ATB-Culverts FY2021
ATB County · est $1.1M
Bid dateThursday, April 15—
ATB County · est $1.1M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 8.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 81 more items below.
| Item | Quantity | R1Marucci & Gaffney Excavating CO | R2Eclipse CO LLC | R3Catts Construction INC | R4Koski Construction CO | R5Platform Cement | R6Grade Line INC | % of bid |
|---|---|---|---|---|---|---|---|---|
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 359 CY | $235 | $208 | $250 | $230 | $240 | $323 | 11% |
| 611E94900 8' X 5' CONDUIT, TYPE A, 706.05 | 98 FT | $665 | $859 | $960 | $920 | $875 | $674 | 9% |
| 611E94800 8' X 4' CONDUIT, TYPE A, 706.05 | 90 FT | $658 | $884 | $952 | $1,000 |
| Item | Quantity | R1Marucci & Gaffney Excavating CO | R2Eclipse CO LLC | R3Catts Construction INC | R4Koski Construction CO | R5Platform Cement | R6Grade Line INC |
|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING (ATB-45-1769) | 1 LS | $2,000 | $5,116 | $4,718 | $2,500 | $2,700 | $4,500 |
| 201E11000 CLEARING AND GRUBBING (ATB-46-1106) | 1 LS | $1,500 | $3,385 | $520 | $2,500 | $2,700 | $2,500 |
| 201E11000 CLEARING AND GRUBBING (ATB-46-1192) | 1 LS | $2,000 | $5,116 | $520 | $2,500 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $800 |
| $668 |
| 8% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 242 CY | $210 | $235 | $275 | $285 | $220 | $413 | 7% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 120 CY | $400 | $756 | $494 | $335 | $875 | $1,200 | 7% |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 2,350 FT | $20.40 | $22.08 | $25.25 | $20.50 | $22.00 | $21.20 | 7% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (MASH 2016) | 19 EACH | $2,420 | $2,526 | $2,900 | $2,450 | $2,500 | $2,425 | 6% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $45,000 | $21,000 | $14,500 | $30,000 | $20,000 | $54,500 | 6% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $54,000 | $44,500 | $40,000 | $20,000 | $58,570 | 5% |
| 611E94910 8' X 6' CONDUIT, TYPE A, 706.05 | 41 FT | $803 | $1,145 | $1,162 | $920 | $1,000 | $770 | 4% |
| 203E20000 EMBANKMENT | 1,014 CY | $30.00 | $8.76 | $25.00 | $20.00 | $55.00 | $42.00 | 4% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 14,098 LB | $2.10 | $3.59 | $2.50 | $2.60 | $1.15 | $1.50 | 4% |
| 611E19200 42" CONDUIT, TYPE A, 707.01 OR 707.02 METALLIC COA | 118 FT | $250 | $167 | $402 | $375 | $85.00 | $367 | 4% |
| 304E20000 AGGREGATE BASE | 181 CY | $125 | $73.49 | $73.00 | $115 | $65.00 | $70.00 | 3% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $20,000 | $19,500 | $12,679 | $15,000 | $15,000 | $28,720 | 3% |
| 511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 48 CY | $400 | $1,500 | $820 | $575 | $1,300 | $1,150 | 3% |
| 202E23000 PAVEMENT REMOVED | 1,042 SY | $16.50 | $8.73 | $15.50 | $30.00 | $20.00 | $17.35 | 2% |
| 832E30000 EROSION CONTROL | 16,500 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 2% |
| 659E10000 SEEDING AND MULCHING | 7,854 SY | $2.00 | $2.29 | $1.00 | $1.25 | $1.25 | $2.00 | 2% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, T=3" | 2,782 SY | $5.00 | $5.10 | $6.00 | $10.00 | $5.20 | $14.00 | 2% |
