ATH-SR 13-11.33
ATH County · est $0.1M
Bid dateThursday, May 27—
ATH County · est $0.1M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 23 more items below.
| Item | Quantity | R1Axis Civil Construction LLC | R2Wolf Creek Contracting Company LLC | R3Complete General Construction Company | % of bid |
|---|---|---|---|---|---|
| 624E10000 MOBILIZATION | 1 LS | $12,000 | $23,853 | $4,000 | 16% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $10,000 | $2,590 | $16,000 | 13% |
| 631E92001 SIGN FLASHER ASSEMBLY, AS PER PLAN (SOLAR-POWERED) | 2 EACH | $4,190 | $4,978 | $3,800 | 11% |
| 608E10000 4" CONCRETE WALK | 492 SF | $16.00 | $14.38 | $20.00 | 10% |
| 609E26000 CURB, TYPE 6 | 136 FT | $38.00 | $30.44 | $55.00 | 7% |
| 608E40000 CONCRETE STEPS, TYPE A | 25 FT | $175 | $188 | $225 | 6% |
| 608E52000 CURB RAMP | 303 SF | $13.00 |
| Item | Quantity | R1Axis Civil Construction LLC | R2Wolf Creek Contracting Company LLC | R3Complete General Construction Company |
|---|---|---|---|---|
| 202E23000 PAVEMENT REMOVED, CONCRETE | 10 SY | $50.00 | $21.72 | $38.00 |
| 202E23000 PAVEMENT REMOVED. ASPHALT | 17 SY | $22.00 | $29.02 | $50.00 |
| 202E30000 WALK REMOVED | 12 SF | $15.00 | $19.52 | $18.00 |
| 202E32000 CURB REMOVED | 80 FT | $10.00 | $3.80 | $16.00 |
| 203E10000 EXCAVATION | 11 CY | $50.00 | $39.33 | $40.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $9.27 |
| $26.00 |
| 5% |
| 632E64020 PEDESTAL FOUNDATION | 2 EACH | $1,800 | $1,252 | $1,500 | 5% |
| 608E15000 8" CONCRETE WALK | 76 SF | $44.00 | $12.79 | $25.00 | 4% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $2,500 | $594 | $9,000 | 3% |
| 630E80100 SIGN, FLAT SHEET | 83 SF | $28.00 | $33.27 | $20.00 | 3% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $2,000 | $726 | $4,000 | 3% |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 120 FT | $15.00 | $17.82 | $18.50 | 2% |
| 659E10000 SEEDING AND MULCHING | 216 SY | $8.00 | $11.88 | $14.50 | 2% |
| 644E00600 CROSSWALK LINE | 69 FT | $22.80 | $19.01 | $22.80 | 2% |
| 608E53020 DETECTABLE WARNING | 60 SF | $23.00 | $17.45 | $41.00 | 2% |
| 611E04900 12" CONDUIT, TYPE D | 20 FT | $65.00 | $112 | $146 | 2% |
| 632E90008 PEDESTAL, 15', TRANSFORMER BASE | 2 EACH | $625 | $743 | $1,400 | 2% |
| 203E20000 EMBANKMENT | 24 CY | $50.00 | $73.54 | $28.00 | 2% |
| 659E00300 TOPSOIL | 24 CY | $50.00 | $41.24 | $45.00 | 2% |
| 22 FT |
| $26.50 |
| $30.10 |
| $438 |
| 659E00100 SOIL ANALYSIS TEST | 1 EACH | $100 | $238 | $600 |
| 659E14000 REPAIR SEEDING AND MULCHING | 11 SY | $4.00 | $1.19 | $1.50 |
| 659E15000 INTER-SEEDING | 11 SY | $2.00 | $0.01 | $0.15 |
| 659E20000 COMMERCIAL FERTILIZER | 0.04 TON | $650 | $594 | $1,050 |
| 659E31000 LIME | 0.05 ACRE | $150 | $238 | $33.00 |
| 659E35000 WATER | 1.2 MGAL | $1.00 | $1.19 | $1.00 |
| 602E20000 CONCRETE MASONRY | 0.21 CY | $5,000 | $19,193 | $4,532 |
| 304E20000 AGGREGATE BASE | 1 CY | $250 | $92.30 | $525 |
| 630E08600 SIGN POST REFLECTOR | 16 EACH | $50.00 | $59.40 | $50.00 |
| 630E79500 SIGN SUPPORT ASSEMBLY, POLE MOUNTED | 4 EACH | $130 | $154 | $185 |
| 630E85000 REMOVAL OF GROUND MOUNTED SIGN AND STORAGE | 9 EACH | $25.00 | $29.70 | $15.00 |
| 630E86006 REMOVAL OF GROUND MOUNTED POST SUPPORT AND STORAGE | 7 EACH | $30.00 | $35.64 | $20.00 |
| 625E32000 GROUND ROD | 2 EACH | $250 | $341 | $250 |
| 630E83000 COVERING OF SIGN | 17 SF | $15.00 | $17.82 | $25.00 |
| 632E26000 PEDESTRIAN PUSHBUTTON | 2 EACH | $165 | $196 | $375 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $1,000 | $850 | $700 |
| 616E10000 WATER | 0.14 MGAL | $1.00 | $6.29 | $17,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 624E10000 MOBILIZATION | 1 LS | $12,000 | $12k | 14% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $10,000 | $10k | 12% |
| 631E92001 SIGN FLASHER ASSEMBLY, AS PER PLAN (SOLAR-POWERED) | 2 EACH | $4,190 | $8k | 10% |
| 608E10000 4" CONCRETE WALK | 492 SF | $16 | $8k | 9% |
| 609E26000 CURB, TYPE 6 | 136 FT | $38 | $5k | 6% |
| 608E40000 CONCRETE STEPS, TYPE A | 25 FT | $175 | $4k | 5% |
| 608E52000 CURB RAMP | 303 SF | $13 | $4k | 5% |
| 632E64020 PEDESTAL FOUNDATION | 2 EACH | $1,800 | $4k | 4% |
| 608E15000 8" CONCRETE WALK | 76 SF | $44 | $3k | 4% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $2,500 | $3k | 3% |