STA-US 62T/SR 225-01.37/00.59 (PART 1, 2, 3)
STA County · est $8.6M
Bid dateThursday, October 28—
STA County · est $8.6M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 10.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 320 more items below.
| Item | Quantity | R1Marucci & Gaffney Excavating CO | R2Great Lakes Construction CO | R3Shelly & Sands INC | R4Beaver Excavating Company | R5Ruhlin Company | R6J D Williamson Construction CO INC | % of bid |
|---|---|---|---|---|---|---|---|---|
| 442E10001 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 2,808 CY | $172 | $172 | $188 | $172 | $172 | $180 | 11% |
| 203E20000 EMBANKMENT | 34,490 CY | $13.90 | $9.00 | $17.00 | $15.00 | $18.00 | $21.50 | 11% |
| 442E10100 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE | 2,808 CY | $140 |
| Item | Quantity | R1Marucci & Gaffney Excavating CO | R2Great Lakes Construction CO | R3Shelly & Sands INC | R4Beaver Excavating Company | R5Ruhlin Company | R6J D Williamson Construction CO INC |
|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $80,000 | $65,000 | $20,000 | $90,000 | $50,000 | $75,000 |
| 202E23000 PAVEMENT REMOVED | 7,374 SY | $9.00 | $7.40 | $5.00 | $6.00 | $10.00 | $12.75 |
| 202E30600 CONCRETE MEDIAN REMOVED | 284 SY | $12.00 | $10.50 | $6.00 | $12.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $138 |
| $142 |
| $138 |
| $138 |
| $145 |
| 9% |
| 524E94501 DRILLED SHAFTS, 24" DIAMETER, AS PER PLAN | 2,100 FT | $170 | $100 | $58.00 | $65.00 | $62.00 | $115 | 8% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $350,000 | $350,000 | $292,000 | $740,000 | $590,000 | $625,000 | 8% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 2,503 CY | $118 | $119 | $125 | $118 | $118 | $124 | 7% |
| 615E20000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A | 5,324 SY | $53.00 | $60.00 | $72.00 | $56.00 | $70.00 | $58.00 | 6% |
| 615E10001 ROADS FOR MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $209,000 | $130,000 | $190,000 | $320,000 | $310,000 | $125,000 | 5% |
| 624E10000 MOBILIZATION | 1 LS | $200,000 | $200,000 | $200,000 | $200,000 | $200,000 | $200,000 | 5% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (T = 3") | 67,386 SY | $2.70 | $2.70 | $3.75 | $2.70 | $2.70 | $2.75 | 4% |
| 253E01000 PAVEMENT REPAIR | 2,625 SY | $50.00 | $50.00 | $53.00 | $50.00 | $50.00 | $52.00 | 3% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (991 CY | $126 | $128 | $136 | $126 | $126 | $132 | 3% |
| 507E00400 STEEL PILES, MISC.: HP12X53 STEEL BEAM, FURNISHED | 2,065 FT | $60.00 | $50.00 | $40.00 | $53.00 | $62.00 | $56.00 | 3% |
| 304E20000 AGGREGATE BASE | 2,016 CY | $61.00 | $55.00 | $73.00 | $65.00 | $70.00 | $64.00 | 3% |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) | 2,625 SY | $45.00 | $45.00 | $48.00 | $45.00 | $45.00 | $47.00 | 3% |
| 511E34446 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK | 239 CY | $490 | $735 | $800 | $730 | $700 | $600 | 3% |
| 511E34446 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK | 238 CY | $490 | $735 | $850 | $730 | $700 | $575 | 3% |
| 513E10201 STRUCTURAL STEEL MEMBERS, LEVEL UF, AS PER PLAN | 7,230 LB | $16.00 | $10.00 | $13.00 | $8.80 | $10.00 | $13.50 | 3% |
| 513E10201 STRUCTURAL STEEL MEMBERS, LEVEL UF, AS PER PLAN | 7,230 LB | $16.00 | $10.00 | $13.00 | $8.80 | $10.00 | $13.50 | 3% |
| 832E30000 EROSION CONTROL | 105,500 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 2% |
| $25.00 |
| $18.00 |
| 202E30700 CONCRETE BARRIER REMOVED | 130 FT | $30.00 | $12.00 | $8.00 | $20.00 | $15.00 | $16.00 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 663 FT | $4.00 | $16.00 | $22.00 | $18.00 | $15.00 | $12.00 |
| 202E38000 GUARDRAIL REMOVED | 3,250 FT | $1.80 | $2.50 | $2.00 | $1.80 | $1.80 | $2.00 |
| 202E38300 GUARDRAIL REMOVED, BARRIER DESIGN | 505 FT | $2.20 | $4.00 | $2.00 | $2.20 | $2.20 | $2.35 |
| 202E42000 ANCHOR ASSEMBLY REMOVED, TYPE A | 1 EACH | $350 | $2,500 | $370 | $350 | $350 | $370 |
| 202E42010 ANCHOR ASSEMBLY REMOVED, TYPE E | 4 EACH | $135 | $500 | $143 | $135 | $135 | $140 |
| 202E47000 BRIDGE TERMINAL ASSEMBLY REMOVED | 10 EACH | $60.00 | $500 | $64.00 | $60.00 | $60.00 | $65.00 |
| 202E47800 IMPACT ATTENUATOR REMOVED | 2 EACH | $175 | $1,500 | $185 | $175 | $175 | $200 |
| 202E58000 MANHOLE REMOVED | 1 EACH | $488 | $530 | $270 | $450 | $550 | $400 |
| 202E58100 CATCH BASIN REMOVED | 4 EACH | $245 | $610 | $132 | $350 | $450 | $400 |
| 202E60010 MONUMENT ASSEMBLY REMOVED | 4 EACH | $236 | $140 | $126 | $100 | $50.00 | $175 |
| 202E75000 FENCE REMOVED | 145 FT | $2.65 | $5.00 | $3.00 | $4.00 | $2.40 | $5.00 |
| 202E98100 REMOVAL MISC.: BARRIER REFLECTOR | 40 EACH | $19.20 | $9.00 | $5.00 | $2.00 | $2.00 | $2.00 |
