HAN-SR 15-25.30/27.17
HAN County · est $0.6M
Bid dateThursday, July 15—
HAN County · est $0.6M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 7.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 36 more items below.
| Item | Quantity | R1Geddis Paving & Excavating INC | R2Shelly Company | % of bid |
|---|---|---|---|---|
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 478 CY | $200 | $198 | 18% |
| 203E10000 EXCAVATION | 6,230 CY | $14.00 | $17.00 | 17% |
| 304E20000 AGGREGATE BASE | 1,053 CY | $63.00 | $88.00 | 13% |
| 202E23000 PAVEMENT REMOVED | 4,166 SY | $11.75 | $10.00 | 9% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $45,000 | $31,000 | 9% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 148 CY | $225 | $275 | 6% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $20,000 | 4% |
| 614E24202 WORK ZONE DOTTED LINE, CLASS I, 6", 642 PAINT | 15,600 FT |
| Item | Quantity | R1Geddis Paving & Excavating INC | R2Shelly Company |
|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $2,300 | $20,000 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 85 FT | $32.20 | $15.00 |
| 203E20000 EMBANKMENT | 1,716 CY | $1.25 | $8.00 |
| 204E10000 SUBGRADE COMPACTION | 4,507 SY | $0.40 | $1.95 |
| 204E45000 PROOF ROLLING | 3 HOUR | $110 | $250 |
| 623E40500 REFERENCE MONUMENT | 3 EACH | $875 | $425 |
| 659E14000 REPAIR SEEDING AND MULCHING | 714 SY | $0.85 | $0.74 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $1.10 |
| $0.90 |
| 3% |
| 659E00300 TOPSOIL | 1,584 CY | $9.75 | $14.00 | 3% |
| 607E15000 FENCE, TYPE 47 | 785 FT | $19.50 | $16.80 | 3% |
| 659E10000 SEEDING AND MULCHING | 14,274 SY | $0.85 | $0.74 | 2% |
| 202E75000 FENCE REMOVED | 4,515 FT | $2.00 | $1.80 | 2% |
| 832E30000 EROSION CONTROL | 9,000 EACH | $1.00 | $1.00 | 2% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $8,500 | $7,200 | 2% |
| 623E40520 RIGHT-OF-WAY MONUMENT | 8 EACH | $900 | $325 | 1% |
| 202E35200 PIPE REMOVED, OVER 24" | 119 FT | $58.50 | $24.00 | 1% |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 6 SNMT | $1,150 | $1,000 | 1% |
| 670E00500 SLOPE EROSION PROTECTION | 3,133 SY | $2.20 | $1.90 | 1% |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 1,946 FT | $3.50 | $2.65 | 1% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 80 HOUR | $81.00 | $65.00 | 1% |
| 659E20000 COMMERCIAL FERTILIZER | 1.93 TON | $700 | $600 |
| 659E31000 LIME | 2.95 ACRE | $30.00 | $30.00 |
| 659E35000 WATER | 77 MGAL | $1.00 | $1.00 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $1,680 | $1,450 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $900 | $1,360 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $4,520 | $3,900 |
| 605E13300 6" UNCLASSIFIED PIPE UNDERDRAINS | 50 FT | $14.50 | $15.00 |
| 605E31100 AGGREGATE DRAINS | 539 FT | $10.65 | $15.00 |
| 611E01500 6" CONDUIT, TYPE F | 10 FT | $10.00 | $27.00 |
| 611E03600 10" CONDUIT, TYPE E | 10 FT | $11.00 | $29.00 |
| 611E04400 12" CONDUIT, TYPE B | 10 FT | $20.00 | $32.00 |
| 407E20000 NON-TRACKING TACK COAT | 233 GAL | $1.00 | $2.25 |
| 617E10100 COMPACTED AGGREGATE | 4 CY | $50.00 | $225 |
| 617E20000 SHOULDER PREPARATION | 23 SY | $14.60 | $20.00 |
| 618E40100 RUMBLE STRIPS, SHOULDER (ASPHALT CONCRETE) | 1,880 FT | $2.75 | $3.40 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 180 FT | $12.75 | $11.00 |
| 630E08600 SIGN POST REFLECTOR | 16 EACH | $52.00 | $45.00 |
| 630E80100 SIGN, FLAT SHEET | 52 SF | $25.00 | $22.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 59 EACH | $17.00 | $15.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 93 EACH | $17.00 | $15.00 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 1.36 MILE | $1,850 | $1,600 |
| 642E00204 LANE LINE, 6", TYPE 1 | 0.68 MILE | $900 | $800 |
| 642E30000 REMOVAL OF PAVEMENT MARKING | 500 FT | $8.70 | $7.50 |
| 614E12500 REPLACEMENT SIGN | 4 EACH | $220 | $192 |
| 614E12600 REPLACEMENT DRUM | 16 EACH | $56.00 | $56.00 |
| 614E22110 WORK ZONE EDGE LINE, CLASS I, 6", 642 PAINT | 3.54 MILE | $985 | $850 |
| 616E10000 WATER | 16 MGAL | $10.00 | $45.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $5,600 | $5,000 |
| 619E16010 FIELD OFFICE, TYPE B | 3 MNTH | $1,500 | $1,600 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 478 CY | $200 | $96k | 16% |
| 203E10000 EXCAVATION | 6,230 CY | $14 | $87k | 15% |
| 304E20000 AGGREGATE BASE | 1,053 CY | $63 | $66k | 11% |
| 202E23000 PAVEMENT REMOVED | 4,166 SY | $11.75 | $49k | 8% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $45,000 | $45k | 8% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 148 CY | $225 | $33k | 6% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $20k | 3% |
| 614E24202 WORK ZONE DOTTED LINE, CLASS I, 6", 642 PAINT | 15,600 FT | $1.1 | $17k | 3% |
| 659E00300 TOPSOIL | 1,584 CY | $9.75 | $15k | 3% |
| 607E15000 FENCE, TYPE 47 | 785 FT | $19.5 | $15k | 3% |