D05-CUL FY2022
D05 County · est $0.7M
Bid dateThursday, September 30—
D05 County · est $0.7M
Published by ODOTon this contract’s Proposal PDF · EDGE Goal: 6.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 40 more items below.
| Item | Quantity | R1Glenn O Hawbaker INC | R2Ohio-west Virginia Excavating CO | R3Stanley Miller Construction Company | R4Eclipse CO LLC | % of bid |
|---|---|---|---|---|---|---|
| 611E26000 72" CONDUIT, TYPE A, 706.02, 707.35 OR | 82 FT | $2,300 | $706 | $958 | $650 | 31% |
| 611E23600 60" CONDUIT, TYPE A, 707.03(0.168) GALVANIZED W/CO | 114 FT | $630 | $916 | $1,087 | $925 | 12% |
| 602E20000 CONCRETE MASONRY | 33.7 CY | $1,340 | $1,195 | $875 | $1,900 | 8% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 94 CY | $440 | $266 | $316 | $436 |
| Item | Quantity | R1Glenn O Hawbaker INC | R2Ohio-west Virginia Excavating CO | R3Stanley Miller Construction Company | R4Eclipse CO LLC |
|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $5,400 | $16,222 | $32,833 | $48,000 |
| 202E23000 PAVEMENT REMOVED, ASPHALT | 585 SY | $13.60 | $9.50 | $11.00 | $10.75 |
| 202E35200 PIPE REMOVED, OVER 24" | 289 FT | $21.00 | $14.00 | $20.00 | $31.50 |
| 202E38000 GUARDRAIL REMOVED | 494 FT | $6.00 | $6.25 | $3.00 | $2.00 |
| 202E70130 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 7% |
| 203E20000 EMBANKMENT | 671 CY | $39.00 | $40.00 | $39.00 | $11.25 | 4% |
| 611E20700 48" CONDUIT, TYPE A 706.02, 707.33, 707.35 OR 54" | 112 FT | $200 | $467 | $625 | $300 | 4% |
| 611E97200 CONDUIT, MISC.:, INTERNAL JOINT SEAL | 3 EACH | $7,000 | $700 | $8,150 | $13,500 | 3% |
| 203E10000 EXCAVATION | 210 CY | $97.00 | $26.50 | $42.65 | $36.25 | 3% |
| 837E21000 BACKFILL FOR LINER PIPE | 25 FT | $740 | $334 | $507 | $175 | 3% |
| 837E10000 LINER PIPE, 42", 707.11, 707.18, 707.33, 707.35, 7 | 121 FT | $150 | $157 | $222 | $145 | 3% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (27 CY | $550 | $529 | $727 | $473 | 2% |
| 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P | 1 LS | $14,500 | $12,250 | $41,511 | $42,000 | 2% |
| 202E20010 HEADWALL REMOVED | 7 EACH | $2,000 | $1,015 | $760 | $1,325 | 2% |
| 624E10000 MOBILIZATION | 1 LS | $14,000 | $29,000 | $90,000 | $109,391 | 2% |
| 614E12420 DETOUR SIGNING | 1 LS | $13,500 | $12,875 | $13,945 | $35,000 | 2% |
| 601E32000 ROCK CHANNEL PROTECTION, TYPE A WITH FILTER | 91 CY | $140 | $119 | $99.00 | $87.50 | 2% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 21 CY | $550 | $526 | $899 | $504 | 2% |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 619 FT | $18.00 | $26.50 | $26.70 | $25.25 | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $10,700 | $13,000 | $16,645 | $48,000 | 2% |
| 304E20000 AGGREGATE BASE | 105 CY | $95.00 | $95.50 | $180 | $87.00 | 2% |
| 231 FT |
| $21.00 |
| $39.75 |
| $63.00 |
| $62.75 |
| 202E98200 REMOVAL MISC.:STONE WALL REMOVED | 31 FT | $32.00 | $53.25 | $60.00 | $58.25 |
| 202E98500 REMOVAL MISC.: LOW STRENGTH CONCRETE | 88 CY | $55.00 | $51.00 | $28.00 | $39.50 |
| 204E10000 SUBGRADE COMPACTION | 622 SY | $3.00 | $1.00 | $1.00 | $3.25 |
| 204E30020 GRANULAR MATERIAL, TYPE C | 5 CY | $142 | $198 | $100 | $105 |
| 606E15050 GUARDRAIL, TYPE MGS | 425 FT | $18.00 | $23.25 | $23.50 | $22.00 |