| 203E10000 EXCAVATION | 6,541 CY | $3.75 | $11.50 | $7.00 | $25.00 | $12.00 | $20.00 |
| 203E10000 EXCAVATION, FOR PAVEMENT REPAIR | 438 CY | $15.00 | $10.00 | $11.00 | $10.00 | $26.97 | $12.00 |
| 204E10000 SUBGRADE COMPACTION | 12,099 SY | $1.50 | $2.30 | $2.00 | $2.00 | $2.50 | $2.35 |
| 204E13000 EXCAVATION OF SUBGRADE | 1,435 CY | $8.00 | $12.00 | $16.00 | $15.00 | $18.00 | $20.00 |
| 204E30010 GRANULAR MATERIAL, TYPE B | 1,435 CY | $49.60 | $50.00 | $60.00 | $47.00 | $55.00 | $57.00 |
| 204E45000 PROOF ROLLING | 7 HOUR | $100 | $335 | $344 | $220 | $500 | $265 |
| 204E50000 GEOTEXTILE FABRIC | 2,150 SY | $1.25 | $1.30 | $1.00 | $2.00 | $1.00 | $2.50 |
| 209E60200 LINEAR GRADING | 243 STA | $65.00 | $30.36 | $64.00 | $65.00 | $75.00 | $68.00 |
| 606E15050 GUARDRAIL, TYPE MGS | 2,937.5 FT | $21.60 | $27.50 | $23.00 | $21.60 | $21.60 | $23.00 |
| 606E15051 GUARDRAIL, TYPE MGS, AS PER PLAN | 125 FT | $31.20 | $35.00 | $33.00 | $31.20 | $31.20 | $33.00 |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 850 FT | $22.80 | $32.00 | $24.00 | $22.80 | $22.80 | $24.00 |
| 606E15150 GUARDRAIL, TYPE MGS HALF POST SPACING | 112.5 FT | $27.60 | $34.00 | $29.00 | $27.60 | $27.60 | $30.00 |
| 606E15550 GUARDRAIL, BARRIER DESIGN, TYPE MGS | 200 FT | $38.40 | $45.00 | $41.00 | $38.40 | $38.40 | $40.75 |
| 606E20000 FLARED END SECTION | 2 EACH | $65.00 | $400 | $70.00 | $65.00 | $65.00 | $70.00 |
| 606E20050 ROUNDED END SECTION | 1 EACH | $70.00 | $500 | $74.00 | $70.00 | $70.00 | $75.00 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, NCHRP-350 OR MASH 201 | 5 EACH | $2,780 | $2,600 | $3,000 | $2,780 | $2,750 | $2,950 |
| 606E26151 ANCHOR ASSEMBLY, MGS TYPE E, AS PER PLAN, NCHRP-35 | 1 EACH | $3,650 | $3,200 | $3,900 | $3,650 | $3,650 | $3,875 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 3 EACH | $1,190 | $1,500 | $1,300 | $1,190 | $1,190 | $1,265 |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 5 EACH | $2,460 | $2,500 | $2,600 | $2,460 | $2,460 | $2,610 |
| 606E35003 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1, AS PER PLAN | 1 EACH | $3,240 | $3,500 | $3,400 | $3,240 | $3,240 | $3,440 |
| 606E35102 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 2 | 2 EACH | $470 | $1,500 | $500 | $470 | $470 | $500 |
| 606E60012 IMPACT ATTENUATOR, TYPE 1 (BIDIRECTIONAL) | 2 EACH | $4,900 | $5,900 | $5,100 | $4,850 | $4,850 | $5,150 |
| 607E15000 FENCE, TYPE 47 | 132 FT | $30.00 | $48.00 | $28.00 | $25.00 | $26.00 | $26.00 |
| 622E10160 CONCRETE BARRIER, SINGLE SLOPE, TYPE D | 151 FT | $95.00 | $165 | $220 | $100 | $175 | $120 |
| 622E25050 CONCRETE BARRIER, END ANCHORAGE, REINFORCED, TYPE | 2 EACH | $4,000 | $3,800 | $4,700 | $4,500 | $4,000 | $7,850 |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 20 FT | $13.50 | $80.00 | $13.00 | $50.00 | $80.00 | $35.00 |
| 623E38500 MONUMENT ASSEMBLY | 4 EACH | $1,000 | $900 | $1,400 | $1,300 | $550 | $700 |
| 690E50350 SPECIAL - MAILBOX REMOVED AND RESET | 1 EACH | $150 | $150 | $180 | $150 | $245 | $250 |
| 601E21050 TIED CONCRETE BLOCK MAT WITH TYPE 1 UNDERLAYMENT | 40 SY | $100 | $100 | $115 | $80.00 | $125 | $275 |
| 601E21060 TIED CONCRETE BLOCK MAT WITH TYPE 2 UNDERLAYMENT | 109 SY | $80.00 | $100 | $87.00 | $60.00 | $75.00 | $75.00 |
| 601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH GEOTEXTILE FA | 2.2 CY | $100 | $310 | $330 | $300 | $550 | $100 |
| 659E00100 SOIL ANALYSIS TEST | 4 EACH | $5.00 | $150 | $150 | $100 | $100 | $150 |
| 659E00300 TOPSOIL | 2,496 CY | $27.00 | $27.00 | $20.00 | $7.00 | $27.00 | $28.00 |
| 659E10000 SEEDING AND MULCHING | 26,797 SY | $0.90 | $0.73 | $1.00 | $1.00 | $1.00 | $0.80 |
| 659E14000 REPAIR SEEDING AND MULCHING | 935 SY | $0.10 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 659E15000 INTER-SEEDING | 935 SY | $0.10 | $0.10 | $1.00 | $1.00 | $1.00 | $0.25 |
| 659E20000 COMMERCIAL FERTILIZER | 3.64 TON | $400 | $900 | $830 | $850 | $850 | $950 |
| 659E31000 LIME | 5.54 ACRE | $50.00 | $50.00 | $160 | $100 | $100 | $30.00 |
| 659E35000 WATER | 148 MGAL | $0.10 | $1.00 | $1.00 | $1.00 | $1.00 | $2.00 |
| 660E20000 SODDING REINFORCED | 3,909 SY | $5.00 | $10.00 | $15.00 | $10.00 | $10.00 | $10.00 |
| 670E00500 SLOPE EROSION PROTECTION | 3,785 SY | $3.00 | $2.50 | $1.00 | $2.00 | $2.00 | $2.65 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $1,500 | $1,500 | $1,550 | $5,500 | $2,500 | $1,500 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $12,600 | $13,000 | $18,500 | $20,000 | $13,500 | $35,000 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $13,000 | $14,000 | $17,000 | $20,000 | $20,000 | $17,000 |
| 602E20000 CONCRETE MASONRY | 1.2 CY | $1,250 | $1,600 | $790 | $1,700 | $1,500 | $2,750 |
| 602E98100 MASONRY, MISC.: PLUG EXISTING INLET | 2 FT | $25.00 | $200 | $500 | $350 | $100 | $500 |
