ADA-US 52/SR 247-08.29/00.00
ADA County · est $1.6M
Bid dateThursday, May 13—
ADA County · est $1.6M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 6.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 14 more items below.
| Item | Quantity | R1Brown County Construction CO INC | R2Shelly Company | R3Brown County Asphalt INC | % of bid |
|---|---|---|---|---|---|
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 6,328 CY | $135 | $143 | $150 | 56% |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN (1 | 147,080 SY | $1.15 | $1.00 | $1.00 | 11% |
| 874E21000 LONGITUDINAL JOINT PREPARATION | 7.73 MILE | $9,991 | $1,750 | $2,100 | 5% |
| 254E01601 PATCHING PLANED SURFACE, AS PER PLAN | 29,416 SY | $1.90 | $1.75 | $2.00 | 4% |
| 617E10100 COMPACTED AGGREGATE | 783 CY | $65.81 | $58.00 |
| Item | Quantity | R1Brown County Construction CO INC | R2Shelly Company | R3Brown County Asphalt INC |
|---|---|---|---|---|
| 202E30000 WALK REMOVED | 100 SF | $17.00 | $18.50 | $15.00 |
| 209E60500 LINEAR GRADING | 16 MILE | $279 | $1,000 | $500 |
| 209E72051 PREPARING SUBGRADE FOR SHOULDER PAVING, AS PER PLA | 0.7 MILE | $3,892 | $1,000 | $500 |
| 608E52000 CURB RAMP | 100 SF | $34.00 | $21.50 | $30.00 |
| 608E53020 DETECTABLE WARNING | 16 SF | $56.67 | $15.00 | $50.00 |
| 832E30000 EROSION CONTROL |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $60.00 |
| 3% |
| 644E00104 EDGE LINE, 6" | 16.7 MILE | $3,055 | $2,975 | $2,695 | 3% |
| 253E01001 PAVEMENT REPAIR, AS PER PLAN | 400 SY | $126 | $89.50 | $100 | 3% |
| 407E20000 NON-TRACKING TACK COAT | 11,377 GAL | $3.50 | $3.25 | $3.00 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $30,000 | $40,000 | $30,000 | 2% |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 33.4 MILE | $839 | $400 | $740 | 2% |
| 644E00300 CENTER LINE | 8.2 MILE | $3,298 | $2,700 | $2,910 | 2% |
| 621E00100 RPM | 1,055 EACH | $24.12 | $21.28 | $22.90 | 2% |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 16.4 MILE | $873 | $770 | $770 | 1% |
| 251E01001 PARTIAL DEPTH PAVEMENT REPAIR (441), AS PER PLAN | 200 SY | $66.33 | $70.50 | $75.00 | 1% |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 1,055 EACH | $11.71 | $1.75 | $3.00 | 1% |
| 618E41000 RUMBLE STRIPES, EDGE LINE (ASPHALT CONCRETE) | 15.4 MILE | $550 | $895 | $825 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $8,388 | $8,500 | $6,082 | 1% |
| 614E12460 WORK ZONE MARKING SIGN | 66 EACH | $108 | $105 | $110 | 0% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $5,894 | $102,000 | $60,000 | 0% |
| 608E10000 4" CONCRETE WALK | 200 SF | $28.34 | $11.50 | $25.00 | 0% |
| 1,000 EACH |
| $1.00 |
| $1.00 |
| $1.00 |
| 617E25000 WATER | 8 MGAL | $6.23 | $5.00 | $1.00 |
| 618E43000 RUMBLE STRIPES, CENTER LINE (ASPHALT CONCRETE) | 7.73 MILE | $550 | $895 | $825 |
| 644E00600 CROSSWALK LINE | 80 FT | $13.09 | $3.00 | $11.55 |
| 644E01110 SCHOOL SYMBOL MARKING, 96" | 2 EACH | $567 | $585 | $500 |
| 409E30000 SAWING AND SEALING ASPHALT CONCRETE PAVEMENT JOINT | 80 FT | $28.90 | $15.45 | $15.50 |
| 409E30000 SAWING AND SEALING ASPHALT CONCRETE PAVEMENT JOINT | 72 FT | $28.90 | $15.45 | $15.50 |
| 409E30000 SAWING AND SEALING ASPHALT CONCRETE PAVEMENT JOINT | 64 FT | $28.90 | $15.45 | $15.50 |
| 409E30000 SAWING AND SEALING ASPHALT CONCRETE PAVEMENT JOINT | 72 FT | $28.90 | $15.45 | $15.50 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 6,328 CY | $135.06 | $855k | 55% |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN (1 | 147,080 SY | $1.15 | $169k | 11% |
| 874E21000 LONGITUDINAL JOINT PREPARATION | 7.73 MILE | $9,991 | $77k | 5% |
| 254E01601 PATCHING PLANED SURFACE, AS PER PLAN | 29,416 SY | $1.9 | $56k | 4% |
| 617E10100 COMPACTED AGGREGATE | 783 CY | $65.81 | $52k | 3% |
| 644E00104 EDGE LINE, 6" | 16.7 MILE | $3,055 | $51k | 3% |
| 253E01001 PAVEMENT REPAIR, AS PER PLAN | 400 SY | $126.15 | $50k | 3% |
| 407E20000 NON-TRACKING TACK COAT | 11,377 GAL | $3.5 | $40k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $30,000 | $30k | 2% |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 33.4 MILE | $838.72 | $28k | 2% |