BEL-IR 470-03.22
BEL County · est $1.5M
Bid dateThursday, May 27—
BEL County · est $1.5M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 8.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 94 more items below.
| Item | Quantity | R1Complete General Construction Company | R2Shelly & Sands INC | R3Suburban Maintenance & Construction | R4INC Bridge Specialists INC | R5Great Lakes Construction CO | R6Swank Construction Company LLC | R7Bcc Ohio INC | % of bid |
|---|---|---|---|---|---|---|---|---|---|
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 25,589 SF | $8.00 | $8.55 | $10.50 | $8.00 | $8.00 | $8.60 | $8.40 | 16% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $170,000 | $141,700 | $90,000 | $105,900 | $246,000 | $115,000 |
| Item | Quantity | R1Complete General Construction Company | R2Shelly & Sands INC | R3Suburban Maintenance & Construction | R4INC Bridge Specialists INC | R5Great Lakes Construction CO | R6Swank Construction Company LLC | R7Bcc Ohio INC |
|---|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $3,000 | $1,800 | $2,000 | $1,950 | $5,000 | $4,000 | $377 |
| 202E23000 PAVEMENT REMOVED | 306 SY | $16.00 | $15.00 | $22.00 | $8.00 | $32.00 | $25.00 | $11.13 |
| 202E23500 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $153,180 |
| 13% |
| 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION | 1,257 SY | $90.00 | $75.00 | $48.00 | $73.00 | $55.00 | $60.00 | $61.22 | 9% |
| 526E25001 REINFORCED CONCRETE APPROACH SLABS (T=15"), AS PER | 322 SY | $300 | $300 | $300 | $290 | $360 | $300 | $342 | 7% |
| 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME | 25,589 SF | $3.00 | $3.22 | $2.50 | $4.00 | $3.00 | $2.15 | $3.15 | 6% |
| 848E10000 MICRO SILICA MODIFIED CONCRETE OVERLAY USING HYDRO | 1,257 SY | $60.00 | $65.00 | $89.00 | $51.00 | $70.00 | $125 | $62.74 | 6% |
| 516E11211 STRUCTURAL EXPANSION JOINT INCLUDING ELASTOMERIC S | 117 FT | $575 | $554 | $550 | $725 | $700 | $550 | $785 | 5% |
| 511E34448 CLASS QC2 CONCRETE, BRIDGE DECK (PARAPET) | 67 CY | $900 | $500 | $1,200 | $730 | $600 | $725 | $1,141 | 5% |
| 511E45710 CLASS QC1 CONCRETE, ABUTMENT | 53 CY | $1,000 | $1,125 | $1,100 | $564 | $750 | $775 | $1,189 | 4% |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 26,376 SF | $2.00 | $2.15 | $2.50 | $3.00 | $2.00 | $2.10 | $2.10 | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $40,000 | $105,100 | $75,000 | $59,500 | $34,000 | $100,000 | $71,388 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $40,000 | $40,000 | $73,314 | $40,000 | $40,000 | $39,665 | 3% |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 26,376 SF | $1.50 | $1.60 | $2.50 | $2.50 | $1.50 | $2.10 | $1.58 | 3% |
| 630E72340 OVERHEAD SIGN SUPPORT, TYPE TC-12.31, DESIGN 12 | 1 EACH | $39,125 | $42,000 | $32,000 | $39,125 | $32,000 | $32,000 | $41,081 | 3% |