| 605E11110 6" SHALLOW PIPE UNDERDRAINS WITH GEOTEXTILE FABRIC | 2,359 FT | $12.00 | $15.20 | $14.00 | $12.00 | $23.00 | $11.50 |
| 605E13410 6" UNCLASSIFIED PIPE UNDERDRAINS WITH GEOTEXTILE F | 662 FT | $12.00 | $17.00 | $15.00 | $10.00 | $32.00 | $11.50 |
| 605E14020 6" BASE PIPE UNDERDRAINS WITH GEOTEXTILE FABRIC | 5,887 FT | $11.00 | $12.00 | $12.00 | $13.00 | $22.00 | $11.50 |
| 605E31100 AGGREGATE DRAINS | 200 FT | $15.00 | $7.00 | $18.00 | $20.00 | $51.00 | $12.00 |
| 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS | 267 FT | $15.00 | $38.00 | $19.00 | $19.00 | $26.00 | $20.00 |
| 611E00900 6" CONDUIT, TYPE B | 335 FT | $10.00 | $34.00 | $19.00 | $17.00 | $31.00 | $30.00 |
| 611E01500 6" CONDUIT, TYPE F | 217 FT | $10.00 | $40.00 | $23.00 | $14.00 | $30.00 | $20.00 |
| 611E13200 30" CONDUIT, TYPE A | 243 FT | $122 | $140 | $120 | $185 | $150 | $175 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 20 EACH | $150 | $350 | $265 | $350 | $400 | $290 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1/4" MIN. - 3" | 6,219 SY | $3.00 | $3.00 | $3.00 | $3.00 | $3.00 | $3.10 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 3" | 1,667 SY | $3.00 | $3.00 | $3.00 | $3.00 | $3.00 | $3.10 |
| 255E20000 FULL DEPTH PAVEMENT SAWING | 4,203 FT | $3.00 | $2.00 | $3.00 | $3.75 | $2.50 | $2.60 |
| 304E20000 AGGREGATE BASE, FOR PAVEMENT REPAIR | 438 CY | $59.00 | $25.00 | $27.00 | $25.00 | $25.00 | $26.00 |
| 407E13900 TACK COAT, 702.13 | 387 GAL | $2.10 | $2.10 | $3.00 | $2.10 | $2.10 | $2.20 |
| 407E20000 NON-TRACKING TACK COAT | 2,749 GAL | $2.35 | $2.35 | $3.00 | $2.35 | $2.35 | $2.50 |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 491 CY | $156 | $157 | $165 | $156 | $156 | $164 |
| 441E50701 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (175 CY | $232 | $232 | $245 | $232 | $232 | $245 |
| 451E14010 9" REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 1,164 SY | $82.00 | $82.00 | $103 | $82.00 | $85.00 | $97.00 |
| 609E24510 CURB, TYPE 4-C | 188 FT | $35.00 | $45.00 | $48.00 | $50.00 | $35.00 | $30.00 |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 15 CY | $110 | $110 | $117 | $110 | $110 | $115 |
| 625E00450 CONNECTION, FUSED PULL APART | 14 EACH | $100 | $100 | $105 | $99.90 | $99.90 | $100 |
| 625E00480 CONNECTION, UNFUSED PERMANENT | 12 EACH | $100 | $100 | $106 | $106 | $106 | $100 |
| 625E10490 LIGHT POLE, CONVENTIONAL, AT12B40 | 7 EACH | $2,400 | $2,400 | $2,540 | $2,490 | $2,490 | $2,500 |
| 625E14100 LIGHT POLE FOUNDATION, 24" X 8' DEEP | 7 EACH | $1,500 | $1,500 | $1,600 | $1,448 | $1,448 | $1,550 |
| 625E23200 NO. 4 AWG 2400 VOLT DISTRIBUTION CABLE | 546 FT | $2.75 | $2.75 | $3.00 | $3.66 | $3.66 | $2.90 |
| 625E23400 NO. 10 AWG POLE AND BRACKET CABLE | 728 FT | $1.25 | $1.25 | $1.00 | $1.38 | $1.38 | $1.30 |
| 625E24320 1-1/2" DUCT CABLE WITH THREE NO. 4 AWG 2400 VOLT C | 2,326 FT | $8.00 | $8.00 | $9.00 | $10.12 | $10.12 | $8.35 |
| 625E25902 CONDUIT, JACKED OR DRILLED, 725.04, 3" | 162 FT | $50.00 | $50.00 | $53.00 | $77.24 | $77.24 | $52.00 |
| 625E26253 LUMINAIRE, CONVENTIONAL, SOLID STATE (LED), AS PER | 7 EACH | $600 | $600 | $635 | $622 | $622 | $625 |
| 625E29000 TRENCH | 2,236 FT | $6.00 | $6.00 | $7.00 | $5.97 | $5.97 | $6.25 |
| 625E30700 PULL BOX, 725.08, 18" | 3 EACH | $950 | $950 | $1,000 | $963 | $963 | $1,000 |
| 625E30706 PULL BOX, 725.08, 24" | 1 EACH | $1,100 | $1,100 | $1,160 | $1,115 | $1,115 | $1,150 |
| 625E31510 PULL BOX REMOVED | 15 EACH | $100 | $100 | $106 | $272 | $272 | $100 |
| 625E32000 GROUND ROD | 7 EACH | $200 | $200 | $212 | $170 | $170 | $200 |
| 625E34001 POWER SERVICE, AS PER PLAN | 1 EACH | $5,000 | $5,000 | $5,300 | $4,610 | $4,610 | $5,200 |
| 625E36010 UNDERGROUND WARNING/MARKING TAPE | 2,231 FT | $0.25 | $0.20 | $0.30 | $0.25 | $0.25 | $0.20 |
| 625E40000 SPECIAL - MAINTAIN EXISTING LIGHTING | 1 LS | $2,500 | $2,500 | $2,700 | $2,014 | $2,015 | $2,600 |
| 625E40010 SPECIAL - REPLACEMENT OF EXISTING LIGHTING UNIT | 1 EACH | $500 | $500 | $530 | $3,962 | $3,962 | $500 |
| 625E75400 LIGHT POLE REMOVED | 16 EACH | $150 | $150 | $160 | $555 | $555 | $155 |
| 625E75510 POWER SERVICE REMOVED | 1 EACH | $500 | $500 | $530 | $543 | $543 | $520 |
| 621E00100 RPM | 70 EACH | $75.00 | $75.00 | $53.00 | $75.00 | $75.00 | $50.00 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 70 EACH | $19.22 | $10.05 | $5.00 | $15.00 | $10.77 | $20.00 |
| 625E32000 GROUND ROD | 1 EACH | $160 | $265 | $265 | $170 | $295 | $100 |
| 626E00102 BARRIER REFLECTOR, TYPE 1, ONE WAY | 15 EACH | $8.00 | $9.50 | $8.00 | $8.00 | $8.00 | $8.50 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, ONE WAY | 99 EACH | $8.00 | $9.50 | $8.00 | $8.00 | $8.00 | $8.50 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 119 FT | $13.30 | $7.85 | $13.00 | $13.00 | $13.00 | $14.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 177 FT | $14.52 | $8.15 | $14.00 | $14.00 | $14.00 | $15.00 |
