How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
$100
2%
601E32100ROCK CHANNEL PROTECTION, TYPE B WITH FILTER
17 CY
$168
$195
$500
2%
832E30000EROSION CONTROL
2,000 EACH
$1.00
$1.00
$1.00
1%
103E05000PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM
1 LS
$1,734
$1,920
$5,000
1%
202E20011HEADWALL REMOVED, AS PER PLAN
2 EACH
$806
$1,265
$1,000
1%
624E10000MOBILIZATION
1 LS
$1,277
$4,500
$10,000
1%
623E10000CONSTRUCTION LAYOUT STAKES AND SURVEYING
1 LS
$1,020
$6,682
$5,000
1%
659E10000SEEDING AND MULCHING
190 SY
$5.29
$6.70
$15.00
1%
659E00300TOPSOIL
21 CY
$44.38
$35.00
$100
1%
617E10100COMPACTED AGGREGATE
8 CY
$114
$127
$100
1%
304E20000AGGREGATE BASE (DRIVEWAYS)
7 CY
$117
$134
$100
1%
201E11000CLEARING AND GRUBBING
1 LS
$390
$1,824
$10,000
0%
203E10000EXCAVATION
25 CY
$9.75
$47.00
$150
0%
611E97400CONDUIT, MISC.: VIDEO LOG
73 FT
$1.05
$1.18
$25.00
0%
$1.00
$10.00
8%
Top items by winning bid
Item
Qty
Unit price
Extended
%
833E12000CONDUIT RENEWAL USING SPRAY APPLIED STRUCTURAL LIN
73 FT
$996.45
$73k
52%
611E59100103" X 71" CONDUIT, TYPE A, 707.03 (0.168)
16 FT
$1,596
$26k
18%
602E20000CONCRETE MASONRY
7.1 CY
$1,297
$9k
7%
614E11000MAINTAINING TRAFFIC
1 LS
$5,841
$6k
4%
203E20000EMBANKMENT
150 CY
$38.06
$6k
4%
503E11100COFFERDAMS AND EXCAVATION BRACING
1 LS
$3,315
$3k
2%
202E70130SPECIAL - PIPE CLEANOUT OVER 48"
73 FT
$42.74
$3k
2%
601E32100ROCK CHANNEL PROTECTION, TYPE B WITH FILTER
17 CY
$168.46
$3k
2%
832E30000EROSION CONTROL
2,000 EACH
$1
$2k
1%
103E05000PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM