BEL-SR 7-05.88
BEL County · est $3.6M
Bid dateThursday, September 30—
BEL County · est $3.6M
Published by ODOTon this contract’s Proposal PDF · EDGE Goal: 7.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 21 more items below.
| Item | Quantity | R1Shelly & Sands INC | R2Nls Paving, INC | % of bid |
|---|---|---|---|---|
| 442E10351 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE B ( | 12,179 CY | $159 | $165 | 64% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (1-1/2") | 292,277 SY | $0.75 | $0.80 | 7% |
| 807E12010 WET REFLECTIVE EPOXY PAVEMENT MARKING, EDGE LINE, | 27.68 MILE | $4,150 | $4,000 | 4% |
| 251E01010 PARTIAL DEPTH PAVEMENT REPAIR (441) | 400 CY | $281 | $300 | 4% |
| 850E10010 GROOVING FOR 6" RECESSED PAVEMENT MARKING | — | $2,750 | $2,580 | 4% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $85,000 | $120,000 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $85,000 | $100,000 | 3% |
| 407E20000 NON-TRACKING TACK COAT | 24,847 GAL |
| Item | Quantity | R1Shelly & Sands INC | R2Nls Paving, INC |
|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $1,500 | $5,000 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 708 EACH | $5.00 | $4.00 |
| 646E10200 CENTER LINE | 0.5 MILE | $10,000 | $9,350 |
| 646E10400 STOP LINE | 185 FT | $13.00 | $12.00 |
| 646E10600 TRANSVERSE/DIAGONAL LINE | 875 FT | $13.00 | $12.00 |
| 646E10620 CHEVRON MARKING | 330 FT | $13.00 | $12.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $3.00 |
| $2.40 |
| 2% |
| 614E22056 WORK ZONE EDGE LINE, CLASS I, 6", 807 PAINT | 55.36 MILE | $1,150 | $2,095 | 2% |
| 617E10100 COMPACTED AGGREGATE | 711 CY | $53.00 | $55.00 | 1% |
| 807E12110 WET REFLECTIVE EPOXY PAVEMENT MARKING, LANE LINE, | 11.98 MILE | $2,500 | $2,350 | 1% |
| 808E18700 DIGITAL SPEED LIMIT (DSL) SIGN ASSEMBLY | 28 SNMT | $1,000 | $925 | 1% |
| 621E00100 RPM | 708 EACH | $30.00 | $28.00 | 1% |
| 442E00100 ANTI-SEGREGATION EQUIPMENT | 6,884 CY | $3.00 | $5.00 | 1% |
| 408E10001 PRIME COAT, AS PER PLAN | 6,811 GAL | $3.00 | $3.50 | 1% |
| 618E40100 RUMBLE STRIPS, SHOULDER (ASPHALT CONCRETE) | 123,912 FT | $0.15 | $0.20 | 1% |
| 209E60500 LINEAR GRADING | 14.52 MILE | $1,125 | $1,500 | 1% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 200 HOUR | $70.00 | $80.00 | 0% |
| 254E01600 PATCHING PLANED SURFACE | 8,768 SY | $1.50 | $1.75 | 0% |
| 614E20056 WORK ZONE LANE LINE, CLASS I, 6", 807 PAINT | 23.96 MILE | $500 | $875 | 0% |
| 646E20300 LANE ARROW | 17 EACH | $200 | $175 |
| 646E20320 WRONG WAY ARROW | 8 EACH | $250 | $225 |
| 807E12310 WET REFLECTIVE EPOXY PAVEMENT MARKING, CHANNELIZIN | 4,336 FT | $2.50 | $2.50 |
| 807E12410 WET REFLECTIVE EPOXY PAVEMENT MARKING, DOTTED LINE | 4,028 FT | $2.25 | $1.80 |
| 850E10110 GROOVING FOR 6" RECESSED PAVEMENT MARKING | — | $1.25 | $1.00 |
| 850E10130 GROOVING FOR 12" RECESSED PAVEMENT MARKING | — | $1.50 | $1.50 |
| 614E12460 WORK ZONE MARKING SIGN | 10 EACH | $100 | $95.00 |
| 614E12484 WORK ZONE INCREASED PENALTIES SIGN | 8 EACH | $100 | $95.00 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 0.4 MILE | $2,000 | $3,750 |
| 614E23110 WORK ZONE CHANNELIZING LINE, CLASS I, 12", 807 PAI | 8,672 FT | $0.60 | $1.20 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 370 FT | $7.25 | $11.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $10,400 | $10,000 |
| 619E16010 FIELD OFFICE, TYPE B | 4 MNTH | $1,400 | $1,300 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $4,002 | $7,500 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 442E10351 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE B ( | 12,179 CY | $159 | $1.94M | 62% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (1-1/2") | 292,277 SY | $0.75 | $219k | 7% |
| 807E12010 WET REFLECTIVE EPOXY PAVEMENT MARKING, EDGE LINE, | 27.68 MILE | $4,150 | $115k | 4% |
| 251E01010 PARTIAL DEPTH PAVEMENT REPAIR (441) | 400 CY | $281 | $112k | 4% |
| 850E10010 GROOVING FOR 6" RECESSED PAVEMENT MARKING | — | $2,750 | $109k | 3% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $85,000 | $85k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $85,000 | $85k | 3% |
| 407E20000 NON-TRACKING TACK COAT | 24,847 GAL | $3 | $75k | 2% |
| 614E22056 WORK ZONE EDGE LINE, CLASS I, 6", 807 PAINT | 55.36 MILE | $1,150 | $64k | 2% |
| 617E10100 COMPACTED AGGREGATE | 711 CY | $53 | $38k | 1% |