| 630E04100 GROUND MOUNTED SUPPORT, NO. 4 POST | 33 FT | $17.39 | $10.80 | $18.00 | $17.00 | $17.00 | $18.00 |
| 630E04101 GROUND MOUNTED SUPPORT, NO. 4 POST, AS PER PLAN | 111 FT | $18.41 | $12.00 | $19.00 | $18.00 | $18.00 | $19.30 |
| 630E06500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W6X9 | 44 FT | $43.00 | $37.00 | $44.00 | $42.00 | $42.00 | $45.00 |
| 630E08600 SIGN POST REFLECTOR | 18 EACH | $50.00 | $26.50 | $51.00 | $49.00 | $49.00 | $52.00 |
| 630E09000 BREAKAWAY STRUCTURAL BEAM CONNECTION | 2 EACH | $435 | $610 | $448 | $425 | $425 | $455 |
| 630E10902 OVERHEAD SIGN SUPPORT, TYPE TC-16.21, DESIGN 9 | 1 EACH | $17,000 | $18,950 | $17,000 | $16,550 | $16,550 | $17,780 |
| 630E79500 SIGN SUPPORT ASSEMBLY, POLE MOUNTED | 1 EACH | $170 | $165 | $174 | $165 | $165 | $175 |
| 630E79610 SIGN SUPPORT ASSEMBLY, BARRIER MOUNTED | 1 EACH | $740 | $300 | $765 | $725 | $725 | $775 |
| 630E80100 SIGN, FLAT SHEET | 271 SF | $16.50 | $11.55 | $17.00 | $16.00 | $16.00 | $17.00 |
| 630E80200 SIGN, GROUND MOUNTED EXTRUSHEET | 45 SF | $25.00 | $23.25 | $25.00 | $24.00 | $24.00 | $25.75 |
| 630E84500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT FOUNDATION | 2 EACH | $844 | $1,600 | $873 | $825 | $825 | $885 |
| 630E84510 RIGID OVERHEAD SIGN SUPPORT FOUNDATION | 1 EACH | $5,575 | $5,200 | $5,700 | $5,450 | $5,450 | $5,850 |
| 630E85000 REMOVAL OF GROUND MOUNTED SIGN AND STORAGE | 39 EACH | $20.50 | $15.50 | $21.00 | $20.00 | $20.00 | $21.50 |
| 630E85500 REMOVAL OF GROUND MOUNTED MAJOR SIGN AND STORAGE | 1 EACH | $384 | $630 | $396 | $375 | $375 | $400 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 24 EACH | $15.50 | $18.45 | $15.00 | $15.00 | $15.00 | $16.10 |
| 630E86102 REMOVAL OF GROUND MOUNTED STRUCTURAL BEAM SUPPORT | 2 EACH | $292 | $440 | $301 | $285 | $285 | $305 |
| 630E87000 REMOVAL OF OVERHEAD MOUNTED SIGN AND STORAGE | 2 EACH | $330 | $450 | $338 | $320 | $320 | $345 |
| 630E88002 REMOVAL OF OVERHEAD SIGN SUPPORT AND STORAGE, TYPE | 1 EACH | $1,100 | $925 | $1,000 | $1,280 | $985 | $1,050 |
| 646E10010 EDGE LINE, 6" | 0.85 MILE | $4,300 | $4,300 | $4,500 | $4,300 | $4,300 | $4,650 |
| 646E10110 LANE LINE, 6" | 0.52 MILE | $3,000 | $3,000 | $3,200 | $3,000 | $3,000 | $3,250 |
| 646E10200 CENTER LINE | 0.29 MILE | $6,000 | $6,000 | $6,400 | $6,000 | $6,000 | $6,500 |
| 646E10300 CHANNELIZING LINE, 8" | 151 FT | $2.00 | $2.00 | $2.00 | $2.00 | $2.00 | $2.15 |
| 646E10400 STOP LINE | 27 FT | $16.00 | $16.00 | $17.00 | $16.00 | $16.00 | $17.25 |
| 646E20300 LANE ARROW | 3 EACH | $185 | $185 | $196 | $185 | $185 | $200 |
| 646E20320 WRONG WAY ARROW | 2 EACH | $200 | $200 | $211 | $200 | $200 | $215 |
| 646E20350 LANE REDUCTION ARROW | 1 EACH | $384 | $385 | $407 | $385 | $385 | $415 |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $90,000 | $175,000 | $82,000 | $75,000 | $135,000 | $195,000 |
| 202E22900 APPROACH SLAB REMOVED | 133 SY | $20.00 | $50.00 | $23.00 | $32.00 | $35.00 | $26.00 |
| 202E23500 WEARING COURSE REMOVED | 133 SY | $20.00 | $2.00 | $15.00 | $4.00 | $5.00 | $9.00 |
| 503E11101 COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN | 1 LS | $1,000 | $1,000 | $15,000 | $1.00 | $15,000 | $500 |
| 503E21100 UNCLASSIFIED EXCAVATION | 73 CY | $85.00 | $120 | $72.00 | $170 | $100 | $115 |
| 509E10001 EPOXY COATED REINFORCING STEEL, AS PER PLAN | 69,863 LB | $1.35 | $1.45 | $1.40 | $1.40 | $1.60 | $1.28 |
| 509E25000 UNCOATED REINFORCING STEEL | 1,513 LB | $1.25 | $1.40 | $1.00 | $1.20 | $1.10 | $2.25 |
| 509E30020 NO. 4 GFRP DEFORMED BARS | 5,518 FT | $1.48 | $2.00 | $2.00 | $1.60 | $1.60 | $1.65 |
| 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT | 498 EACH | $25.00 | $26.00 | $25.00 | $29.00 | $25.00 | $20.00 |
| 511E33501 SEMI-INTEGRAL DIAPHRAGM GUIDE, AS PER PLAN | 2 EACH | $3,500 | $5,600 | $3,370 | $3,100 | $4,000 | $2,000 |
| 511E34450 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK (PARAPE | 57 CY | $400 | $1,000 | $400 | $605 | $450 | $525 |
| 511E42510 CLASS QC1 CONCRETE, PIER CAP | 16 CY | $1,500 | $1,100 | $2,500 | $1,350 | $1,200 | $1,200 |
| 511E44110 CLASS QC1 CONCRETE, ABUTMENT NOT INCLUDING FOOTING | 31 CY | $550 | $1,250 | $1,700 | $1,050 | $1,000 | $700 |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 14 CY | $400 | $815 | $1,500 | $620 | $750 | $515 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 989 SY | $30.00 | $21.00 | $19.00 | $21.00 | $21.00 | $21.00 |
| 513E20000 WELDED STUD SHEAR CONNECTORS | 2,115 EACH | $3.10 | $4.25 | $4.00 | $4.25 | $4.25 | $4.45 |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 420 SF | $45.00 | $40.00 | $103 | $175 | $175 | $180 |
