CLA-SR 72-08.63
CLA County · est $1.1M
Bid dateThursday, October 28—
CLA County · est $1.1M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 8.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 24 more items below.
| Item | Quantity | R1Double Z Construction Company | R2Catts Construction INC | R3Eagle Bridge CO | R4Sunesis Construction CO | R5Great Lakes Construction CO | R6Shelly & Sands INC | R7Complete General Construction Company | R8Suburban Maintenance & Construction | R9Bcc Ohio INC | R10Dot Construction CORP | % of bid |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 848E20001 SURFACE PREPARATION USING HYDRODEMOLITION, AS PER | 3,953 SY | $50.00 | $54.39 | $42.00 | $27.18 | $45.00 | $50.00 | $64.00 | $55.00 | $42.36 | $60.00 | 23% |
| Item | Quantity | R1Double Z Construction Company | R2Catts Construction INC | R3Eagle Bridge CO | R4Sunesis Construction CO | R5Great Lakes Construction CO | R6Shelly & Sands INC | R7Complete General Construction Company | R8Suburban Maintenance & Construction | R9Bcc Ohio INC | R10Dot Construction CORP |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 202E23500 WEARING COURSE REMOVED | 834 SY | $6.00 | $5.95 | $10.00 | $17.26 | $5.50 | $8.00 | $4.00 | $12.00 | $7.88 | $15.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 848E10200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY USING HYDR | 3,976 SY | $49.00 | $44.25 | $49.00 | $62.06 | $60.00 | $43.00 | $55.00 | $74.00 | $57.18 | $60.00 | 23% |
| 516E11210 STRUCTURAL EXPANSION JOINT INCLUDING ELASTOMERIC S | 112 FT | $715 | $885 | $800 | $926 | $705 | $700 | $740 | $700 | $905 | $1,000 | 9% |
| 848E30200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY (VARIABLE | 298 CY | $200 | $116 | $210 | $275 | $180 | $200 | $160 | $275 | $443 | $300 | 7% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $48,000 | $16,202 | $90,000 | $41,096 | $84,900 | $81,000 | $49,000 | $41,000 | $46,725 | $50,000 | 6% |
| 848E50320 EXISTING CONCRETE OVERLAY REMOVED, 1 3/4" | 3,953 SY | $8.00 | $10.50 | $5.00 | $9.33 | $6.50 | $10.00 | $8.00 | $5.00 | $6.15 | $10.00 | 4% |
| 518E43301 6" PIPE DOWNSPOUT, INCLUDING SPECIALS, AS PER PLAN | 474 FT | $60.00 | $103 | $150 | $103 | $110 | $159 | $110 | $115 | $137 | $200 | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $28,000 | $26,522 | $21,000 | $15,772 | $14,000 | $44,500 | $13,000 | $30,000 | $35,208 | $100,000 | 3% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 2,200 FT | $12.00 | $22.00 | $15.00 | $12.10 | $16.50 | $12.00 | $16.00 | $18.50 | $23.56 | $20.00 | 3% |
| 848E50000 HAND CHIPPING | 476 SY | $55.00 | $69.00 | $50.00 | $37.41 | $23.00 | $45.00 | $65.00 | $45.00 | $98.48 | $100 | 3% |
| 511E34410 CLASS QC2 CONCRETE, SUPERSTRUCTURE | 15 CY | $1,500 | $871 | $3,000 | $1,781 | $2,000 | $2,400 | $2,475 | $1,800 | $2,185 | $1,500 | 3% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 35 CY | $600 | $708 | $376 | $1,639 | $600 | $1,700 | $1,626 | $600 | $630 | $1,625 | 2% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $73,400 | $20,000 | $31,227 | $40,000 | $20,000 | $40,000 | $40,000 | $38,667 | $40,000 | 2% |
| 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN | 143 SF | $89.00 | $129 | $105 | $89.74 | $89.00 | $94.00 | $89.00 | $150 | $89.63 | $100 | 2% |
| 614E12380 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,500 | $2,475 | $2,140 | $2,118 | $1,925 | $2,110 | $2,100 | $2,100 | $1,887 | $2,140 | 1% |
| 619E16010 FIELD OFFICE, TYPE B | 6 MNTH | $1,500 | $2,000 | $2,000 | $1,997 | $2,150 | $3,000 | $2,700 | $1,800 | $2,790 | $1,000 | 1% |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 340 SY | $25.50 | $29.50 | $23.50 | $25.71 | $25.50 | $25.00 | $25.50 | $22.00 | $26.72 | $22.50 | 1% |
| 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE | 332 SY | $24.00 | $29.50 | $22.00 | $24.20 | $24.00 | $25.00 | $24.00 | $20.00 | $16.95 | $21.50 | 1% |
| 848E50340 REMOVAL OF DEBONDED OR DETERIORATED EXISTING VARIA | 238 SY | $30.00 | $2.00 | $50.00 | $96.62 | $45.00 | $45.00 | $40.00 | $45.00 | $29.25 | $100 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $6,000 | $9,854 | $10,000 | $0.01 | $10,000 | $8,000 | $9,000 | $15,000 | $14,029 | $14,000 | 1% |
