HAM-SR 264-00.00
HAM County · est $0.4M
Bid dateThursday, June 17—
HAM County · est $0.4M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 7.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 37 more items below.
| Item | Quantity | R1John R Jurgensen Company | R2Barrett Paving Materials INC | % of bid |
|---|---|---|---|---|
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (793 CY | $158 | $155 | 28% |
| 441E50100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 567 CY | $198 | $232 | 26% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $41,137 | $44,900 | 9% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 3" | 16,311 SY | $2.25 | $2.25 | 8% |
| 253E02000 PAVEMENT REPAIR | 150 CY | $242 | $545 | 8% |
| 407E20000 NON-TRACKING TACK COAT | 2,447 GAL | $5.00 | $3.25 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $10,000 | $10,000 | 2% |
| 253E02001 |
| Item | Quantity | R1John R Jurgensen Company | R2Barrett Paving Materials INC |
|---|---|---|---|
| 202E32000 CURB REMOVED | 54 FT | $20.00 | $43.00 |
| 203E10000 EXCAVATION | 1 CY | $165 | $260 |
| 608E10000 4" CONCRETE WALK | 89 SF | $18.82 | $46.00 |
| 609E26000 CURB, TYPE 6 | 21 FT | $45.77 | $186 |
| 659E00300 TOPSOIL, 4" | 3 CY | $200 | $375 |
| 659E35000 WATER | 1 MGAL | $1.00 | $25.00 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 7 CY |
| $1,337 |
| $645 |
| 2% |
| 608E52000 CURB RAMP | 274 SF | $32.57 | $23.00 | 2% |
| 253E02001 PAVEMENT REPAIR, AS PER PLAN, (A) | 2 CY | $3,718 | $845 | 2% |
| 644E00300 CENTER LINE | 1.08 MILE | $6,365 | $6,365 | 2% |
| 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P | 1 LS | $5,502 | $3,380 | 1% |
| 202E30000 WALK REMOVED | 398 SF | $12.00 | $5.75 | 1% |
| 632E26500 DETECTOR LOOP | 3 EACH | $1,480 | $2,007 | 1% |
| 621E00100 RPM | 90 EACH | $42.85 | $42.90 | 1% |
| 611E98630 CATCH BASIN ADJUSTED TO GRADE | 5 EACH | $633 | $900 | 1% |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 5 EACH | $612 | $900 | 1% |
| 659E10000 SEEDING AND MULCHING | 15 SY | $200 | $100 | 1% |
| 638E10800 VALVE BOX ADJUSTED TO GRADE | 5 EACH | $518 | $95.00 | 1% |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 80 EACH | $26.50 | $12.00 | 0% |
| 254E01600 PATCHING PLANED SURFACE | 164 SY | $4.00 | $1.00 |
| 617E10100 COMPACTED AGGREGATE | 7 CY | $289 | $250 |
| 617E20000 SHOULDER PREPARATION | 153 SY | $10.43 | $7.00 |
| 617E25000 WATER | 1 MGAL | $250 | $50.00 |
| 644E00100 EDGE LINE, 4" | 0.26 MILE | $4,800 | $4,800 |
| 644E00400 CHANNELIZING LINE, 8" | 249 FT | $2.15 | $2.15 |
| 644E00500 STOP LINE | 75 FT | $5.65 | $5.65 |
| 644E00600 CROSSWALK LINE | 333 FT | $3.65 | $3.65 |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 140 FT | $5.50 | $5.50 |
| 644E00900 ISLAND MARKING | 72 SF | $3.50 | $3.50 |
| 644E01300 LANE ARROW | 6 EACH | $205 | $205 |
| 632E27200 LOOP DETECTOR TIE IN | 3 EACH | $85.00 | $90.00 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 20 HOUR | $92.64 | $95.00 |
| 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT | 1.08 MILE | $1,810 | $1,810 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 1.08 MILE | $1,480 | $1,480 |
| 614E22100 WORK ZONE EDGE LINE, CLASS I, 4", 642 PAINT | 0.26 MILE | $1,475 | $1,475 |
| 614E22350 WORK ZONE EDGE LINE, CLASS III, 4", 642 PAINT | 0.26 MILE | $1,300 | $1,300 |
| 614E23200 WORK ZONE CHANNELIZING LINE, CLASS I, 8", 642 PAIN | 249 FT | $0.55 | $0.55 |
| 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 8", 642 PA | 249 FT | $0.50 | $0.50 |
| 614E25200 WORK ZONE TRANSVERSE/DIAGONAL LINE, CLASS I, 642 P | 140 FT | $2.25 | $2.25 |
| 614E25620 WORK ZONE TRANSVERSE/DIAGONAL LINE, CLASS III, 642 | 140 FT | $2.20 | $2.20 |
| 614E26200 WORK ZONE STOP LINE, CLASS I, 642 PAINT | 75 FT | $2.50 | $2.50 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 75 FT | $2.45 | $2.45 |
| 614E27200 WORK ZONE CROSSWALK LINE, CLASS I, 642 PAINT | 333 FT | $2.00 | $2.00 |
| 614E27620 WORK ZONE CROSSWALK LINE, CLASS III, 642 PAINT | 333 FT | $1.95 | $1.95 |
| 614E30200 WORK ZONE ARROW, CLASS I, 642 PAINT | 10 EACH | $55.00 | $55.00 |
| 614E30650 WORK ZONE ARROW, CLASS III, 642 PAINT | 10 EACH | $50.00 | $50.00 |
| 614E32700 WORK ZONE ISLAND MARKING, CLASS I, 642 PAINT | 72 SF | $2.00 | $2.00 |
| 614E32800 WORK ZONE ISLAND MARKING, CLASS III, 642 PAINT | 72 SF | $1.95 | $1.95 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $739 | $2,500 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (793 CY | $157.54 | $125k | 27% |
| 441E50100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 567 CY | $198.18 | $112k | 24% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $41,137 | $41k | 9% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 3" | 16,311 SY | $2.25 | $37k | 8% |
| 253E02000 PAVEMENT REPAIR | 150 CY | $241.94 | $36k | 8% |
| 407E20000 NON-TRACKING TACK COAT | 2,447 GAL | $5 | $12k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $10,000 | $10k | 2% |
| 253E02001 PAVEMENT REPAIR, AS PER PLAN, (B) | 7 CY | $1,337 | $9k | 2% |
| 608E52000 CURB RAMP | 274 SF | $32.57 | $9k | 2% |
| 253E02001 PAVEMENT REPAIR, AS PER PLAN, (A) | 2 CY | $3,718 | $7k | 2% |