| 503E21100 UNCLASSIFIED EXCAVATION | 384 CY | $95.00 | $110 | $35.00 | $35.00 | $160 | $25.00 | $102 | 3% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 66 CY | $420 | $335 | $420 | $404 | $288 | $420 | $302 | 2% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 18,293 LB | $1.50 | $1.62 | $1.60 | $2.00 | $1.70 | $2.40 | $1.79 | 2% |
| 511E34444 CLASS QC2 CONCRETE, BRIDGE DECK | 10 CY | $2,700 | $4,335 | $1,850 | $1,310 | $2,000 | $1,350 | $2,023 | 2% |
| 513E10200 STRUCTURAL STEEL MEMBERS, LEVEL UF | 5,390 LB | $5.00 | $5.00 | $7.00 | $3.00 | $3.36 | $5.00 | $6.22 | 2% |
| 516E46200 BEARING DEVICE, ROCKER | 14 EACH | $1,900 | $1,800 | $3,400 | $130 | $2,600 | $2,250 | $2,706 | 2% |
| 302 SY |
| $9.00 |
| $19.00 |
| $8.00 |
| $8.00 |
| $7.00 |
| $20.00 |
| $19.11 |
| 202E32000 CURB REMOVED | 104 FT | $8.00 | $12.00 | $4.00 | $14.00 | $7.00 | $8.00 | $7.25 |
| 202E38000 GUARDRAIL REMOVED | 482 FT | $2.00 | $3.00 | $2.80 | $2.00 | $2.80 | $3.00 | $2.10 |
| 203E10000 EXCAVATION | 176 CY | $32.00 | $22.00 | $35.00 | $52.00 | $55.00 | $18.00 | $13.98 |
| 203E20000 EMBANKMENT | 17 CY | $52.00 | $90.00 | $15.00 | $214 | $130 | $50.00 | $9.43 |
| 204E10000 SUBGRADE COMPACTION | 654 SY | $3.50 | $6.00 | $6.50 | $2.50 | $5.00 | $5.00 | $3.30 |
| 209E15000 RESHAPING UNDER GUARDRAIL | 6 STA | $30.00 | $160 | $30.00 | $30.00 | $235 | $200 | $31.50 |
| 606E15050 GUARDRAIL, TYPE MGS | 362.5 FT | $22.80 | $23.00 | $21.00 | $22.80 | $21.00 | $17.70 | $23.94 |
| 606E26050 ANCHOR ASSEMBLY, MGS TYPE B | 4 EACH | $1,985 | $2,065 | $1,950 | $1,985 | $1,950 | $2,350 | $2,084 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (NCHRP 350 OR MASH 201 | 1 EACH | $2,520 | $2,500 | $2,350 | $2,520 | $2,350 | $2,600 | $2,646 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 1 EACH | $1,020 | $1,165 | $1,100 | $1,020 | $1,100 | $965 | $1,071 |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 4 EACH | $2,235 | $2,330 | $2,200 | $2,235 | $2,200 | $2,130 | $2,347 |
| 601E20000 CRUSHED AGGREGATE SLOPE PROTECTION | 241 SY | $60.00 | $35.00 | $35.00 | $52.00 | $55.00 | $40.00 | $107 |
| 601E20001 CRUSHED AGGREGATE SLOPE PROTECTION, AS PER PLAN | 215 SY | $40.00 | $50.00 | $25.00 | $52.00 | $40.00 | $40.00 | $116 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $100 | $215 | $200 | $1,500 | $200 | $250 | $63.00 |
| 659E00300 TOPSOIL | 49 CY | $40.00 | $42.00 | $30.00 | $75.00 | $70.00 | $45.00 | $55.87 |
| 659E10000 SEEDING AND MULCHING | 436 SY | $5.95 | $7.00 | $3.00 | $5.95 | $5.95 | $4.00 | $6.25 |
| 659E14000 REPAIR SEEDING AND MULCHING | 22 SY | $1.00 | $1.00 | $0.50 | $1.00 | $1.00 | $5.00 | $1.05 |
| 659E20000 COMMERCIAL FERTILIZER | 0.06 TON | $670 | $710 | $800 | $670 | $670 | $1,000 | $704 |
| 659E31000 LIME | 0.09 ACRE | $40.00 | $43.00 | $50.00 | $40.00 | $40.00 | $500 | $42.00 |
| 659E35000 WATER | 5 MGAL | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $15.00 | $1.68 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 304E20000 AGGREGATE BASE | 109 CY | $100 | $140 | $70.00 | $31.00 | $75.00 | $125 | $103 |
| 407E10000 TACK COAT | 55 GAL | $2.50 | $2.00 | $2.50 | $4.00 | $2.40 | $2.50 | $2.52 |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 12 CY | $800 | $825 | $800 | $984 | $831 | $800 | $873 |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (16 CY | $430 | $385 | $430 | $564 | $683 | $430 | $717 |
| 609E24510 CURB, TYPE 4-C | 73 FT | $32.00 | $65.00 | $22.00 | $14.00 | $40.00 | $60.00 | $30.73 |
| 611E00400 4" CONDUIT, TYPE E | 40 FT | $12.50 | $2.00 | $10.00 | $1.75 | $1.75 | $10.00 | $1.84 |
| 625E00480 CONNECTION, UNFUSED PERMANENT | 6 EACH | $135 | $117 | $200 | $110 | $110 | $200 | $116 |
| 625E23200 NO. 4 AWG 2400 VOLT DISTRIBUTION CABLE | 636 FT | $6.00 | $5.00 | $3.50 | $4.00 | $4.00 | $3.50 | $4.20 |
| 625E25400 CONDUIT, 2", 725.04 | 308 FT | $40.00 | $30.00 | $18.00 | $28.00 | $28.00 | $18.00 | $29.40 |
| 625E29000 TRENCH | 101 FT | $15.00 | $13.00 | $10.00 | $12.00 | $12.00 | $10.00 | $12.60 |
| 625E30706 PULL BOX, 725.08, 24" | 2 EACH | $1,500 | $1,220 | $1,500 | $1,150 | $1,150 | $1,500 | $1,208 |
| 625E31510 PULL BOX REMOVED | 3 EACH | $450 | $212 | $250 | $200 | $200 | $250 | $210 |
| 625E39520 PULL BOX CLEANED | 1 EACH | $500 | $53.00 | $200 | $50.00 | $50.00 | $200 | $52.50 |
| 625E40000 SPECIAL - MAINTAIN EXISTING LIGHTING | 1 LS | $8,000 | $3,500 | $7,500 | $3,300 | $3,300 | $7,500 | $3,465 |
| 625E40010 SPECIAL - REPLACEMENT OF EXISTING LIGHTING UNIT | 1 EACH | $500 | $340 | $500 | $320 | $320 | $500 | $336 |
| 625E75801 DISCONNECT CIRCUIT, AS PER PLAN | 4 EACH | $175 | $300 | $250 | $280 | $280 | $250 | $294 |
| 626E00102 BARRIER REFLECTOR, TYPE 1 (BIDIRECTIONAL) | 8 EACH | $7.50 | $11.00 | $8.00 | $7.50 | $19.75 | $8.00 | $7.88 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (BIDIRECTIONAL) | 12 EACH | $8.25 | $11.00 | $10.00 | $8.25 | $10.00 | $8.00 | $8.66 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (ONE-WAY) | 4 EACH | $8.00 | $11.00 | $10.00 | $8.00 | $9.50 | $8.00 | $8.40 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 32.1 FT | $20.00 | $22.00 | $18.50 | $20.00 | $18.50 | $18.50 | $21.00 |
| 630E80100 SIGN, FLAT SHEET | 2 SF | $25.00 | $27.00 | $28.00 | $25.00 | $28.00 | $28.00 | $26.25 |
| 630E80224 SIGN, OVERHEAD EXTRUSHEET | 80 SF | $29.60 | $32.00 | $28.00 | $29.60 | $28.00 | $28.00 | $31.08 |
| 630E84510 RIGID OVERHEAD SIGN SUPPORT FOUNDATION | 1 EACH | $5,960 | $6,300 | $8,500 | $5,950 | $8,500 | $8,500 | $6,248 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 2 EACH | $65.00 | $70.00 | $65.00 | $65.00 | $65.00 | $65.00 | $68.25 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 1 EACH | $15.00 | $16.00 | $25.00 | $15.00 | $25.00 | $25.00 | $15.75 |
| 630E86311 REMOVAL OF STRUCTURE MOUNTED SIGN AND DISPOSAL, AS | 1 EACH | $1,785 | $1,900 | $5,000 | $1,785 | $2,500 | $2,500 | $1,874 |
| 646E10010 EDGE LINE, 6" | 0.12 MILE | $21,800 | $10,110 | $6,800 | $9,036 | $9,224 | $9,555 | $10,033 |
