WAS-Marietta Pedestrian Improve
WAS County · est $0.1M
Bid dateThursday, October 14—
WAS County · est $0.1M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 16 more items below.
| Item | Quantity | R1Perram Electric INC | R2Complete General Construction Company | R3J & J Bridge Company INC | R4Wolf Creek Contracting Company LLC | % of bid |
|---|---|---|---|---|---|---|
| 630E97700 SIGNING, MISC.:SOLAR POWERED RECTANGULAR RAPID FLA | 2 EACH | $11,200 | $7,550 | $250 | $5,357 | 18% |
| 644E00601 CROSSWALK LINE, AS PER PLAN | 3,060 FT | $4.40 | $4.30 | $3.00 | $5.07 | 11% |
| 608E52000 CURB RAMP | 530 SF | $25.00 | $31.00 | $100 | $30.16 | 11% |
| 630E80100 SIGN, FLAT SHEET | 206 SF | $43.65 | $32.00 | $10.00 | $37.76 | 7% |
| 608E10000 4" CONCRETE WALK | 251 SF | $27.00 | $28.00 | $85.00 | $14.88 | 5% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 2.9 CY | $2,100 | $450 | $1,000 | $609 |
| Item | Quantity | R1Perram Electric INC | R2Complete General Construction Company | R3J & J Bridge Company INC | R4Wolf Creek Contracting Company LLC |
|---|---|---|---|---|---|
| 202E23000 PAVEMENT REMOVED | 5 SY | $95.00 | $80.00 | $150 | $64.34 |
| 659E10000 SEEDING AND MULCHING | 9 SY | $26.00 | $10.00 | $30.00 | $8.09 |
| 407E10000 TACK COAT | 1.2 GAL | $95.00 | $4.00 | $20.00 | $8.19 |
| 609E28000 CURB, TYPE 7 | 7 FT | $160 | $92.00 | $100 | $73.51 |
| 625E32000 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $5,500 | $24,000 | $10,000 | $9,293 | 4% |
| 642E00601 CROSSWALK LINE, TYPE 1, AS PER PLAN | 1,488 FT | $3.65 | $4.50 | $3.00 | $5.07 | 4% |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 132 FT | $36.60 | $15.00 | $10.00 | $17.70 | 4% |
| 644E20800 YIELD LINE | 161 FT | $29.00 | $3.00 | $15.00 | $3.54 | 4% |
| 202E30000 WALK REMOVED | 686 SF | $6.00 | $5.00 | $8.00 | $10.63 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $4,000 | $4,000 | $10,000 | $65,410 | 3% |
| 630E85101 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION, AS | 4 EACH | $970 | $95.00 | $25.00 | $112 | 3% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $3,603 | $4,000 | $15,000 | $1,270 | 3% |
| 630E75000 SIGN ATTACHMENT ASSEMBLY | 8 EACH | $445 | $488 | $350 | $576 | 3% |
| 642E30000 REMOVAL OF PAVEMENT MARKING | 178 FT | $18.50 | $13.00 | $10.00 | $15.34 | 3% |
| 632E90400 SIGNALIZATION, MISC.:VACUUM EXCAVATION OF PEDESTAL | 2 EACH | $1,375 | $2,000 | $500 | $236 | 2% |
| 609E26000 CURB, TYPE 6 | 24 FT | $100 | $68.00 | $100 | $51.72 | 2% |
| 202E32000 CURB REMOVED | 44 FT | $50.00 | $14.00 | $25.00 | $12.60 | 2% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 0.4 CY | $5,500 | $450 | $1,500 | $957 | 2% |
| 2 EACH |
| $565 |
| $260 |
| $400 |
| $354 |
| 630E08600 SIGN POST REFLECTOR | 13 EACH | $130 | $50.00 | $5.00 | $59.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 6 EACH | $115 | $25.00 | $10.00 | $29.50 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 3 EACH | $115 | $35.00 | $15.00 | $41.30 |
| 632E64020 PEDESTAL FOUNDATION | 2 EACH | $200 | $2,000 | $1,000 | $1,475 |
| 632E90400 SIGNALIZATION, MISC.:REPROGRAM INTERSECTION TO BE | 2 EACH | $685 | $300 | $500 | $1,062 |
| 644E00300 CENTER LINE | 0.3 MILE | $6,350 | $13,000 | $5,000 | $15,340 |
| 644E00500 STOP LINE | 86 FT | $7.00 | $5.00 | $9.00 | $5.90 |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 262 FT | $7.00 | $4.75 | $7.00 | $5.60 |
| 644E00900 ISLAND MARKING | 120 SF | $4.25 | $3.00 | $5.00 | $3.54 |
| 644E01000 RAILROAD SYMBOL MARKING | 1 EACH | $650 | $600 | $750 | $708 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $1,200 | $10,000 | $1,000 | $4,130 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 630E97700 SIGNING, MISC.:SOLAR POWERED RECTANGULAR RAPID FLA | 2 EACH | $11,200 | $22k | 16% |
| 644E00601 CROSSWALK LINE, AS PER PLAN | 3,060 FT | $4.4 | $13k | 10% |
| 608E52000 CURB RAMP | 530 SF | $25 | $13k | 10% |
| 630E80100 SIGN, FLAT SHEET | 206 SF | $43.65 | $9k | 7% |
| 608E10000 4" CONCRETE WALK | 251 SF | $27 | $7k | 5% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 2.9 CY | $2,100 | $6k | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $5,500 | $6k | 4% |
| 642E00601 CROSSWALK LINE, TYPE 1, AS PER PLAN | 1,488 FT | $3.65 | $5k | 4% |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 132 FT | $36.6 | $5k | 4% |
| 644E20800 YIELD LINE | 161 FT | $29 | $5k | 3% |