| 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME | 1,538 SF | $11.00 | $10.00 | $16.00 | $10.00 | $10.00 | $10.00 |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 1,538 SF | $11.00 | $10.00 | $16.00 | $10.00 | $10.00 | $10.00 |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 1,538 SF | $11.00 | $10.00 | $16.00 | $10.00 | $10.00 | $10.00 |
| 514E00504 GRINDING FINS, TEARS, SLIVERS ON EXISTING STRUCTUR | 2 MNHR | $110 | $100 | $163 | $200 | $200 | $200 |
| 514E10000 FINAL INSPECTION REPAIR | 2 EACH | $450 | $400 | $920 | $200 | $200 | $200 |
| 516E13900 2" PREFORMED EXPANSION JOINT FILLER | 193 SF | $10.00 | $16.00 | $9.00 | $10.00 | $10.00 | $7.50 |
| 516E14020 SEMI-INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 142 FT | $35.00 | $43.00 | $32.00 | $33.00 | $35.00 | $40.00 |
| 516E44000 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 10 EACH | $500 | $700 | $615 | $1,000 | $850 | $500 |
| 516E44200 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 10 EACH | $1,250 | $1,260 | $1,300 | $1,000 | $1,725 | $1,225 |
| 516E47001 JACKING AND TEMPORARY SUPPORT OF SUPERSTRUCTURE, A | 1 LS | $70,000 | $67,000 | $45,000 | $45,000 | $15,000 | $70,000 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 66 CY | $90.00 | $100 | $85.00 | $80.00 | $100 | $76.50 |
| 526E15000 REINFORCED CONCRETE APPROACH SLABS (T=13") | 191 SY | $225 | $315 | $290 | $240 | $275 | $260 |
| 526E90010 TYPE A INSTALLATION | 112 FT | $150 | $245 | $162 | $120 | $125 | $140 |
| 601E20001 CRUSHED AGGREGATE SLOPE PROTECTION, AS PER PLAN | 78 SY | $65.00 | $58.00 | $70.00 | $21.00 | $35.00 | $26.50 |
| 846E00110 POLYMER MODIFIED ASPHALT EXPANSION JOINT SYSTEM | 47 CF | $410 | $500 | $530 | $500 | $450 | $430 |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $90,000 | $208,000 | $82,000 | $75,000 | $135,000 | $195,000 |
| 202E22900 APPROACH SLAB REMOVED | 133 SY | $20.00 | $50.00 | $23.00 | $33.00 | $35.00 | $26.00 |
| 202E23500 WEARING COURSE REMOVED | 133 SY | $20.00 | $2.00 | $15.00 | $4.00 | $5.00 | $9.00 |
| 503E11101 COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN | 1 LS | $1,000 | $1,000 | $15,000 | $1.00 | $15,000 | $500 |
| 503E21100 UNCLASSIFIED EXCAVATION | 74 CY | $85.00 | $120 | $71.00 | $170 | $100 | $115 |
| 509E10001 EPOXY COATED REINFORCING STEEL, AS PER PLAN | 73,748 LB | $1.35 | $1.45 | $2.00 | $1.40 | $1.60 | $1.28 |
| 509E25000 UNCOATED REINFORCING STEEL | 1,579 LB | $1.24 | $1.40 | $1.00 | $1.20 | $1.10 | $2.25 |
| 509E30020 NO. 4 GFRP DEFORMED BARS | 5,548 FT | $1.48 | $2.00 | $2.00 | $1.60 | $1.60 | $1.65 |
| 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT | 498 EACH | $25.00 | $26.00 | $25.00 | $29.00 | $25.00 | $20.00 |
| 511E33501 SEMI-INTEGRAL DIAPHRAGM GUIDE, AS PER PLAN | 2 EACH | $3,500 | $5,500 | $3,300 | $3,100 | $4,000 | $2,000 |
| 511E34450 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK (PARAPE | 57 CY | $400 | $1,000 | $430 | $625 | $450 | $525 |
| 511E42510 CLASS QC1 CONCRETE, PIER CAP | 18 CY | $1,500 | $1,100 | $2,300 | $1,300 | $1,200 | $1,200 |
| 511E44110 CLASS QC1 CONCRETE, ABUTMENT NOT INCLUDING FOOTING | 33 CY | $550 | $1,250 | $1,600 | $1,000 | $1,000 | $680 |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 15 CY | $400 | $815 | $1,400 | $590 | $750 | $550 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 995 SY | $28.00 | $21.00 | $20.00 | $21.00 | $21.00 | $21.00 |
| 513E20000 WELDED STUD SHEAR CONNECTORS | 2,085 EACH | $3.10 | $4.25 | $4.00 | $4.25 | $4.25 | $4.45 |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 420 SF | $43.00 | $40.00 | $103 | $175 | $175 | $180 |
| 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME | 1,538 SF | $11.00 | $10.00 | $16.00 | $10.00 | $10.00 | $10.00 |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 1,538 SF | $11.00 | $10.00 | $16.00 | $10.00 | $10.00 | $10.00 |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 1,538 SF | $11.00 | $10.00 | $16.00 | $10.00 | $10.00 | $10.00 |
| 514E00504 GRINDING FINS, TEARS, SLIVERS ON EXISTING STRUCTUR | 2 MNHR | $110 | $100 | $136 | $200 | $200 | $200 |
| 514E10000 FINAL INSPECTION REPAIR | 2 EACH | $450 | $400 | $920 | $200 | $200 | $200 |
| 516E13900 2" PREFORMED EXPANSION JOINT FILLER | 200 SF | $10.00 | $15.00 | $8.00 | $10.00 | $10.00 | $7.50 |
| 516E14020 SEMI-INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 146 FT | $40.00 | $43.00 | $30.00 | $32.00 | $35.00 | $40.00 |
| 516E44000 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 10 EACH | $500 | $700 | $600 | $1,000 | $850 | $500 |
| 516E44200 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 10 EACH | $1,250 | $1,260 | $1,300 | $1,000 | $1,725 | $1,250 |
