WAR-CR 19-02.67 S. Dixie Hwy
WAR County · est $0.8M
Bid dateThursday, April 15—
WAR County · est $0.8M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 6.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 22 more items below.
| Item | Quantity | R1John R Jurgensen Company | R2Barrett Paving Materials INC | % of bid |
|---|---|---|---|---|
| 253E02001 PAVEMENT REPAIR, AS PER PLAN | 1,300 CY | $315 | $370 | 40% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (1388 CY | $142 | $155 | 19% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 1,036 CY | $162 | $185 | 16% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $114,650 | $75,000 | 11% |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN, 3 | 28,620 SY | $1.17 | $2.50 | 3% |
| 617E10100 COMPACTED AGGREGATE | 260 CY | $82.29 | $100 | 2% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $35,000 | 2% |
| 407E20000 NON-TRACKING TACK COAT | 4,295 GAL |
| Item | Quantity | R1John R Jurgensen Company | R2Barrett Paving Materials INC |
|---|---|---|---|
| 644E00200 LANE LINE, 4" | 0.28 MILE | $705 | $705 |
| 644E00400 CHANNELIZING LINE, 8" | 478 FT | $1.15 | $1.15 |
| 644E00500 STOP LINE | 22 FT | $4.65 | $4.65 |
| 644E00600 CROSSWALK LINE | 123 FT | $2.65 | $2.65 |
| 644E00720 CHEVRON MARKING | 86 FT | $4.50 | $4.50 |
| 644E01000 RAILROAD SYMBOL MARKING | 2 EACH | $500 | $500 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $3.50 |
| $3.25 |
| 1% |
| 254E01600 PATCHING PLANED SURFACE | 2,857 SY | $3.70 | $1.00 | 1% |
| 644E00100 EDGE LINE, 4" | 3.2 MILE | $2,245 | $2,245 | 1% |
| 644E00300 CENTER LINE | 1.6 MILE | $4,050 | $4,050 | 1% |
| 209E72050 PREPARING SUBGRADE FOR SHOULDER PAVING | 3.2 MILE | $1,849 | $1,475 | 1% |
| 621E00100 RPM | 160 EACH | $26.25 | $26.25 | 0% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $4,043 | $7,300 | 0% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $3,031 | $3,350 | 0% |
| 614E22000 WORK ZONE EDGE LINE, CLASS I, 4" | 3.2 MILE | $765 | $765 | 0% |
| 617E25000 WATER | 1 MGAL | $1,858 | $50.00 | 0% |
| 608E52001 CURB RAMP, AS PER PLAN | 62 SF | $28.88 | $65.00 | 0% |
| 614E21000 WORK ZONE CENTER LINE, CLASS I | 1.6 MILE | $1,100 | $1,100 | 0% |
| 609E18001 COMBINATION CURB AND GUTTER, TYPE 3, AS PER PLAN | 7 FT | $243 | $230 | 0% |
| 10 EACH |
| $125 |
| $125 |
| 644E01400 WORD ON PAVEMENT, 72" | 2 EACH | $135 | $135 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 8 HOUR | $85.48 | $80.00 |
| 614E20000 WORK ZONE LANE LINE, CLASS I, 4" | 0.3 MILE | $540 | $540 |
| 614E20550 WORK ZONE LANE LINE, CLASS III, 4", 642 PAINT | 0.3 MILE | $195 | $195 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 1.6 MILE | $315 | $315 |
| 614E22350 WORK ZONE EDGE LINE, CLASS III, 4", 642 PAINT | 3.2 MILE | $490 | $490 |
| 614E23000 WORK ZONE CHANNELIZING LINE, CLASS I, 8" | 478 FT | $0.55 | $0.55 |
| 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 8", 642 PA | 478 FT | $0.50 | $0.50 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 22 FT | $2.50 | $2.50 |
| 614E30000 WORK ZONE ARROW, CLASS I | 10 EACH | $55.00 | $55.00 |
| 614E30650 WORK ZONE ARROW, CLASS III, 642 PAINT | 10 EACH | $50.00 | $50.00 |
| 614E31000 WORK ZONE WORD ON PAVEMENT, 72", CLASS I | 2 EACH | $65.00 | $65.00 |
| 614E31620 WORK ZONE WORD ON PAVEMENT, 72", CLASS III, 642 PA | 2 EACH | $60.00 | $60.00 |
| 614E32000 WORK ZONE RAILROAD SYMBOL MARKING, CLASS I | 2 EACH | $300 | $300 |
| 614E32210 WORK ZONE RAILROAD SYMBOL MARKING, CLASS III, 642 | 2 EACH | $290 | $290 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 253E02001 PAVEMENT REPAIR, AS PER PLAN | 1,300 CY | $315.38 | $410k | 39% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (1388 CY | $142.46 | $198k | 19% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 1,036 CY | $162.05 | $168k | 16% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $114,650 | $115k | 11% |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN, 3 | 28,620 SY | $1.17 | $33k | 3% |
| 617E10100 COMPACTED AGGREGATE | 260 CY | $82.29 | $21k | 2% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $20k | 2% |
| 407E20000 NON-TRACKING TACK COAT | 4,295 GAL | $3.5 | $15k | 1% |
| 254E01600 PATCHING PLANED SURFACE | 2,857 SY | $3.7 | $11k | 1% |
| 644E00100 EDGE LINE, 4" | 3.2 MILE | $2,245 | $7k | 1% |