 | $620 |
| 633E68511 COMMUNICATIONS, AS PER PLAN | 1 EACH | $2,415 | $3,293 | $3,293 | $3,550 | $3,293 | $1,720 | $3,650 |
| 633E75001 UNINTERRUPTIBLE POWER SUPPLY (UPS), 1000 WATT, AS | 1 EACH | $5,865 | $5,787 | $5,787 | $6,238 | $5,787 | $5,200 | $6,340 |
| 809E60001 CCTV IP-CAMERA SYSTEM, DOME-TYPE, AS PER PLAN | 1 EACH | $9,040 | $9,244 | $9,244 | $9,965 | $9,244 | $8,850 | $10,101 |
| 809E69123 ATC V6.24 CONTROLLER, AS PER PLAN | 1 EACH | $4,640 | $5,823 | $5,823 | $6,277 | $5,823 | $4,000 | $6,323 |
| 410E12000 TRAFFIC COMPACTED SURFACE, TYPE A OR B | 70 CY | $50.00 | $65.00 | $160 | $76.00 | $102 | $41.86 | $50.00 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 40 HOUR | $70.00 | $75.00 | $85.00 | $68.50 | $93.83 | $81.00 | $50.00 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 10 CY | $200 | $500 | $240 | $258 | $683 | $620 | $150 |
| 614E21000 WORK ZONE CENTER LINE, CLASS I | 0.5 MILE | $3,455 | $3,455 | $4,100 | $3,628 | $3,455 | $3,455 | $3,800 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 0.2 MILE | $3,795 | $3,795 | $4,100 | $3,985 | $3,795 | $3,795 | $4,200 |
| 614E22010 WORK ZONE EDGE LINE, CLASS I, 6" | 0.5 MILE | $3,270 | $3,270 | $2,900 | $3,434 | $3,270 | $3,270 | $3,600 |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 0.1 MILE | $3,700 | $3,700 | $2,900 | $3,885 | $3,700 | $3,700 | $4,100 |
| 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 8", 642 PA | 490 FT | $0.55 | $0.55 | $3.22 | $0.50 | $0.55 | $0.55 | $0.60 |
| 614E26000 WORK ZONE STOP LINE, CLASS I | 20 FT | $2.50 | $2.50 | $9.00 | $2.50 | $2.50 | $2.50 | $2.75 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 30 FT | $2.40 | $2.40 | $8.00 | $2.50 | $2.40 | $2.40 | $2.70 |
| 614E30650 WORK ZONE ARROW, CLASS III, 642 PAINT | 4 EACH | $55.00 | $55.00 | $75.00 | $58.00 | $55.00 | $55.00 | $60.00 |
| 616E10000 WATER | 10 MGAL | $80.00 | $25.00 | $1.00 | $13.00 | $73.45 | $500 | $1.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $4,500 | $10,000 | $2,600 | $10,000 | $4,700 | $7,000 | $8,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $6,000 | $13,500 | $5,250 | $10,389 | $5,490 | $15,000 | $7,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 216 CY | $190 | $41k | 6% |
| 611E10400 24" CONDUIT, TYPE B | 378 FT | $92 | $35k | 5% |
| 809E69101 STOP LINE RADAR DETECTION, AS PER PLAN | 4 EACH | $7,695 | $31k | 5% |
| 809E69001 ADVANCE RADAR DETECTION, AS PER PLAN | 3 EACH | $8,015 | $24k | 4% |
| 615E25000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS B | 450 SY | $52.5 | $24k | 4% |
| 609E26000 CURB, TYPE 6 | 833 FT | $26 | $22k | 3% |
| 632E64010 SIGNAL SUPPORT FOUNDATION | 4 EACH | $5,300 | $21k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $21,000 | $21k | 3% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 106 CY | $195 | $21k | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $20,000 | $20k | 3% |