| 516E47001 JACKING AND TEMPORARY SUPPORT OF SUPERSTRUCTURE, A | 1 LS | $70,000 | $67,000 | $45,000 | $45,000 | $15,000 | $70,000 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 70 CY | $80.00 | $107 | $80.00 | $85.00 | $100 | $78.00 |
| 526E15000 REINFORCED CONCRETE APPROACH SLABS (T=13") | 191 SY | $225 | $315 | $275 | $235 | $275 | $265 |
| 526E90010 TYPE A INSTALLATION | 112 FT | $150 | $245 | $175 | $120 | $125 | $140 |
| 601E20001 CRUSHED AGGREGATE SLOPE PROTECTION, AS PER PLAN | 160 SY | $65.00 | $56.00 | $57.00 | $21.00 | $35.00 | $25.00 |
| 846E00110 POLYMER MODIFIED ASPHALT EXPANSION JOINT SYSTEM | 47 CF | $410 | $500 | $500 | $500 | $450 | $430 |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $83,000 | $175,000 | $50,000 | $140,000 | $50,000 | $100,000 |
| 202E22900 APPROACH SLAB REMOVED | 278 SY | $20.00 | $50.00 | $9.00 | $40.00 | $25.00 | $26.00 |
| 202E23500 WEARING COURSE REMOVED | 278 SY | $20.00 | $1.50 | $4.00 | $4.00 | $5.00 | $8.00 |
| 203E65000 SPECIAL - SETTLEMENT PLATFORM | 2 EACH | $1,500 | $2,000 | $3,700 | $1,500 | $1,500 | $1,500 |
| 202E23000 PAVEMENT REMOVED | 2,880 SY | $6.00 | $7.00 | $4.00 | $6.00 | $8.00 | $15.00 |
| 202E30701 CONCRETE BARRIER REMOVED, AS PER PLAN | 600 FT | $5.00 | $12.00 | $6.00 | $5.00 | $5.00 | $12.00 |
| 209E72050 PREPARING SUBGRADE FOR SHOULDER PAVING | 0.16 MILE | $25,000 | $24,150 | $14,000 | $24,150 | $24,150 | $25,500 |
| 253E01000 PAVEMENT REPAIR | 360 SY | $45.00 | $115 | $172 | $45.00 | $175 | $125 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1 1/4" | 6,860 SY | $2.50 | $2.50 | $7.00 | $2.50 | $2.50 | $2.65 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1 3/4" | 2,950 SY | $2.80 | $2.80 | $6.00 | $2.80 | $2.80 | $2.95 |
| 255E20000 FULL DEPTH PAVEMENT SAWING | 1,763 FT | $3.00 | $2.00 | $2.64 | $4.00 | $2.50 | $2.65 |
| 407E13900 TACK COAT, 702.13 | 32 GAL | $5.00 | $5.00 | $3.00 | $5.00 | $5.00 | $5.20 |
| 407E20000 NON-TRACKING TACK COAT | 850 GAL | $2.35 | $2.35 | $2.70 | $2.35 | $2.35 | $2.50 |
| 410E10000 TRAFFIC COMPACTED SURFACE, TYPE A | 100 CY | $55.00 | $54.00 | $120 | $55.00 | $75.00 | $68.00 |
| 411E10000 STABILIZED CRUSHED AGGREGATE | 209 CY | $66.00 | $107 | $128 | $70.00 | $100 | $100 |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 240 CY | $179 | $179 | $212 | $179 | $179 | $190 |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (145 CY | $169 | $168 | $177 | $168 | $168 | $176 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 400 HOUR | $65.00 | $75.00 | $68.00 | $67.50 | $70.00 | $71.00 |
| 614E11630 INCREASED BARRIER DELINEATION | 975 FT | $1.00 | $0.76 | $1.00 | $3.00 | $1.12 | $3.00 |
| 614E12380 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $3,000 | $2,250 | $2,000 | $2,250 | $1,940 | $2,100 |
| 614E12420 DETOUR SIGNING | 1 LS | $11,000 | $10,630 | $11,000 | $10,630 | $10,630 | $12,000 |
| 614E12756 WORK ZONE CROSSOVER LIGHTING SYSTEM | 3 EACH | $26,000 | $26,000 | $27,000 | $21,780 | $21,750 | $27,250 |
| 614E12801 WORK ZONE RAISED PAVEMENT MARKER, AS PER PLAN | 1,902 EACH | $40.00 | $6.05 | $5.50 | $37.50 | $7.50 | $16.00 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 76 CY | $190 | $525 | $300 | $305 | $188 | $205 |
| 614E13001 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC, AS PER P | 60 CY | $274 | $200 | $740 | $274 | $274 | $290 |
| 614E13310 BARRIER REFLECTOR, TYPE 1, ONE WAY | 228 EACH | $15.00 | $5.65 | $10.00 | $12.00 | $8.25 | $8.50 |
| 614E13312 BARRIER REFLECTOR, TYPE 2, ONE WAY | 36 EACH | $7.00 | $6.85 | $49.00 | $12.00 | $9.91 | $8.50 |
| 614E13350 OBJECT MARKER, ONE WAY | 92 EACH | $20.00 | $13.25 | $17.00 | $18.00 | $12.40 | $15.00 |
| 614E13360 OBJECT MARKER, TWO WAY | 21 EACH | $20.00 | $16.50 | $21.00 | $18.00 | $16.76 | $16.00 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 70 SNMT | $500 | $500 | $850 | $500 | $500 | $750 |
| 614E20011 WORK ZONE LANE LINE, CLASS I, 6", AS PER PLAN | 3.12 MILE | $600 | $600 | $630 | $600 | $600 | $625 |
| 614E21001 WORK ZONE CENTER LINE, CLASS I, AS PER PLAN | 0.29 MILE | $1,500 | $1,500 | $1,500 | $1,500 | $1,500 | $1,550 |
| 614E22011 WORK ZONE EDGE LINE, CLASS I, 6", AS PER PLAN | 16.65 MILE | $675 | $675 | $713 | $675 | $675 | $700 |
| 614E23011 WORK ZONE CHANNELIZING LINE, CLASS I, 12", AS PER | 1,243 FT | $0.60 | $0.60 | $0.60 | $0.60 | $0.60 | $0.60 |
| 614E24001 WORK ZONE DOTTED LINE, CLASS I, AS PER PLAN | 3,824 FT | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 614E26001 WORK ZONE STOP LINE, CLASS I, AS PER PLAN | 82 FT | $3.50 | $3.50 | $3.70 | $3.50 | $3.50 | $3.65 |
| 614E30000 WORK ZONE ARROW, CLASS I | 5 EACH | $40.00 | $40.00 | $42.00 | $40.00 | $40.00 | $40.00 |
| 616E10000 WATER | 180 MGAL | $1.00 | $60.00 | $40.00 | $55.00 | $65.00 | $5.00 |
