HAM-IR 75-16.97
HAM County · est $1.7M
Bid dateThursday, October 14—
HAM County · est $1.7M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 9.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 52 more items below.
| Item | Quantity | R1Complete General Construction Company | R2Great Lakes Construction CO | R3Eagle Bridge CO | R4Sunesis Construction CO | % of bid |
|---|---|---|---|---|---|---|
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 21,803 SF | $10.00 | $9.00 | $9.00 | $9.00 | 13% |
| 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN | 2,435 SF | $87.00 | $55.00 | $70.00 | $181 | 13% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $180,000 | $160,000 | $250,000 | $495,543 | 11% |
| 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION | 1,794 SY | $70.00 | $70.00 |
| Item | Quantity | R1Complete General Construction Company | R2Great Lakes Construction CO | R3Eagle Bridge CO | R4Sunesis Construction CO |
|---|---|---|---|---|---|
| 202E23000 PAVEMENT REMOVED | 118 SY | $19.00 | $50.00 | $45.00 | $36.20 |
| 204E10000 SUBGRADE COMPACTION | 124 SY | $3.50 | $8.00 | $10.00 | $16.36 |
| 659E00300 TOPSOIL | 856 CY | $25.00 | $37.00 | $20.00 | $85.48 |
| 659E10000 SEEDING AND MULCHING | 7,713 SY | $1.00 | $1.00 | $1.25 | $2.59 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $60.00 |
| $51.07 |
| 8% |
| 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME | 21,803 SF | $5.50 | $2.00 | $2.00 | $2.00 | 7% |
| 442E20000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 385 CY | $305 | $255 | $255 | $255 | 7% |
| 848E10201 SUPERPLASTICIZED DENSE CONCRETE OVERLAY USING HYDR | 1,794 SY | $58.00 | $80.00 | $80.00 | $65.45 | 6% |
| 516E11211 STRUCTURAL EXPANSION JOINT INCLUDING ELASTOMERIC S | 94 FT | $700 | $650 | $750 | $936 | 4% |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 21,803 SF | $3.00 | $1.85 | $1.85 | $1.85 | 4% |
| 614E12420 DETOUR SIGNING | 1 LS | $60,480 | $4,725 | $7,500 | $36,190 | 4% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 750 HOUR | $80.00 | $55.00 | $90.72 | $60.00 | 4% |
| 511E53012 CLASS QC2 CONCRETE, MISC.:PORTIONS OF DECK REPLACE | 24 CY | $2,500 | $3,000 | $3,250 | $5,162 | 4% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $40,000 | $40,000 | $35,000 | $21,203 | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $40,000 | $293,000 | $125,000 | $99,910 | 2% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $100,000 | $100,000 | $66,634 | 2% |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 1,609 SY | $21.50 | $21.50 | $19.00 | $21.50 | 2% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.5" | 9,228 SY | $3.35 | $2.25 | $2.25 | $2.53 | 2% |
| 302E46000 ASPHALT CONCRETE BASE, PG64-22 | 36 CY | $620 | $420 | $420 | $475 | 1% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 1,709 FT | $13.00 | $16.00 | $18.00 | $18.07 | 1% |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 21,803 SF | $1.00 | $1.85 | $1.85 | $1.85 | 1% |
| 386 SY |
| $1.00 |
| $1.00 |
| $1.50 |
| $1.30 |
| 659E15000 INTER-SEEDING | 386 SY | $0.50 | $0.50 | $1.50 | $0.80 |
| 659E20000 COMMERCIAL FERTILIZER | 1.08 TON | $600 | $600 | $1,500 | $700 |
| 659E31000 LIME | 1.59 ACRE | $35.00 | $35.00 | $10.00 | $70.00 |
| 659E35000 WATER | 43 MGAL | $1.00 | $1.00 | $10.00 | $1.00 |
| 832E30000 EROSION CONTROL | 10,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 |
| 304E20000 AGGREGATE BASE | 33 CY | $96.00 | $140 | $120 | $217 |
| 407E20000 NON-TRACKING TACK COAT | 791 GAL | $10.00 | $1.00 | $1.00 | $1.00 |
| 442E20250 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE | 7 CY | $785 | $600 | $600 | $600 |
| 872E10000 VOID REDUCING ASPHALT MEMBRANE (VRAM) | 6,042 FT | $2.20 | $2.00 | $2.00 | $2.00 |
| 621E00100 RPM | 96 EACH | $48.00 | $47.80 | $47.80 | $51.63 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 11 EACH | $18.00 | $40.00 | $15.00 | $1.00 |
| 642E30030 REMOVAL OF PAVEMENT MARKING | 1.4 MILE | $1,625 | $1,625 | $1,625 | $1,625 |
| 644E00104 EDGE LINE, 6" | 0.8 MILE | $6,835 | $6,835 | $6,835 | $6,835 |