| 646E10200 CENTER LINE | 0.06 MILE | $33,900 | $15,800 | $12,500 | $4,548 | $10,162 | $14,888 | $15,632 |
| 646E10400 STOP LINE | 148 FT | $22.00 | $11.00 | $10.50 | $12.00 | $19.28 | $24.45 | $10.07 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 80 HOUR | $85.00 | $75.00 | $70.00 | $75.00 | $70.00 | $85.00 | $68.25 |
| 614E12384 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,500 | $2,050 | $2,200 | $2,730 | $1,825 | $2,050 | $2,027 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 10 CY | $585 | $215 | $150 | $500 | $350 | $150 | $252 |
| 614E13310 BARRIER REFLECTOR, TYPE 1 (BIDIRECTIONAL) | 16 EACH | $26.00 | $14.00 | $8.00 | $16.00 | $9.25 | $40.00 | $27.30 |
| 614E13360 OBJECT MARKER, TWO WAY | 16 EACH | $36.00 | $31.00 | $18.00 | $16.00 | $16.00 | $40.00 | $37.50 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 4 SNMT | $1,500 | $1,600 | $900 | $1,500 | $595 | $1,500 | $1,575 |
| 614E21200 WORK ZONE CENTER LINE, CLASS I, 740.06, TYPE I | 0.18 MILE | $2,950 | $3,125 | $8,500 | $2,950 | $17,000 | $2,950 | $3,098 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 0.14 MILE | $3,800 | $4,025 | $8,500 | $3,800 | $5,000 | $3,800 | $3,990 |
| 614E22210 WORK ZONE EDGE LINE, CLASS I, 6", 740.06, TYPE I | 0.39 MILE | $8,680 | $9,200 | $4,800 | $8,680 | $9,950 | $8,680 | $9,114 |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 0.28 MILE | $1,995 | $2,115 | $4,800 | $1,995 | $3,500 | $1,995 | $2,095 |
| 614E26400 WORK ZONE STOP LINE, CLASS I, 740.06, TYPE I | 190 FT | $12.50 | $14.00 | $8.00 | $12.50 | $11.25 | $12.50 | $13.10 |
| 616E10000 WATER | 10 MGAL | $60.00 | $45.00 | $1.00 | $1.00 | $62.00 | $20.00 | $1.45 |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 900 FT | $19.00 | $18.00 | $15.00 | $33.50 | $15.00 | $33.50 | $23.46 |
| 202E22900 APPROACH SLAB REMOVED | 303 SY | $35.00 | $18.50 | $35.00 | $58.00 | $50.00 | $45.00 | $60.65 |
| 503E11101 COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN | 1 LS | $23,000 | $21,900 | $55,000 | $71,500 | $60,000 | $55,000 | $63,785 |
| 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR | 50 LB | $3.50 | $1.30 | $2.00 | $2.00 | $2.00 | $10.00 | $2.19 |
| 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT | 1,160 EACH | $16.38 | $22.00 | $25.00 | $13.00 | $16.00 | $25.00 | $18.67 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 887 SY | $20.50 | $22.00 | $22.00 | $33.00 | $22.00 | $25.00 | $26.26 |
| 512E10300 SEALING CONCRETE BRIDGE DECKS WITH HMWM RESIN | 46 SY | $45.00 | $27.00 | $30.00 | $19.00 | $31.08 | $25.00 | $26.42 |
| 512E33000 TYPE 2 WATERPROOFING | 41 SY | $28.00 | $58.00 | $40.00 | $14.00 | $30.00 | $55.00 | $28.84 |
| 512E71500 SPECIAL - URETHANE TOP COAT SEALER | 49 SY | $35.00 | $38.00 | $30.00 | $35.00 | $15.00 | $85.00 | $33.91 |
| 514E00504 GRINDING FINS, TEARS, SLIVERS ON EXISTING STRUCTUR | 24 MNHR | $150 | $161 | $100 | $150 | $150 | $100 | $158 |