| 618E40101 RUMBLE STRIPS, SHOULDER (ASPHALT CONCRETE), AS PER | 11,550 FT | $0.42 | $3.55 | $3.00 | $3.60 | $3.55 | $3.80 |
| 621E00100 RPM | 20 EACH | $75.00 | $200 | $44.00 | $75.00 | $200 | $44.00 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 20 EACH | $20.00 | $10.05 | $9.00 | $10.00 | $9.42 | $20.00 |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 3,400 FT | $16.00 | $17.00 | $8.00 | $10.00 | $10.00 | $13.50 |
| 622E41101 PORTABLE BARRIER, UNANCHORED, AS PER PLAN | 3,040 FT | $17.00 | $20.00 | $13.00 | $12.00 | $12.00 | $18.00 |
| 622E41111 PORTABLE BARRIER, ANCHORED, AS PER PLAN | 655 FT | $44.00 | $30.00 | $30.00 | $35.00 | $21.50 | $21.00 |
| 646E10000 EDGE LINE, 4" | 0.5 MILE | $3,800 | $3,800 | $4,000 | $3,800 | $3,800 | $4,100 |
| 646E10010 EDGE LINE, 6" | 0.31 MILE | $4,400 | $4,350 | $4,500 | $4,350 | $4,350 | $4,700 |
| 646E10200 CENTER LINE | 0.25 MILE | $7,000 | $7,000 | $7,300 | $7,000 | $7,000 | $7,550 |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $7,000 | $10,000 | $20,000 | $15,000 | $15,000 | $20,000 |
| 202E30600 CONCRETE MEDIAN REMOVED | 12 SY | $50.00 | $300 | $67.00 | $80.00 | $40.00 | $35.00 |
| 202E38000 GUARDRAIL REMOVED | 325 FT | $2.00 | $2.50 | $2.00 | $5.21 | $2.00 | $2.00 |
| 203E10000 EXCAVATION | 11 CY | $25.00 | $20.00 | $33.00 | $20.00 | $20.00 | $110 |
| 203E20000 EMBANKMENT | 29 CY | $30.00 | $5.00 | $25.00 | $20.00 | $20.00 | $25.00 |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 325 FT | $24.00 | $32.00 | $24.00 | $23.20 | $23.20 | $24.60 |
| 601E21050 TIED CONCRETE BLOCK MAT WITH TYPE 1 UNDERLAYMENT | 2 SY | $175 | $110 | $220 | $250 | $175 | $275 |
| 659E00300 TOPSOIL | 63 CY | $20.00 | $40.00 | $69.00 | $20.00 | $20.78 | $40.00 |
| 659E10000 SEEDING AND MULCHING | 571 SY | $3.00 | $1.00 | $2.80 | $6.00 | $6.00 | $1.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.08 TON | $400 | $1,000 | $800 | $850 | $850 | $1,000 |
| 659E31000 LIME | 0.12 ACRE | $20.00 | $50.00 | $160 | $100 | $100 | $30.00 |
| 659E35000 WATER | 3 MGAL | $0.50 | $1.00 | $1.00 | $1.00 | $1.00 | $2.00 |
| 832E30000 EROSION CONTROL | 10,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 605E13300 6" UNCLASSIFIED PIPE UNDERDRAINS | 20 FT | $15.00 | $18.00 | $26.00 | $33.00 | $16.00 | $10.00 |
| 605E31100 AGGREGATE DRAINS | 20 FT | $15.00 | $14.00 | $25.00 | $33.00 | $27.00 | $10.00 |
| 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS | 20 FT | $15.00 | $35.00 | $27.00 | $19.00 | $18.00 | $10.00 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 1 EACH | $225 | $365 | $360 | $360 | $250 | $290 |
| 408E10001 PRIME COAT, AS PER PLAN | 29 GAL | $10.00 | $10.00 | $3.00 | $10.00 | $10.00 | $10.00 |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 4 CY | $180 | $180 | $200 | $180 | $180 | $190 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, ONE-WAY | 4 EACH | $8.00 | $9.00 | $30.00 | $20.00 | $8.00 | $10.00 |
| 642E30000 REMOVAL OF PAVEMENT MARKING | 140 FT | $10.00 | $2.00 | $26.00 | $2.35 | $1.50 | $19.00 |
| 203E07502 SPECIAL - INCLINOMETER | 1 EACH | $3,600 | $3,500 | $1,200 | $3,000 | $2,000 | $3,600 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 100 HOUR | $65.00 | $75.00 | $68.00 | $67.50 | $70.00 | $71.00 |
| 614E12460 WORK ZONE MARKING SIGN | 10 EACH | $85.00 | $85.00 | $90.00 | $85.00 | $85.00 | $100 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 30 CY | $220 | $150 | $238 | $360 | $250 | $180 |
| 614E13310 BARRIER REFLECTOR, TYPE 1, ONE-WAY | 10 EACH | $15.00 | $5.65 | $16.00 | $10.00 | $8.25 | $8.00 |
| 614E13350 OBJECT MARKER, ONE WAY | 10 EACH | $20.00 | $13.25 | $22.00 | $18.00 | $12.40 | $12.00 |
| 614E22010 WORK ZONE EDGE LINE, CLASS I, 6" | 0.78 MILE | $1,500 | $1,500 | $1,500 | $1,500 | $1,500 | $5,200 |
| 616E10000 WATER | 3 MGAL | $0.10 | $65.00 | $60.00 | $65.00 | $100 | $5.00 |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 500 FT | $12.00 | $12.00 | $7.00 | $12.00 | $8.00 | $15.00 |
| 209E60200 LINEAR GRADING | 264 STA | $65.00 | $30.36 | $106 | $65.00 | $65.00 | $68.00 |
| 659E10000 SEEDING AND MULCHING | 7,334 SY | $0.90 | $0.93 | $1.00 | $1.00 | $1.00 | $1.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.98 TON | $400 | $1,000 | $820 | $850 | $850 | $1,000 |
| 659E31000 LIME | 1.51 ACRE | $50.00 | $50.00 | $160 | $100 | $100 | $30.00 |
| 659E35000 WATER | 39.6 MGAL | $0.10 | $1.00 | $1.00 | $1.00 | $1.00 | $2.00 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 203E10000 EXCAVATION (FOR PAVEMENT REPAIR) | 10 CY | $100 | $120 | $70.00 | $30.00 | $30.00 | $20.00 |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) | 250 SY | $45.00 | $45.00 | $62.00 | $45.00 | $45.00 | $46.00 |
| 255E10010 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT, | 50 SY | $175 | $250 | $250 | $175 | $200 | $130 |