| $2,700 |
| $2,500 |
| 201E11000 CLEARING AND GRUBBING (ATB-6-1723) | 1 LS | $2,000 | $3,385 | $520 | $2,500 | $2,700 | $2,500 |
| 201E11000 CLEARING AND GRUBBING (ATB-6-2804) | 1 LS | $2,000 | $1,654 | $520 | $2,500 | $2,700 | $2,500 |
| 201E11000 CLEARING AND GRUBBING (ATB-7-0090) | 1 LS | $2,000 | $2,808 | $520 | $2,500 | $2,700 | $2,500 |
| 202E11000 STRUCTURE REMOVED (ATB-46-1106) | 1 LS | $8,000 | $4,502 | $4,010 | $22,000 | $15,000 | $6,500 |
| 202E11000 STRUCTURE REMOVED (ATB-46-1192) | 1 LS | $8,000 | $4,298 | $4,010 | $22,000 | $18,000 | $6,500 |
| 202E11000 STRUCTURE REMOVED (ATB-6-2804) | 1 LS | $8,000 | $6,871 | $3,500 | $10,000 | $15,000 | $6,500 |
| 202E11000 STRUCTURE REMOVED (ATB-7-0090) | 1 LS | $8,000 | $4,407 | $4,010 | $10,000 | $16,000 | $6,500 |
| 202E35200 PIPE REMOVED, OVER 24" | 118 FT | $20.00 | $16.35 | $11.00 | $10.00 | $24.00 | $30.50 |
| 202E35201 PIPE REMOVED, OVER 24", AS PER PLAN | 80 FT | $20.00 | $59.08 | $11.00 | $40.00 | $24.00 | $11.25 |
| 202E38000 GUARDRAIL REMOVED | 3,298 FT | $2.00 | $2.08 | $1.00 | $2.00 | $2.00 | $2.00 |
| 202E75000 FENCE REMOVED | 86 FT | $7.50 | $4.59 | $5.50 | $10.00 | $8.00 | $10.00 |
| 202E98100 REMOVAL MISC.: INSPECTION WELL | 1 EACH | $130 | $254 | $425 | $75.00 | $250 | $1,500 |
| 202E98200 REMOVAL MISC.: CONDUIT | 5 FT | $15.00 | $5.07 | $100 | $10.00 | $80.00 | $20.00 |
| 203E10000 EXCAVATION | 471 CY | $7.50 | $9.48 | $44.00 | $20.00 | $25.00 | $40.00 |
| 203E20001 EMBANKMENT, AS PER PLAN | 50 CY | $30.00 | $11.70 | $26.00 | $20.00 | $60.00 | $42.00 |
| 203E35120 GRANULAR MATERIAL, TYPE C, 703.16 | 186 CY | $48.00 | $61.18 | $20.00 | $65.00 | $65.00 | $56.00 |
| 204E10000 SUBGRADE COMPACTION | 1,084 SY | $4.50 | $3.27 | $1.00 | $5.00 | $10.00 | $2.00 |
| 204E50000 GEOTEXTILE FABRIC, TYPE D | 370 SY | $4.00 | $1.17 | $2.75 | $2.00 | $3.50 | $1.00 |
| 606E17360 GUARDRAIL, TYPE MGS, LONG-SPAN | 400 FT | $21.60 | $23.75 | $27.00 | $22.00 | $25.00 | $22.80 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 5 EACH | $1,010 | $1,073 | $1,225 | $1,025 | $1,100 | $1,030 |
| 601E10000 RIPRAP | 12 SY | $220 | $207 | $194 | $350 | $65.00 | $210 |
| 601E32104 ROCK CHANNEL PROTECTION, TYPE B WITH GEOTEXTILE FA | 19 CY | $83.00 | $93.66 | $132 | $100 | $85.00 | $165 |
| 601E32110 ROCK CHANNEL PROTECTION, TYPE B WITH AGGREGATE FIL | 121 CY | $90.00 | $101 | $350 | $90.00 | $85.00 | $195 |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 2 CY | $90.00 | $119 | $291 | $200 | $160 | $165 |
| 659E00300 TOPSOIL | 872 CY | $15.00 | $47.01 | $43.00 | $45.00 | $45.00 | $36.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 393 SY | $0.27 | $2.29 | $0.50 | $1.25 | $1.25 | $5.00 |
| 659E20000 COMMERCIAL FERTILIZER | 1.06 TON | $400 | $294 | $50.00 | $1,000 | $850 | $900 |
| 659E31000 LIME | 1.62 ACRE | $20.00 | $29.38 | $50.00 | $1.00 | $1,000 | $100 |
| 659E35000 WATER | 41 MGAL | $0.50 | $1.18 | $4.00 | $1.00 | $50.00 | $150 |
| 602E20000 CONCRETE MASONRY | 10.8 CY | $1,200 | $1,496 | $1,010 | $1,050 | $850 | $850 |