| 606E25550 ANCHOR ASSEMBLY, MGS TYPE A | 2 EACH | $2,100 | $1,660 | $1,667 | $1,575 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, (NCHRP 350 OR 2016) | 2 EACH | $3,200 | $1,770 | $1,778 | $1,680 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 6 EACH | $1,100 | $1,770 | $1,778 | $1,680 |
| 607E30000 FENCE, SNOW | 340 FT | $4.00 | $8.15 | $5.00 | $9.25 |
| 623E40500 REFERENCE MONUMENT | 8 EACH | $350 | $400 | $356 | $1,200 |
| 653E10000 TOPSOIL FURNISHED AND PLACED | 132 CY | $67.00 | $98.50 | $30.00 | $81.50 |
| 601E11000 RIPRAP, TYPE D | 61 SY | $72.00 | $349 | $353 | $333 |
| 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER | 14 CY | $130 | $119 | $99.00 | $93.25 |
| 659E00510 SEEDING AND MULCHING, CLASS 2 | 2,532 SY | $2.50 | $4.75 | $3.00 | $4.50 |
| 659E20000 COMMERCIAL FERTILIZER | 0.34 TON | $750 | $800 | $500 | $735 |
| 659E31000 LIME | 0.52 ACRE | $400 | $100 | $125 | $84.00 |
| 659E35000 WATER | 15 MGAL | $7.00 | $1.25 | $1.00 | $1.00 |
| 832E30000 EROSION CONTROL | 6,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $1,400 | $22,750 | $10,000 | $110,000 |
| 511E47010 CLASS QC1 CONCRETE, CULVERT | 1 CY | $1,300 | $755 | $550 | $2,194 |
| 611E26000 72" CONDUIT, TYPE A, 706.02 | 8 FT | $700 | $1,475 | $1,042 | $1,075 |
| 611E96550 FIELD PAVING OF EXISTING PIPE, CORRUGATED METAL ST | 112 FT | $55.00 | $223 | $140 | $165 |
| 407E10000 TACK COAT | 63 GAL | $38.00 | $3.25 | $4.50 | $2.00 |
| 617E10100 COMPACTED AGGREGATE | 8 CY | $120 | $128 | $200 | $208 |
| 621E00100 RPM | 3 EACH | $2,700 | $2,765 | $100 | $1,559 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 3 EACH | $550 | $87.50 | $25.00 | $17.75 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, (BI-DIRECTIONAL) | 29 EACH | $8.00 | $13.25 | $10.00 | $10.50 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.07 MILE | $18,000 | $38,481 | $18,617 | $2,363 |
| 642E00300 CENTER LINE, TYPE 1 | 0.03 MILE | $24,000 | $88,944 | $24,823 | $3,938 |
| 614E18600 PORTABLE CHANGEABLE MESSAGE SIGN | 12 SNMT | $825 | $1,825 | $850 | $1,076 |
| 616E10000 WATER | 5 MGAL | $145 | $55.00 | $1.00 | $43.75 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $550 | $9,125 | $11,111 | $18,500 |
| 614E15000 SPECIAL - CALENDAR DAYS OF CONTRACT TIME FOR OPENI | 2,000 DLR | $1.00 | $21.00 | $18.00 | $21.00 |
| 614E15000 SPECIAL - CALENDAR DAYS OF CONTRACT TIME FOR OPENI | 500 DLR | $1.00 | $21.00 | $18.00 | $21.00 |
| 614E15000 SPECIAL - CALENDAR DAYS OF CONTRACT TIME FOR OPENI | 3,000 DLR | $1.00 | $21.00 | $18.00 | $21.00 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 611E26000 72" CONDUIT, TYPE A, 706.02, 707.35 OR | 82 FT | $2,300 | $189k | 26% |
| 611E23600 60" CONDUIT, TYPE A, 707.03(0.168) GALVANIZED W/CO | 114 FT | $630 | $72k | 10% |
| 602E20000 CONCRETE MASONRY | 33.7 CY | $1,340 | $45k | 6% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 94 CY | $440 | $41k | 6% |
| 203E20000 EMBANKMENT | 671 CY | $39 | $26k | 4% |
| 611E20700 48" CONDUIT, TYPE A 706.02, 707.33, 707.35 OR 54" | 112 FT | $200 | $22k | 3% |
| 611E97200 CONDUIT, MISC.:, INTERNAL JOINT SEAL | 3 EACH | $7,000 | $21k | 3% |
| 203E10000 EXCAVATION | 210 CY | $97 | $20k | 3% |
| 837E21000 BACKFILL FOR LINER PIPE | 25 FT | $740 | $19k | 3% |
| 837E10000 LINER PIPE, 42", 707.11, 707.18, 707.33, 707.35, 7 | 121 FT | $150 | $18k | 2% |