| 255E20000 FULL DEPTH PAVEMENT SAWING | 300 FT | $5.00 | $2.00 | $3.00 | $4.00 | $2.50 | $2.60 |
| 304E20000 AGGREGATE BASE (FOR PAVEMENT REPAIR) | 10 CY | $71.00 | $300 | $116 | $85.00 | $75.00 | $60.00 |
| 407E20000 NON-TRACKING TACK COAT | 8,761 GAL | $2.35 | $2.35 | $2.70 | $2.35 | $2.35 | $2.45 |
| 408E10001 PRIME COAT, AS PER PLAN @ 0.4 GAL/SY | 3,065 GAL | $3.90 | $3.90 | $3.00 | $3.90 | $3.90 | $4.15 |
| 442E00100 ANTI-SEGREGATION EQUIPMENT | 3,982 CY | $3.40 | $3.40 | $1.60 | $3.40 | $3.40 | $3.60 |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 426 CY | $55.00 | $55.00 | $82.00 | $55.00 | $55.00 | $55.00 |
| 618E40600 RUMBLE STRIPS, SHOULDER (ASPHALT CONCRETE) | 7 MILE | $2,000 | $700 | $740 | $700 | $700 | $1,000 |
| 850E10010 GROOVING FOR 6" RECESSED PAVEMENT MARKING | — | $2,850 | $3,150 | $3,000 | $2,850 | $3,150 | $3,400 |
| 850E10130 GROOVING FOR 12" RECESSED PAVEMENT MARKING | — | $2.75 | $2.75 | $2.90 | $2.75 | $2.75 | $3.00 |
| 850E20010 GROOVING FOR 6" RECESSED PAVEMENT MARKING | — | $5,000 | $4,985 | $5,300 | $4,985 | $4,985 | $5,400 |
| 875E10000 LONGITUDINAL JOINT ADHESIVE | 3,921 LB | $1.33 | $2.20 | $0.65 | $2.20 | $2.20 | $2.30 |
| 621E00100 RPM | 233 EACH | $36.00 | $35.75 | $48.00 | $35.75 | $35.75 | $50.00 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 187 EACH | $18.50 | $10.05 | $6.00 | $7.00 | $10.08 | $20.00 |
| 646E10400 STOP LINE | 28 FT | $20.00 | $20.00 | $21.00 | $20.00 | $20.00 | $21.50 |
| 646E20320 WRONG WAY ARROW | 2 EACH | $200 | $200 | $210 | $200 | $200 | $215 |
| 807E12010 WET REFLECTIVE EPOXY PAVEMENT MARKING, EDGE LINE, | 18.92 MILE | $4,400 | $4,350 | $4,500 | $4,350 | $4,350 | $4,700 |
| 807E12110 WET REFLECTIVE EPOXY PAVEMENT MARKING, LANE LINE, | 8.63 MILE | $3,400 | $3,350 | $3,500 | $3,350 | $3,350 | $3,620 |
| 807E12310 WET REFLECTIVE EPOXY PAVEMENT MARKING, CHANNELIZIN | 1,290 FT | $3.00 | $2.85 | $3.00 | $2.85 | $2.85 | $3.00 |
| 807E12410 WET REFLECTIVE EPOXY PAVEMENT MARKING, DOTTED LINE | 1,250 FT | $3.00 | $2.85 | $3.00 | $2.85 | $2.85 | $3.00 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 50 HOUR | $65.00 | $75.00 | $68.00 | $67.50 | $70.00 | $67.00 |
| 614E12420 DETOUR SIGNING | 1 LS | $20,000 | $5,450 | $14,000 | $13,400 | $13,400 | $10,000 |
| 614E12460 WORK ZONE MARKING SIGN | 40 EACH | $85.00 | $110 | $90.00 | $85.00 | $85.00 | $100 |
| 614E12484 WORK ZONE INCREASED PENALTIES SIGN | 10 EACH | $200 | $185 | $160 | $200 | $192 | $200 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 20 CY | $500 | $300 | $265 | $300 | $250 | $184 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 6 SNMT | $900 | $535 | $1,000 | $900 | $900 | $1,000 |
| 614E20110 WORK ZONE LANE LINE, CLASS I, 6", 642 PAINT | 5.1 MILE | $675 | $675 | $713 | $675 | $675 | $700 |
| 614E20560 WORK ZONE LANE LINE, CLASS III, 6", 642 PAINT | 2.55 MILE | $700 | $700 | $740 | $700 | $700 | $730 |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 7.3 MILE | $635 | $635 | $672 | $635 | $635 | $665 |
| 614E23210 WORK ZONE CHANNELIZING LINE, CLASS I, 12", 642 PAI | 2,580 FT | $0.60 | $0.60 | $0.70 | $0.60 | $0.60 | $0.60 |
| 614E23690 WORK ZONE CHANNELIZING LINE, CLASS III, 12", 642 P | 1,290 FT | $0.60 | $0.60 | $0.70 | $0.60 | $0.60 | $0.60 |
| 100E50200 DEPARTMENT'S SHARE OF THE DISPUTE RESOLUTION ADVIS | 1 LS | $23,000 | $23,000 | $23,000 | $23,000 | $23,000 | $23,000 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $45,000 | $115,000 | $48,000 | $51,500 | $90,000 | $100,000 |
| 619E16010 FIELD OFFICE, TYPE B | 22 MNTH | $1,200 | $1,500 | $2,500 | $3,000 | $2,500 | $1,850 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $55,000 | $32,000 | $70,000 | $50,000 | $85,000 | $75,000 |
| 690E98400 SPECIAL - SURVEY CONTROL VERIFICATION | 1 LS | $1,000 | $2,000 | $6,000 | $6,000 | $8,500 | $5,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 442E10001 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 2,808 CY | $172 | $483k | 6% |
| 203E20000 EMBANKMENT | 34,490 CY | $13.9 | $479k | 6% |
| 442E10100 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE | 2,808 CY | $140 | $393k | 5% |
| 524E94501 DRILLED SHAFTS, 24" DIAMETER, AS PER PLAN | 2,100 FT | $170 | $357k | 4% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $350,000 | $350k | 4% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 2,503 CY | $118 | $295k | 4% |
| 615E20000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A | 5,324 SY | $53 | $282k | 3% |
| 615E10001 ROADS FOR MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $209,000 | $209k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $200,000 | $200k | 2% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (T = 3") | 67,386 SY | $2.7 | $182k | 2% |