| 611E00900 6" CONDUIT, TYPE B | 20 FT | $5.00 | $17.19 | $40.00 | $20.00 | $30.00 | $20.00 |
| 611E01400 6" CONDUIT, TYPE E | 20 FT | $5.00 | $10.98 | $40.00 | $15.00 | $20.00 | $20.00 |
| 611E01500 6" CONDUIT, TYPE F | 20 FT | $5.00 | $10.98 | $17.00 | $15.00 | $20.00 | $20.00 |
| 611E97400 CONDUIT, MISC.: TYPE B FOR DRAINAGE DISCHARGE CONT | 5 FT | $10.00 | $37.90 | $6.00 | $10.00 | $50.00 | $20.00 |
| 611E97400 CONDUIT, MISC.: TYPE C FOR DRAINAGE DISCHARGE CONT | 5 FT | $10.00 | $32.20 | $6.00 | $10.00 | $50.00 | $20.00 |
| 611E97400 CONDUIT, MISC.: TYPE E FOR DRAINAGE DISCHARGE CONT | 5 FT | $10.00 | $203 | $6.00 | $10.00 | $50.00 | $20.00 |
| 611E97400 CONDUIT, MISC.: TYPE F FOR DRAINAGE DISCHARGE CONT | 5 FT | $10.00 | $20.65 | $6.00 | $10.00 | $50.00 | $20.00 |
| 611E99720 INSPECTION WELL | 1 EACH | $100 | $363 | $1,110 | $750 | $500 | $1,500 |
| 255E20000 FULL DEPTH PAVEMENT SAWING | 328 FT | $10.00 | $4.08 | $2.50 | $10.00 | $5.00 | $3.00 |
| 407E20000 NON-TRACKING TACK COAT | 494 GAL | $3.00 | $4.08 | $2.00 | $5.00 | $5.50 | $3.00 |
| 408E10001 PRIME COAT, AS PER PLAN | 170 GAL | $15.00 | $5.10 | $3.00 | $3.00 | $3.25 | $6.00 |
| 411E10000 STABILIZED CRUSHED AGGREGATE | 200 CY | $40.00 | $77.54 | $22.00 | $88.50 | $75.00 | $70.00 |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN, PG64-22 | 25 CY | $90.00 | $204 | $230 | $200 | $75.00 | $70.00 |
| 621E00100 RPM | 21 EACH | $191 | $194 | $361 | $210 | $345 | $310 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (BIDIRECTIONAL) | 55 EACH | $7.80 | $8.12 | $9.00 | $8.00 | $10.00 | $7.80 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 12 FT | $25.00 | $40.80 | $29.00 | $25.00 | $27.00 | $25.00 |
| 630E80100 SIGN, FLAT SHEET, 730.20 | 90 SF | $18.00 | $22.44 | $20.99 | $20.00 | $20.00 | $18.00 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.44 MILE | $7,500 | $2,627 | $8,747 | $8,000 | $7,800 | $7,500 |
| 642E00300 CENTER LINE, TYPE 1 | 0.24 MILE | $1,500 | $2,627 | $17,496 | $17,500 | $16,000 | $15,000 |
| 614E12420 DETOUR SIGNING (ATB-45-1769) | 1 LS | $5,000 | $3,570 | $4,080 | $3,800 | $3,600 | $3,500 |
| 614E12420 DETOUR SIGNING (ATB-46-1106) | 1 LS | $5,000 | $5,574 | $4,080 | $2,350 | $2,000 | $1,950 |
| 614E12420 DETOUR SIGNING (ATB-46-1192) | 1 LS | $5,000 | $5,574 | $4,080 | $2,350 | $2,100 | $1,950 |
| 614E12420 DETOUR SIGNING (ATB-6-1723) | 1 LS | $5,000 | $4,029 | $4,080 | $4,200 | $4,000 | $3,750 |
| 614E12420 DETOUR SIGNING (ATB-6-2804) | 1 LS | $5,000 | $3,565 | $4,080 | $4,200 | $3,300 | $3,175 |
| 614E12420 DETOUR SIGNING (ATB-7-0090) | 1 LS | $5,000 | $3,111 | $3,500 | $3,500 | $3,300 | $3,000 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 50 CY | $70.00 | $166 | $50.00 | $275 | $100 | $150 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 12 SNMT | $725 | $1,071 | $850 | $750 | $1,000 | $725 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING (ATB-45-1769) | 1 LS | $5,000 | $7,352 | $3,290 | $5,000 | $5,250 | $1,500 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING (ATB-46-1106) | 1 