| 514E10000 FINAL INSPECTION REPAIR | 12 EACH | $200 | $214 | $100 | $200 | $200 | $100 | $210 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 17 SF | $10.00 | $12.00 | $12.00 | $9.00 | $13.00 | $17.00 | $23.88 |
| 516E41600 1" ELASTOMERIC BEARING PAD | 128 SF | $140 | $65.00 | $72.00 | $188 | $67.00 | $45.00 | $203 |
| 516E47001 JACKING AND TEMPORARY SUPPORT OF SUPERSTRUCTURE, A | 1 LS | $13,200 | $12,600 | $20,000 | $31,000 | $50,000 | $50,000 | $16,876 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 62 CY | $88.00 | $158 | $100 | $84.00 | $115 | $120 | $116 |
| 519E00100 SPECIAL - COMPOSITE FIBER WRAP SYSTEM | 439 SF | $60.00 | $40.00 | $45.00 | $109 | $37.75 | $100 | $86.77 |
| 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN | 100 SF | $120 | $101 | $95.00 | $110 | $95.00 | $150 | $89.97 |
| 526E90010 TYPE A INSTALLATION | 112 FT | $200 | $150 | $120 | $150 | $200 | $140 | $309 |
| 607E39900 VANDAL PROTECTION FENCE, 6' STRAIGHT, COATED FABRI | 320 FT | $82.75 | $80.00 | $75.00 | $73.75 | $92.51 | $105 | $79.50 |
| 611E99900 DRAINAGE STRUCTURE, MISC.: SCUPPER CLEANOUT | 7 EACH | $400 | $40.00 | $185 | $100 | $15.00 | $650 | $94.25 |
| 625E33000 STRUCTURE GROUNDING SYSTEM | 1 EACH | $2,700 | $6,350 | $6,000 | $1,300 | $4,400 | $10,000 | $1,500 |
| 848E30000 MICRO SILICA MODIFIED CONCRETE OVERLAY (VARIABLE T | 3 CY | $250 | $194 | $260 | $750 | $1,000 | $200 | $493 |
| 848E50000 HAND CHIPPING | 126 SY | $65.00 | $39.00 | $60.00 | $75.00 | $170 | $150 | $111 |
| 848E50100 TEST SLAB | 1 LS | $1,500 | $1,965 | $800 | $1,250 | $3,000 | $5,000 | $1,037 |
| 848E50200 FULL-DEPTH REPAIR | 4 CY | $850 | $1,550 | $500 | $500 | $1,200 | $4,500 | $1,449 |
| 848E50300 WEARING COURSE REMOVED, ASPHALT | 1,257 SY | $9.00 | $14.00 | $8.00 | $8.00 | $7.00 | $17.34 | $15.75 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $14,000 | $15,000 | $16,000 | $57,900 | $25,000 | $10,000 | $24,664 |
| 619E16010 FIELD OFFICE, TYPE B | 8 MNTH | $3,000 | $2,750 | $2,500 | $2,000 | $2,300 | $4,500 | $2,714 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $7,000 | $5,900 | $5,000 | $5,000 | $7,000 | $15,000 | $3,253 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 25,589 SF | $8 | $205k | 11% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $170,000 | $170k | 9% |
| 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION | 1,257 SY | $90 | $113k | 6% |
| 526E25001 REINFORCED CONCRETE APPROACH SLABS (T=15"), AS PER | 322 SY | $300 | $97k | 5% |
| 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME | 25,589 SF | $3 | $77k | 4% |
| 848E10000 MICRO SILICA MODIFIED CONCRETE OVERLAY USING HYDRO | 1,257 SY | $60 | $75k | 4% |
| 516E11211 STRUCTURAL EXPANSION JOINT INCLUDING ELASTOMERIC S | 117 FT | $575 | $67k | 4% |
| 511E34448 CLASS QC2 CONCRETE, BRIDGE DECK (PARAPET) | 67 CY | $900 | $60k | 3% |
| 511E45710 CLASS QC1 CONCRETE, ABUTMENT | 53 CY | $1,000 | $53k | 3% |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 26,376 SF | $2 | $53k | 3% |