| 607E50901 GATE, TYPE CL, AS PER PLAN |
| 1 EACH |
| $5,200 |
| $1,000 |
| $5,200 |
| $5,243 |
| $5,200 |
| $5,500 |
| $5,200 |
| $5,200 |
| $5,460 |
| $5,875 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 407E10000 TACK COAT | 67 GAL | $1.00 | $1.20 | $4.00 | $2.77 | $1.00 | $3.00 | $2.75 | $1.00 | $1.05 | $2.75 |
| 644E00200 LANE LINE, 4" | 0.28 MILE | $6,000 | $4,420 | $6,000 | $2,856 | $6,000 | $3,200 | $6,000 | $6,000 | $3,938 | $3,750 |
| 644E00300 CENTER LINE | 0.23 MILE | $13,865 | $17,861 | $13,865 | $9,983 | $13,865 | $11,400 | $13,865 | $13,865 | $15,750 | $15,000 |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 225 FT | $5.00 | $7.00 | $5.00 | $10.79 | $5.00 | $12.00 | $5.00 | $5.00 | $6.30 | $6.00 |
| 644E30030 REMOVAL OF PAVEMENT MARKING | 0.55 MILE | $10,405 | $10,609 | $13,500 | $18,434 | $9,560 | $8,871 | $10,405 | $10,405 | $10,159 | $10,000 |
| 646E10100 LANE LINE, 4" | 0.3 MILE | $7,840 | $15,324 | $7,840 | $8,939 | $7,840 | $10,230 | $7,840 | $7,840 | $13,650 | $13,000 |
| 646E10200 CENTER LINE | 0.14 MILE | $21,930 | $30,648 | $21,930 | $31,435 | $21,930 | $36,000 | $21,930 | $21,930 | $27,300 | $26,000 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 75 HOUR | $65.00 | $40.00 | $75.00 | $75.63 | $58.00 | $72.00 | $85.00 | $75.00 | $73.50 | $100 |
| 614E13310 BARRIER REFLECTOR, TYPE 1, BIDIRECTIONAL | 45 EACH | $10.00 | $9.40 | $9.00 | $8.57 | $5.65 | $7.00 | $17.00 | $17.00 | $8.40 | $8.00 |
| 614E13360 OBJECT MARKER, TWO WAY | 45 EACH | $14.00 | $18.86 | $11.00 | $12.67 | $14.60 | $12.00 | $21.00 | $21.00 | $16.80 | $16.00 |
| 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT | 0.58 MILE | $2,990 | $5,893 | $2,990 | $4,329 | $2,990 | $4,500 | $2,990 | $2,990 | $5,250 | $5,000 |
| 614E22100 WORK ZONE EDGE LINE, CLASS I, 4", 642 PAINT | 0.53 MILE | $2,620 | $2,946 | $2,620 | $2,889 | $2,620 | $3,000 | $2,620 | $2,620 | $2,625 | $2,500 |
| 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR | 50 LB | $2.00 | $9.00 | $1.25 | $6.58 | $6.75 | $1.00 | $4.00 | $5.00 | $7.70 | $10.00 |
| 509E25000 UNCOATED REINFORCING STEEL | 1,639 LB | $1.50 | $5.00 | $2.25 | $2.66 | $4.75 | $2.00 | $2.00 | $1.20 | $0.99 | $5.00 |
| 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT | 74 EACH | $14.50 | $39.25 | $20.00 | $14.02 | $23.00 | $30.00 | $17.00 | $32.00 | $25.23 | $80.00 |
| 516E31011 2" DEEP JOINT SEALER, AS PER PLAN | 200 FT | $14.00 | $15.15 | $18.25 | $18.40 | $18.00 | $19.00 | $18.25 | $26.00 | $11.49 | $20.00 |
| 518E12800 SCUPPER, MODIFICATION | 36 EACH | $80.00 | $29.50 | $100 | $81.05 | $75.00 | $500 | $225 | $200 | $236 | $500 |
| 848E50100 TEST SLAB | 1 LS | $700 | $2,974 | $1,500 | $2,208 | $2,000 | $2,000 | $2,000 | $1,000 | $1,028 | $2,000 |
| 848E50200 FULL-DEPTH REPAIR | 1 CY | $1,500 | $1,367 | $1,250 | $4,664 | $3,200 | $2,500 | $1,500 | $1,500 | $3,585 | $2,000 |
| 100E00300 PREMIUM ON RAILROADS' PROTECTIVE PUBLIC LIABILITY | 1 LS | $3,000 | $5,895 | $5,500 | $7,434 | $4,000 | $6,500 | $2,500 | $8,500 | $5,000 | $15,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $1,000 | $700 | $2,500 | $2,218 | $4,000 | $2,500 | $2,000 | $7,500 | $3,915 | $10,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 848E20001 SURFACE PREPARATION USING HYDRODEMOLITION, AS PER | 3,953 SY | $50 | $198k | 22% |
| 848E10200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY USING HYDR | 3,976 SY | $49 | $195k | 22% |
| 516E11210 STRUCTURAL EXPANSION JOINT INCLUDING ELASTOMERIC S | 112 FT | $715 | $80k | 9% |
| 848E30200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY (VARIABLE | 298 CY | $200 | $60k | 7% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $48,000 | $48k | 5% |
| 848E50320 EXISTING CONCRETE OVERLAY REMOVED, 1 3/4" | 3,953 SY | $8 | $32k | 4% |
| 518E43301 6" PIPE DOWNSPOUT, INCLUDING SPECIALS, AS PER PLAN | 474 FT | $60 | $28k | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $28,000 | $28k | 3% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 2,200 FT | $12 | $26k | 3% |
| 848E50000 HAND CHIPPING | 476 SY | $55 | $26k | 3% |