| 644E00204 LANE LINE, 6" | 0.35 MILE | $4,260 | $4,260 | $4,260 | $4,260 |
| 645E00112 EDGE LINE, 6", TYPE A1 | 0.16 MILE | $52,645 | $52,645 | $52,645 | $52,645 |
| 645E00212 LANE LINE, 6", TYPE A1 | 0.08 MILE | $39,740 | $39,740 | $39,740 | $39,740 |
| 614E11630 INCREASED BARRIER DELINEATION | 1,217 FT | $2.85 | $2.08 | $1.50 | $2.85 |
| 614E12380 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,100 | $1,950 | $2,100 | $2,100 |
| 614E13310 BARRIER REFLECTOR, TYPE 1, ONE-WAY | 25 EACH | $15.00 | $7.35 | $10.00 | $15.00 |
| 614E13312 BARRIER REFLECTOR, TYPE 2, ONE-WAY | 43 EACH | $17.00 | $8.95 | $10.00 | $17.00 |
| 614E13350 OBJECT MARKER, ONE WAY | 68 EACH | $16.00 | $15.15 | $15.00 | $16.00 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 5 SNMT | $1,050 | $725 | $1,250 | $1,050 |
| 614E22010 WORK ZONE EDGE LINE, CLASS I, 6" | 1.82 MILE | $1,325 | $1,325 | $1,325 | $1,325 |
| 614E24202 WORK ZONE DOTTED LINE, CLASS I, 6", 642 PAINT | 1,770 FT | $0.65 | $0.65 | $0.65 | $0.65 |
| 622E41110 PORTABLE BARRIER, ANCHORED | 280 FT | $15.00 | $30.00 | $25.00 | $21.35 |
| 202E23501 WEARING COURSE REMOVED, AS PER PLAN | 1,660 SY | $1.50 | $1.00 | $6.00 | $7.96 |
| 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR | 848 LB | $2.40 | $8.00 | $2.50 | $3.86 |
| 509E25000 UNCOATED REINFORCING STEEL | 801 LB | $2.30 | $8.00 | $3.00 | $3.97 |
| 510E10001 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, AS | 116 EACH | $19.00 | $30.00 | $8.00 | $17.18 |
| 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE | 273 SY | $23.50 | $23.50 | $10.00 | $23.50 |
| 513E21500 REPLACEMENT OF DETERIORATED END CROSSFRAMES | 1,476 LB | $7.50 | $7.00 | $16.00 | $8.25 |
| 514E00504 GRINDING FINS, TEARS, SLIVERS ON EXISTING STRUCTUR | 38 MNHR | $205 | $105 | $105 | $105 |
| 514E10000 FINAL INSPECTION REPAIR | 17 EACH | $205 | $150 | $150 | $150 |
| 518E43300 6" PIPE DOWNSPOUT, INCLUDING SPECIALS | 89 FT | $200 | $505 | $675 | $695 |
| 530E00400 SPECIAL - STRUCTURESMISC: CLEANING OF DRAINAGE SYS | 3 EACH | $770 | $500 | $4,250 | $3,861 |
| 530E00400 SPECIAL - STRUCTURESMISC: CLEANING OF SCUPPERS | 4 EACH | $370 | $150 | $325 | $308 |
| 690E98400 SPECIAL - CONSULTANT FOR CONCRETE QUALITY CONTROL | 1 LS | $6,000 | $8,000 | $15,000 | $3,200 |
| 690E98400 SPECIAL - MISC.: WORK INVOLVING ASBESTOS CONTAININ | 1 LS | $800 | $150 | $500 | $1,500 |
| 848E30200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY (VARIABLE | 97 CY | $169 | $200 | $250 | $325 |
| 848E50000 HAND CHIPPING | 56 SY | $80.00 | $150 | $100 | $341 |
| 848E50100 TEST SLAB | 1 LS | $1,000 | $2,000 | $1,500 | $6,382 |
| 848E50300 WEARING COURSE REMOVED, ASPHALT | 134 SY | $14.00 | $8.00 | $12.00 | $12.68 |
| 848E50320 EXISTING CONCRETE OVERLAY REMOVED2.5" THICKNESS | 1,660 SY | $12.00 | $8.00 | $12.00 | $14.36 |
| 848E50340 REMOVAL OF DEBONDED OR DETERIORATED EXISTING VARIA | 554 SY | $33.00 | $5.00 | $40.00 | $155 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $16,000 | $30,000 | $30,000 | $14,398 |
| 619E16010 FIELD OFFICE, TYPE B | 5 MNTH | $2,000 | $2,500 | $2,250 | $2,300 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $19,000 | $5,000 | $6,500 | $9,500 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 21,803 SF | $10 | $218k | 11% |
| 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN | 2,435 SF | $87 | $212k | 11% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $180,000 | $180k | 9% |
| 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION | 1,794 SY | $70 | $126k | 6% |
| 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME | 21,803 SF | $5.5 | $120k | 6% |
| 442E20000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 385 CY | $305 | $117k | 6% |
| 848E10201 SUPERPLASTICIZED DENSE CONCRETE OVERLAY USING HYDR | 1,794 SY | $58 | $104k | 5% |
| 516E11211 STRUCTURAL EXPANSION JOINT INCLUDING ELASTOMERIC S | 94 FT | $700 | $66k | 3% |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 21,803 SF | $3 | $65k | 3% |
| 614E12420 DETOUR SIGNING | 1 LS | $60,480 | $60k | 3% |