LS | $5,000 | $5,193 | $6,550 | $5,000 | $5,250 | $1,500 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING (ATB-46-1192) | 1 LS | $5,000 | $5,193 | $1,652 | $5,000 | $5,250 | $1,500 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING (ATB-6-1723) | 1 LS | $5,000 | $5,254 | $7,775 | $5,000 | $5,250 | $1,500 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING (ATB-6-2804) | 1 LS | $5,000 | $5,254 | $6,550 | $4,500 | $5,250 | $1,500 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING (ATB-7-0090) | 1 LS | $5,000 | $5,162 | $5,325 | $3,500 | $5,250 | $1,500 |
| 503E21300 UNCLASSIFIED EXCAVATION (WINGWALL FOOTING) (ATB-46 | 1 LS | $5,000 | $3,020 | $13,019 | $4,500 | $25,000 | $5,000 |
| 503E21300 UNCLASSIFIED EXCAVATION (WINGWALL FOOTING) (ATB-46 | 1 LS | $5,000 | $3,095 | $13,019 | $4,500 | $25,000 | $5,000 |
| 503E21300 UNCLASSIFIED EXCAVATION (WINGWALL FOOTING) (ATB-6- | 1 LS | $5,000 | $2,959 | $14,274 | $4,500 | $25,000 | $5,000 |
| 503E21300 UNCLASSIFIED EXCAVATION (WINGWALL FOOTING) (ATB-7- | 1 LS | $5,000 | $4,514 | $11,367 | $4,500 | $25,000 | $5,000 |
| 511E46610 CLASS QC1 CONCRETE, HEADWALL | 7 CY | $900 | $1,689 | $709 | $750 | $1,250 | $1,000 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 221 SY | $25.00 | $23.46 | $22.50 | $30.00 | $15.00 | $30.35 |
| 512E33000 TYPE 2 WATERPROOFING | 361 SY | $30.00 | $31.75 | $18.50 | $28.00 | $20.00 | $31.00 |
| 512E33010 TYPE 3 WATERPROOFING | 290 SY | $40.00 | $40.58 | $32.50 | $35.00 | $30.00 | $43.95 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 114 SF | $10.00 | $6.43 | $1.90 | $10.00 | $14.00 | $2.00 |
| 518E21230 POROUS BACKFILL WITH GEOTEXTILE FABRIC (ATB-46-110 | 1 LS | $5,000 | $1,569 | $4,274 | $6,000 | $23,000 | $2,780 |
| 518E21230 POROUS BACKFILL WITH GEOTEXTILE FABRIC (ATB-46-119 | 1 LS | $5,000 | $1,406 | $4,274 | $6,000 | $27,000 | $2,780 |
| 518E21230 POROUS BACKFILL WITH GEOTEXTILE FABRIC (ATB-6-2804 | 1 LS | $5,000 | $1,119 | $3,043 | $5,000 | $27,000 | $2,780 |
| 518E21230 POROUS BACKFILL WITH GEOTEXTILE FABRIC (ATB-7-0090 | 1 LS | $5,000 | $1,202 | $3,043 | $4,500 | $25,000 | $2,780 |
| 619E16010 FIELD OFFICE, TYPE B | 9 MNTH | $700 | $400 | $850 | $2,000 | $850 | $1,850 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $12,000 | $28,000 | $18,500 | $12,000 | $15,000 | $22,440 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 359 CY | $235 | $84k | 8% |
| 611E94900 8' X 5' CONDUIT, TYPE A, 706.05 | 98 FT | $665 | $65k | 6% |
| 611E94800 8' X 4' CONDUIT, TYPE A, 706.05 | 90 FT | $658 | $59k | 6% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 242 CY | $210 | $51k | 5% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 120 CY | $400 | $48k | 5% |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 2,350 FT | $20.4 | $48k | 5% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (MASH 2016) | 19 EACH | $2,420 | $46k | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $45,000 | $45k | 4% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $40k | 4% |
| 611E94910 8' X 6' CONDUIT, TYPE A, 706.05 | 41 FT | $803 | $33k | 3% |